Laserfiche WebLink
BREAK <br />!f <br />SHEARING ON PLA7E AS <br />ALL PER adlNT0 <br />it <br />DIAPHRAGM NAILING <br />SHURWALL EDGE FI y <br />(MERE <br />M JOIST PER SCHEDULE (AT <br />NAJL EACH JOIST <br />SDVo7x4)-6' SCREW <br />LTP4 FROM BOTTOM PLA7E TO <br />JOIST PER PLAN (I —JOIST <br />(WEREAPPLICABLE) SHOW, SWO SAM SIMILAR) <br />\_lA,67 RIM JOIST (MINIMUM) <br />(WERE SPECIF11"ED) (2)16d NAILS EACH JOIST <br />- TO TOP PLA7E <br />m <br />FROST DEPTH <br />(" I) <br />IN <br />4" 0 PERFORATED PLAsnc Poo J <br />c <br />LAYMS OF IT OR I � •. Y <br />i <br />Rkl�FIELD VERIFY' <br />SHEARWALL EDGE <br />(WHEIRE APPLICABLE) <br />SHEARWALL <br />(MERE SPECIFIED) <br />FLOM FRAMING PER PLAN (I —JOIST <br />SHOWN, SOLID SAWN SIMILAR) <br />IAV RIM JOIST (MINIMUM) <br />FROM BLOCKING TO TOP PLATE <br />POST PER <br />PLAN/SCHEDULE <br />(-MIN) <br />POST PER <br />PLAN/SCHEDULE <br />2-x I) <br />HOLDOWN PER <br />PLAN! H <br />HOLDOWN PER PLAN <br />FOUNDATION PER <br />PLAN. <br />HOLDOWN INSTALLATION INTO EXISTING FOUNDATION <br />s�q <br />�J <br />Q <br />mo� Daft 13Y <br />,�.: <br />.. <br />s <br />1 <br />STRUCTURAL <br />DETAILS <br />