Laserfiche WebLink
STEP 3. COMPLETE MINIMUM REQUIREMENTS #1-5 <br /> The following subsections address MR #1-5. The more information provided in these subsections typically <br /> corresponds to faster review and permit issuance times. Submitted checklists that lack the necessary <br /> information for review are considered incomplete and will be returned unprocessed to the applicant. <br /> MR #1: Preparation of Stormwater Site Plan <br /> The purpose of MR#1 is to convey all relevant information about the proposed project to the City for review <br /> to ensure the project is in compliance with the current City and State stormwater management standards. <br /> This is your opportunity to inform the reviewer about the project fundamentals as well as highlight the <br /> significant and insignificant aspects of the project with regards to stormwater management. <br /> Task 1: Describe existing site conditions <br /> Provide description of existing site conditions: <br /> The 0.14 ac site is developed and is vegetated with typical brush areas with some 3rd <br /> growth trees Lawn and landscape. The site has moderate slopes (3 to 5 %)within the <br /> development area of the site that slopes from the west to the east. The property drains <br /> Describe existing structures(location,type): <br /> No existing structures. <br /> Describe slopes on your site(flat,rolling,steep,%): <br /> The site has moderate slopes (3 to 5 %) within the development area of the site that <br /> slopes from the west to the east. <br /> Describe hard surfaces(roof,ground treatment): <br /> The elements required for Permanent Stormwater Control are provided on sheet titled <br /> Drainage and Grading Plan for Pavel Svetlechni. Specific design elements on the <br /> drainage plan include BMP T5.10B roof downspout dispersal. <br /> Describe vegetative surfaces(location,quanity ft2): <br /> The majority of the site has native grass (4,400 sf) the remaining area of the is covered <br /> by landscape trees and shrubs. <br /> City of Everett Public Works <br /> Small Project Stormwater Site Plan Report-Dec 2019 4 <br />