CITY OF EVERETT 2023 TO 2028 SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM
<br /> PROJECT PROJECT ESTIMATED LEAD MAP
<br /> # TYPE PROJECT NAME TERMINI COST AGENCY PAGE#
<br /> 1 Interstate I-5 Downtown interchange improvements Pacific,Everett,Hewitt Ayes.,and US 2 $28,500,000 EVERETT 5
<br /> 2 Interstate I-5/100th Street SE HOV Access/Undercrossing I-5 at 100th Street SE $68,500,000 EVERETT 6
<br /> 3 Interstate NB Everett Mall Way to SB 1-5 Onramp Everett Mall Way to southbound I-5 $3,500,000 WSDOT 7
<br /> 4 Interstate I-5/Smith Island interchange 12th Ave.NE or SR 529 $10,000,000 EVERETT 8
<br /> 5 Interstate 1-5/East Marine View Drive Interchange I-5 at East Marine View Drive $16,000,000 EVERETT 9
<br /> 6 Interstate 1-5 HOV Lanes US 2 to SR 528 $5,000,000 WSDOT 10
<br /> 7 Interstate 1-5/128th Street Interchange I-5 at 128th Street $2,000,000 WSDOT 11
<br /> 8 Interstate 1-5/128th Street HOV Ramps(Mariner PNR) 1-5 at 128th Street/Mariner Park and Ride $6,000,000 WSDOT 12
<br /> 9 Interstate I-5/112th Street Interchange Study I-5 at 112th Street SE $3,000,000 WSDOT 13
<br /> 10 Freeway US 2 Improvements 1-5 to SR 204 $3,000,000 WSDOT 14
<br /> 11 Freeway SR 526/Hardeson Road Interchange SR 526 at Hardeson Road $2,000,000 WSDOT 15
<br /> 12 Freeway SR 526 Extension Study SR 526 to US 2 $8,500,000 WSDOT 16
<br /> 13 Freeway SR 526/Evergreen Way Interchange SR 526 at Evergreen Way $38,000,000 WSDOT 17
<br /> 14 Freeway SR 526/40th Avenue West Intersection SR 526 and 40th Avenue West $500,000 EVERETT 18
<br /> 15 Freeway SR 529/Smith Island Ramps SR 529 at Smith Island $250,000 WSDOT 19
<br /> 16 Principal Arterial W.Marine View Dr./Rucker Ave./41st St.Freight Route W.Marine View Dr.,Rucker Ave,41st Street $42,800,000 EVERETT 20
<br /> 17 Principal Arterial Broadway Corridor Improvements SR 526 to SR 529 $4,000,000 EVERETT 21
<br /> 18 Principal Arterial SE Everett Mall Way SR 99 to SR 526 $1,000,000 EVERETT 22
<br /> 19 Principal Arterial Arterial Safety Projects(Forest Pk entrances;1-S and Pacific) Various Locations $900,000 EVERETT
<br /> 20 Principal Arterial Evergreen Way Improvements,41st to Airport Road 41st to Airport Road $1,000,000 EVERETT 23
<br /> 21 Principal Arterial Evergreen Way Streetscape Improvements 41st to Airport Road $20,000,000 EVERETT
<br /> 22 Principal Arterial Interstate 5 to Port of Everett Truck Route Plan Port of Everett to I-5 $200,000 EVERETT
<br /> 23 Principal Arterial Mukilteo Blvd.Safety Improvements Friday Avenue to city limits $3,300,000 EVERETT 24
<br /> 24 Principal Arterial Arterial Needs Study Various arterials within city limits $200,000 EVERETT
<br /> 25 PrincipalArterial Edgewater Cr.Bridge Replacement Mukilteo Blvd-Bridge at city limits $16,000,000 EVERETT 25
<br /> 26 Principal Arterial Merrill&Ring Creek Bridge Replacement Mukilteo Blvd-W of Harbor Ln $16,000,000 EVERETT 26
<br /> 27 Principal Arterial Marshland Bridge Replacement Lowell-Snohomish River Rd $15,000,000 EVERETT 27
<br /> 28 Minor Arterial 116th Street SE Improvements SR 527 to 35th Street SE $3,800,000 EVERETT 28
<br /> 29 Minor Arterial 100th Street SW Improvements Airport Road to 4th Avenue West $3,600,000 EVERETT 29
<br /> 30 Minor Arterial Casino Road at 5th Ave.W.Road Intersection Improvements Casino Road at Hardeson Road $500,000 EVERETT 30
<br /> 31 Minor Arterial 4th Avenue West Widening and Improvement 104th Street to 112th St.SW $9,000,000 SNO.CNTY. 31
<br /> 32 Minor Arterial 100th Street SE Improvements SR 527 to 7th Avenue SE $1,000,000 EVERETT 32
<br /> 33 Minor Arterial 100th Street SE Improvements 7th Avenue SE to Evergreen Way $1,000,000 EVERETT 33
<br /> 34 Minor Arterial 110th Street SE Improvements SR 527 to 35th Street SE $2,000,000 EVERETT 34
<br /> 35 Minor Arterial Lenora St./BNSF Rail Line Overcrossing Lenora St.&Lowell Sno.River Rd. $1,800,000 EVERETT 35
<br /> 36 Minor Arterial Minor Arterial Expansions and Streetscaping Various Locations $400,000 EVERETT
<br /> 37 Collector Arterial East Everett Ave./BNSF Overcrossing East Grand Ave.to Railway Ave. $7,000,000 EVERETT 36
<br /> 38 Collector Arterial Bond Street Ped/Bike Improvements Kromer to Terminal Ave. $100,000 EVERETT 37
<br /> 39 Collector Arterial Silver Lake Road-121st St.SE Ped.Improv. 112th Street to SR 527 $1,600,000 EVERETT 38
<br /> 40 Collector Arterial 37th Street improvements and traffic signal Rucker Avenue to Wetmore Ave. $500,000 EVERETT 39
<br /> 41 Collector Arterial Collector Arterial Streetscape Improvements Various Locations $400,000 EVERETT
<br /> $347,850,000
<br /> Note:Projects in bold type(if any)were not included in the 2022-2027 Six-Year TIP
<br /> 2
<br />
|