My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Redtail LLC 6/24/2022
>
Contracts
>
Capital Contract
>
Redtail LLC 6/24/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2023 10:48:54 AM
Creation date
7/8/2022 11:00:48 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Redtail LLC
Approval Date
6/24/2022
Council Approval Date
5/25/2022
Department
Public Works
Department Project Manager
Candice Au-Yeung
Subject / Project Title
Shore Avenue Force Main
Tracking Number
0003403
Total Compensation
$855,032.99
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Redtail LLC 4/27/2023 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Redtail LLC 5/25/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
508
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> Measurement and Payment: Force Account (FA) <br /> This Force Account bid item shall be accomplished in accordance with 1-09.6 FORCE <br /> ACCOUNT; except, as modified below. <br /> Erosion/Water Pollution Control, Force Account, shall constitute full compensation for all <br /> labor, materials, tools and equipment necessary and incidental for the installation, <br /> maintenance and removal of the temporary erosion and sedimentation control (TESC) <br /> facilities to prevent pollution, erosion, siltation, and damage to any wetland, stream, other <br /> watercourse, or surrounding property throughout the life of the Contract. TESC facilities <br /> shall include, but not be limited to, any cover measures, runoff control measures, soil and <br /> site stabilization measures, silt fencing as shown on the Plans, and inlet protection <br /> measures for the work area and downstream areas. <br /> The TESC measures shall limit the erosion possibility by covering disturbed soils, <br /> preventing sloughing or raveling of cut and natural slopes, and controlling surface runoff <br /> from flowing into excavations using measures such as curbs, berms, dikes, rock-lined <br /> ditches, and other approved measures. Filter fabric fence shall be used to treat small <br /> areas of non-concentrated runoff prior to discharge from the site. <br /> Bid Item 9 - Street Cleaning and Sweeping <br /> Measurement and Payment: Unit Price per Hour (HR) <br /> The unit price per hour for Street Cleaning & Sweeping shall be full compensation for all <br /> labor, tools, incidentals, and equipment necessary to provide the street sweeping, cleaning, <br /> and dust control water required for this project. <br /> Measurement for street sweeping and cleaning will be by the hour for the actual time <br /> consumed in pavement sweeping, cleaning and debris removal. No allowance will be <br /> made for time consumed in making repairs to the equipment or for moving the equipment to <br /> or from the site on which the street cleaning is ordered. No separate payment will be made <br /> for water required for dust control and the normal operation of the pickup sweepers. <br /> Bid Item 10 - Saw-Cutting Asphalt Concrete Pavement, Final Joint Cut, Up To 5-Inch <br /> Thickness <br /> Measurement and Payment: Unit Price per Linear Foot (LF) <br /> Measurement for saw-cutting will be per linear foot along the true length of the surface cut. <br /> The unit price per lineal foot for the final saw-cutting of asphalt concrete pavement, up to 5- <br /> inch thickness, shall be full compensation for all labor, material, tools, and equipment <br /> necessary to satisfactorily complete the Work as specified in Section 2-02.3(3) of the <br /> Standard Specifications, these Special Provisions and as shown on the Plans. The unit <br /> price per lineal foot for the final saw-cutting of asphalt concrete pavement, up to 5-inch <br /> thickness includes, but is not limited to, the saw-cutting necessary for the final joint <br /> between existing pavement and permanent HMA pavement. <br /> Include cost of cleanup by vacuum collection and disposal of the cuttings slurry with this bid <br /> item as there will be no separate payment for cleanup. <br /> Bid Item 11 - HDPE Pipe for Force Main, 6-Inch Diam. <br /> Measurement and Payment: Unit Price per Linear Foot (LF) <br /> Per linear foot pipe measurement shall be based on the slope distance from point to point. <br /> The point of beginning or ending of measurement in any particular run of pipe shall be the <br /> vertical intersection of the centerline of the pipe measured with the centerline of the <br /> intersection pipe, or with the beginning or ending of any new linear length of valves or <br /> couplings contained within the measured length. At changes in pipe size connected by a <br /> reducer, the point of measurement shall be taken as the midpoint of the reducer. <br /> Shore Avenue Force Main Division B—BID DESCRIPTIONS February 24, 2022 <br /> WO No.—UP3734 SP-17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.