Laserfiche WebLink
Task 3: Attach Project Specific Stormwater Site Plan (required) <br /> { See City of Everett standard drawings#100-104 for stormwater site plan requirements and <br /> examples,including a Temporary Erosion&Sediment Control (TESC)plan example and <br /> drainage plan example,available online at: <br /> everettwa.gov/1531/Design-Construction-Standards <br /> Task 4: Attach Topographic Survey(required for some projects) <br /> A topographic survey prepared by a registered land surveyor,civil engineer or other <br /> qualified professional is required if your project site includes steep slopes,critical areas, <br /> flood or geologic hazards or at the discretion of the stormwater reviewer. <br /> Task 5: Attach Declaration of Covenant and Grant of Easement <br /> • %` To ensure future maintenance and allow access for inspection,any On-Site Stormwater <br /> BMP(MR#5)constructed as part of the project must have a Declaration of Covenant and <br /> Grant of Easement. Fill out and attach the Declaration of Covenant and Grant of Easement. <br /> For a copy,visit everettwa.gov/1985/Stormwater-Technical-Resources <br /> City of Everett Public Works <br /> Small Project Stormwater Site Plan Report-Dec 2019 6 <br />