Laserfiche WebLink
MR #2 Construction Stormwater Pollution Prevention <br /> (SWPPP) <br /> All new development and redevelopment projects are responsible for preventing erosion and discharge of <br /> sediment and other pollutants into receiving waters. A Construction Stormwater Pollution Prevention Plan <br /> (Construction SWPPP) is designed to be a stand-alone document that addresses construction stormwater <br /> management concerns.A copy of this SWPPP is required to be kept by the contractor performing the work at <br /> the jobsite for reference and updated during the duration of construction. <br /> Task 1: Describe the project during construction <br /> (You may attach a narrative that answers the following questions) <br /> Nature and purpose of the construction project: <br /> Construction of a new single-family residence with attached garage and access <br /> driveway. <br /> Adjacent areas,including streams,lakes,wetlands,residential areas,and roads that might be <br /> affected by the construction project: <br /> No impacts are anticipated to adjacent areas, including streams, lakes, wetlands, <br /> residential areas, and roads. <br /> How upstream drainage areas may affect the site: <br /> The site has no upstream drainage onto the property as the land slopes away from the <br /> property. The area has a single-family residence with lawn and landscaping vegetation. <br /> No impacts are anticipated from the offsite sheet flow. <br /> Downstream drainage leading from the site to a receiving body of water: <br /> On-Site Stormwater runoff sheet flows to the existing curb and gutter along Beverly <br /> BLVD flowing north along the east boundary of the site. At approximately 36 ft north of <br /> the northeast property corner of the site an existing catch basin collects runoff and <br /> directs flow to the citv's storm drain system flowina north alona Beverly BLVD. No <br /> Critical areas that receive runoff from the site up to one-quarter mile away: <br /> No Critical areas will receive runoff from the site. <br /> Special requirements and provisions for working near or within critical areas: <br /> City of Everett Public Works <br /> Small Project Stormwater Site Plan Report-Dec 2019 7 <br />