Laserfiche WebLink
Version: May 19, 2022 <br /> In addition to those exemptions, project sites, or portions of project sites, that potentially contribute <br /> stormwater to the city's latest designated combined sewer system (as set forth in EMC 14.08.040.B) shall <br /> not be subject to this chapter. The combined sewer system routes stormwater for treatment at the <br /> publicly owned treatment works. Requirements for detention and flow control are determined by <br /> evaluating the capacity of the combined sewer system as set forth in EMC 14.08. <br /> 14.28.050 Development in critical areas. <br /> Critical areas are governed by EMC 19.37. <br /> 14.28.060 City assumption of responsibility for on-site stormwater facilities <br /> In the event that public benefits would accrue due to modification of the stormwater site plan for a subject <br /> property to better implement the city's surface water goals, the city may assume responsibility for the <br /> further design, construction, operation and maintenance of the stormwater facilities, or any increment of <br /> the responsibility of the facilities on the subject property. Such decision shall be made concurrently with <br /> review and approval of the stormwater site plan as specified in this chapter. In the event that the city <br /> decides to assume responsibility for all or any portion of the design, construction, operation and <br /> maintenance of the site-specific stormwater facilities, the developer will be required to contribute a pro <br /> rata share to the construction cost of the facilities. The developer may be required to supply additional <br /> information at the request of the Director to aid in the determination by the city. Guidelines for <br /> implementing this section will be defined in the City of Everett stormwater management manual or by the <br /> Director. <br /> 14.28.070 Regional Stormwater Facilities Payment In-Lieu-of Construction Program. <br /> A. Regional Stormwater Facilities. The city may establish, at its sole discretion, regional stormwater <br /> facilities to provide for water quality treatment, control of flow rates, or other benefits for stormwater runoff <br /> from areas within the city. The benefits of these regional stormwater facilities may be made available to <br /> compensate for required stormwater mitigation associated with development, subject to the requirements <br /> of this section. The Director shall establish a Regional Stormwater Facility Plan that: <br /> 1. Provides for tracking of existing and proposed regional stormwater facilities. <br /> 2. Identifies location, size, type and capacity of city owned stormwater facilities which are <br /> considered regional stormwater facilities. <br /> 3. Establishes a means of tracking provided and used capacity of the regional stormwater facility in <br /> accordance with the requirements in the Stormwater management manual and this section. <br /> 7 <br />