My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7018 BEVERLY BLVD 2022-07-20
>
Address Records
>
BEVERLY BLVD
>
7018
>
7018 BEVERLY BLVD 2022-07-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2022 2:31:31 PM
Creation date
7/20/2022 10:50:47 AM
Metadata
Fields
Template:
Address Document
Street Name
BEVERLY BLVD
Street Number
7018
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Structural <br /> ZVELT ENGINEERING DESIGN, PLLC (ZED) Review <br /> Structural Engineering <br /> Letter <br /> Item #3: <br /> Sheet S4 includes elevations for a portal frame. The design does not appear to use this frame. <br /> Correspondence from the FOR appears to indicate that the frame is used at the garage, but the revised <br /> Sheet S4 (sent electronically) appears to indicate the frame has been eliminated. If the frame is used, <br /> it appears modifications to Sheet SO, including changes to the supporting concrete foundations, are <br /> required based on the EOR's response. See IBC Sections 107.2.1 and 1603.1. <br /> ZED Answer: Sheet S4 has been revised and the design includes portal frame at the garage location. <br /> No raised stem walls are required left and right shear walls at the garage. <br /> Item#4: <br /> Detail 12/S3 appears to include a shear wall to beam connection that conflicts with the portal framing <br /> nailing on Sheet S4. Specifically, the nail spacing in Detail 12 is larger, and does not comply with the <br /> requirements for portal frames in the IRC, IBC, and APA Report TT-100F. Please clarify the intended <br /> use of this detail. <br /> ZED Answer: Detail 12/S3 refers to a header extended over left and right panels of shear walls to meet <br /> the aspect ratio criteria at the Pantry corner location on the main floor. Nail spacing was revised to <br /> comply with the shear wall nailing requirements at this location. <br /> Zvelt Engineering Design, PLLC reviewed the comments listed on the city's review letter. <br /> Thank you for this review. <br /> Sincerely, <br /> Zvelt Engineering Design, PLLC <br /> Gabriela Siia, P.E. <br /> �ZELA s, <br /> 'Q) � vASy1 <br /> , r <br /> 52184 <br /> ���FJ,c,J�I 4 .V >, 0 <br /> NAL <br /> EXPIRES: 07-07-22 <br /> Attachments: Structural S-sheets, upper and main shear wall mark-ups, seismic vertical effect-forces mark-ups. <br /> 6619132"d Ave NE,#126 Page 2 /1 zvelt.eng@outlook.com <br /> Kirkland, WA 98033 < 425-242-8042 <br />
The URL can be used to link to this page
Your browser does not support the video tag.