CITY OF EVERETT SPECIAL PROVISIONS <br /> The lump sum bid for surveying includes, but is not limited to, all costs associated with <br /> furnishing all labor, tools, survey instruments, materials, and other equipment necessary for <br /> the setting and monitoring the location, elevation, alignment and grade of the Work as <br /> specified in 1-05.4 CONFORMITY WITH AND DEVIATIONS FROM PLANS AND STAKES <br /> and the Plans. <br /> The lump sum bid item also includes, but is not limited to, all costs associated with <br /> furnishing all labor, tools, survey instruments, materials and other equipment necessary for <br /> verifying the rim and invert elevations, prior to construction, of all existing manholes and <br /> pipes where connections are to be made. <br /> The lump sum also includes, but is not limited to, all costs associated with furnishing all <br /> labor, tools, survey instruments, materials and other equipment necessary for obtaining the <br /> "as constructed" location and elevations of the Work, in particular, sewer pipe invert <br /> elevations and other information necessary for production of the Record Drawing (As- <br /> Constructed) documents meeting the requirements defined in RECORD DRAWINGS of <br /> these Special Provisions. <br /> Bid Item 5 - Traffic Control Labor <br /> Measurement and Payment: Unit Price per Hour (HR) <br /> This unit price bid item includes all costs associated with traffic control labor as identified in <br /> 1-10.3 FLAGGING, SIGNS, AND ALL OTHER TRAFFIC CONTROL DEVICES of these <br /> Special Provisions. <br /> Furnish all personnel for flagging to control traffic, including pedestrians, during <br /> construction operations in accordance with Section 1-10 of the Standard Specifications (as <br /> amended by the Special Provisions), the Plans, approved traffic control plans, these <br /> Special Provisions and as directed by the City. <br /> Bid Item 6 - Maintenance and Protection of Traffic Control <br /> Measurement and Payment: Lump Sum (LS) <br /> Measurement for Maintenance and Protection of Traffic Control shall be the ratio of the <br /> number of working days completed to the total number of working days authorized in the <br /> Contract. <br /> This lump sum bid item includes the maintenance and protection of traffic control materials, <br /> tools, and equipment necessary to accomplish the Work in accordance with 1-10.3(2) <br /> TRAFFIC CONTROL PROCEDURES, including yet not limited to, signs, barricades, cones, <br /> flashers, reader boards, and temporary pavement markings. Also included is cost <br /> associated with preparation and distribution of public notices involving parking, street <br /> access or traffic issues. <br /> Bid Item 7 - Trench Excavation Safety Systems <br /> Measurement and Payment: Lump Sum (LS) <br /> Measurement for trench excavation safety systems shall be the ratio of pipe installed and <br /> backfilled to the total quantity of pipe listed on the Proposal. <br /> The lump sum bid item includes the costs directly allocated to the safety system for <br /> trenches and all other excavations including, but not limited to, shoring, benching, bracing, <br /> excavation, sheeting, and trench box. This Work shall be accomplished in accordance with <br /> Divisions 1, 2, 7, and 8 of the Standard Specifications and these Special Provisions. <br /> Payment per lump sum includes all equipment, materials, labor, installation, and removal, <br /> and all other work required to meet the trench excavation and safety system requirements. <br /> Bid Item 8 - Erosion/Water Pollution Control <br /> Shore Avenue Force Main Division B—BID DESCRIPTIONS February 24,2022 <br /> WO No.—UP3734 SP- 16 <br />