Laserfiche WebLink
JOIST. <br />; 3x BOTTOM <br />PLATE IS REVO, USE SOSY4x4Jfi <br />LTP4 PER SHEARWALL SCHEDULE <br />SHEARWAUL EDGE NAILING TO SILL <br />PLAIE <br />SHEARWALL EDGE NAIUNG TO SILL <br />PLATE <br />a <br />I <br />3 FOUNDATION_XT. WALL / <br />VERIF.Y ) <br />(FIELD <br />CLEAR SPAPd1 <br />NO NAILS <br />REQUIRE � <br />'FLOOR FRAMIN <br />t <br />DOUBLELAN <br />S <br />OR PER PLAN <br />FLOOR TO FLOOR STRAP <br />BEAM PER P <br />POST PER r <br />LIA <br />�DD <br />BLOCKING- Off / () <br />NAILS <br />0 <br />PS �> <br />_. <br />o <br />�JOIST <br />cn <br />PER tl yq� (I —JOIST SHOW) <br />c� <br />1 - a/c <br />EACH WAY () #4 BARS 0 T � <br />CS®AILTMNATE <br />HOOK ENRECMONa <br />o <br />( 2 ) <br />p� <br />—1 —" <br />JOISTS PARALLEL <br />PER PLAN ALL PER PLAN <br />PER PLAN NAIL SHEATHING <br />INTO EA MEMBER OF <br />TOP PLATE <br />TYP. POST TO BEAM CONN. <br />MEMAKIKE <br />am Daft By psmm <br />V <br />ol <br />00 <br />}tn <br />Data 6-28-M <br />95 <br />ISTRUCTURAL <br />I DETAILS <br />