Laserfiche WebLink
Interstate Local Access and Other Projects(continued) <br /> 1. I-5/Downtown Everett Interchange Access Improvements 1. Bridge Rehabilitation Program (Maintenance) <br /> (Everett Ave.Hewitt Ave.,US 2,Pacific Ave) 2. Annual Pavement Maintenance Program (Maintenance) <br /> 2. I-5/ 100th Street SE HOV Access/Undercrossing 3. Sidewalk repair and replacement (Maintenance) <br /> 3. NB Everett Mall Way/SB I-5 Onramp 4. Pavement marking projects (Maintenance) <br /> 4. 1-5/Smith Island Interchange(1-5&SR 529) 1. 106th Place SE Improvements (Street) <br /> 5. 1-5 NB HOV Lane(US 2 to SR 528) 2. 3rd Avenue SE Improvements (Street) <br /> 6. I-5/East Marine View Drive Interchange Improvements 3. Local Street Improvements (Street) <br /> 7. I-5/128th Street Interchange 4. Upper&Lower Ridge Rd.Improvements (Street) <br /> 8. 1-5/128th Street HOV Ramps (Mariner Park&Ride) 5. Riverfront Site Access Improvements (Street) <br /> 9. I-5/112th Street Interchange Study 6. Downtown Streetscape Improvements (Street) <br /> 1. Traffic Signal Central System (Traffic Signals) <br /> Freeways 2. Traffic Signal Interconnect (Traffic Signals) <br /> 1. US 2 Improvements(SR 204 to 1-5) 3. Traffic Signal Improvements (Traffic Signals) <br /> 2. SR 526 Corridor Improvements 4. Traffic Sign Improvements (Traffic Signals) <br /> 3. SR 526 Extension(I-5 to US 2) 1. Neighborhood Block Grants (Neighborhoods) <br /> 4. SR 526/Evergreen Way Interchange 2. Neighborhood Traffic Studies/Project (Neighborhoods) <br /> 5. SR 529/Smith Island Ramps 3. Residential Sidewalks (Neighborhoods) <br /> 6. SR 526/40th Avenue W.Intersection Improvements <br /> Non-Motorized Trail/Path Improvements <br /> Principal Arterials 1. Smith Island Bike and Pedestrian Improvements <br /> 1. W.Marine View Dr./Rucker/41st Freight Route Improvements 2. Bicycle Master Plan Implementation <br /> 2. Broadway Corridor Improvements (SR 526 to SR 529) 3. California Street Bicycle Pedestrian Corridor <br /> 3. SE Everett Mall Way(SR 99 to SR 526) 4. Fleming St.Bicycle Corridor <br /> 4. Arterial Safety Projects 5. Fulton St.Bicycle Pedestrian Corridor <br /> 5. Evergreen Way Improvements (41st St.to Gibson Road) 6. N.Broadway Pedestrian Bridge <br /> 6. Evergreen Way Streetscape Improvements 7. 75th St.SW(Hardeson Rd.to Seaway Blvd.) <br /> 7. I-5 to Port of Everett Truck Route 8. Riverside Bus Pk.Ped.Trail(16th to N.Broadway) <br /> 8. Mukilteo Blvd.Safety Imp.(Friday Ave.to City Limits) 9. West/East Marine View Drive Bike-Ped Improvements <br /> 9. Arterial Needs Study 10. 47th Street Ped Improvements (Evgreen to Black Forest Lane) <br /> 10. Edgewater Creek Bridge Replacement 11. Pigeon Creek No.1/BNSF Rail Line Crossing <br /> 11. Merrill&Ring Creek Bridge Replacement 12. Grand Avenue/North Marina Ped-Bike Connection <br /> 12. Marshland Bridge Replacement 13. Shoreline Access Imp. (Various Locations) <br /> Minor Arterials 14. Pigeon Creek Rd.No. 1 Improvements <br /> 1. 116th Street SE Street Improvements(SR 527 to 35th) 15. Everett Non-motorized Projects(Various Locations in Everett) <br /> 16. Lowell Snohomish River Road.Bike/Ped Connection <br /> 2. 100th Street SW Street Improvements(4th Ave.W.to Airport) 17. Riverfront District Bike/Ped Paths <br /> 3. Casino Rd.Safety Improvements(Evergreen to 5th Ave.) 18. Interurban Trail Bike/Ped Path Improvements <br /> 4. 4th Avenue West Improvements(104th to 112th) 19. Bicycle Detection Signals <br /> 5. 100th Street SE Improvements (SR 527 to 7th Ave SE) 20. ADA Signals (Accessible Pedestrian Signals(APS)) <br /> 6. 100th Street SE Improvements (7th Ave to Evergreen) 21. ADA Ramp <br /> 7. 110th Street SE Improvements (SR 527 to 35th St.) 22. Waterfront Place Esplanade <br /> 8. Lenora St./Lowell-River Rd./BNSF Rail Line Xing Transit <br /> 9. Minor Arterial Streetscape Improvements 1. Bus Replacements 2023-2028 <br /> Collector Arterials 2. Implementation of State CTR Law <br /> 1. East Everett Avenue/BNSF Overcrossing 3. Everett Station Repair and Updates <br /> 2. Bond Street Ped/Bike Improvements.(Kromer to Terminal) 4. Operations Base Relocation and Construction <br /> 3. Chestnut St. /Eclipse Mill Road.Improvements(Pacific to 36th) 5. Safety and Security Enhancements <br /> 4. Silver Lake Road-121st Street SE Ped.Improvements 6. On Board ITS replacement&upgrade <br /> 5. 37th Street Improvements (Rucker to Broadway) 7. Service Planning&Development Software/Hardware <br /> 6. Collector Arterial Streetscape Improvements 8. Next Generation ORCA Project Cost Share w/region <br /> 9. Next Generation ORCA Project Hardware Installation <br /> High Capacity Transit 10. Alternative to fixed route demonstration <br /> 1. Light Rail-Lynnwood to Everett Extension 11. Replace Vehicle Wash System <br /> 2. Light Rail Stations 12. Replace Vehicle maintenance facility <br /> 3. HCT Support Program 13. Generator <br /> 14. Inductive Charging Infrastructure <br /> Local Access and Other Projects 15. Electronic Signage(EVST/College/Mall) <br /> 1. BNSF RR safety improvements (Safety) 16. Infotainment on buses <br /> 2. Local roadway safety projects (Safety) 17. Shelter Replacement <br /> 3. Safe routes to schools (Safety) Port-Marine Industrial Transportation Improvements <br /> 1. Marine Terminals Maintenance and Expansion <br /> 2. Harbor and Snohomish River Federal Navigation Channel <br /> Improvements <br /> 3. SR 529(W.Marine View Drive)Bulkhead Rehabilitation <br /> 1 <br />