CITY OF EVERETT SPECIAL PROVISIONS
<br /> The lump sum bid for surveying includes, but is not limited to, all costs associated with
<br /> furnishing all labor, tools, survey instruments, materials, and other equipment necessary for
<br /> the setting and monitoring the location, elevation, alignment and grade of the Work as
<br /> specified in 1-05.4 CONFORMITY WITH AND DEVIATIONS FROM PLANS AND STAKES
<br /> and the Plans.
<br /> The lump sum bid item also includes, but is not limited to, all costs associated with
<br /> furnishing all labor, tools, survey instruments, materials and other equipment necessary for
<br /> verifying the rim and invert elevations, prior to construction, of all existing manholes and
<br /> pipes where connections are to be made.
<br /> The lump sum also includes, but is not limited to, all costs associated with furnishing all
<br /> labor, tools, survey instruments, materials and other equipment necessary for obtaining the
<br /> "as constructed" location and elevations of the Work, in particular, sewer pipe invert
<br /> elevations and other information necessary for production of the Record Drawing (As-
<br /> Constructed) documents meeting the requirements defined in RECORD DRAWINGS of
<br /> these Special Provisions.
<br /> Bid Item 5 - Traffic Control Labor
<br /> Measurement and Payment: Unit Price per Hour (HR)
<br /> This unit price bid item includes all costs associated with traffic control labor as identified in
<br /> 1-10.3 FLAGGING, SIGNS, AND ALL OTHER TRAFFIC CONTROL DEVICES of these
<br /> Special Provisions.
<br /> Furnish all personnel for flagging to control traffic, including pedestrians, during
<br /> construction operations in accordance with Section 1-10 of the Standard Specifications (as
<br /> amended by the Special Provisions), the Plans, approved traffic control plans, these
<br /> Special Provisions and as directed by the City.
<br /> Bid Item 6 - Maintenance and Protection of Traffic Control
<br /> Measurement and Payment: Lump Sum (LS)
<br /> Measurement for Maintenance and Protection of Traffic Control shall be the ratio of the
<br /> number of working days completed to the total number of working days authorized in the
<br /> Contract.
<br /> This lump sum bid item includes the maintenance and protection of traffic control materials,
<br /> tools, and equipment necessary to accomplish the Work in accordance with 1-10.3(2)
<br /> TRAFFIC CONTROL PROCEDURES, including yet not limited to, signs, barricades, cones,
<br /> flashers, reader boards, and temporary pavement markings. Also included is cost
<br /> associated with preparation and distribution of public notices involving parking, street
<br /> access or traffic issues.
<br /> Bid Item 7 - Trench Excavation Safety Systems
<br /> Measurement and Payment: Lump Sum (LS)
<br /> Measurement for trench excavation safety systems shall be the ratio of pipe installed and
<br /> backfilled to the total quantity of pipe listed on the Proposal.
<br /> The lump sum bid item includes the costs directly allocated to the safety system for
<br /> trenches and all other excavations including, but not limited to, shoring, benching, bracing,
<br /> excavation, sheeting, and trench box. This Work shall be accomplished in accordance with
<br /> Divisions 1, 2, 7, and 8 of the Standard Specifications and these Special Provisions.
<br /> Payment per lump sum includes all equipment, materials, labor, installation, and removal,
<br /> and all other work required to meet the trench excavation and safety system requirements.
<br /> Bid Item 8 - Erosion/Water Pollution Control
<br /> Shore Avenue Force Main Division B—BID DESCRIPTIONS February 24,2022
<br /> WO No.—UP3734 SP- 16