My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7018 BEVERLY BLVD 2022-07-20
>
Address Records
>
BEVERLY BLVD
>
7018
>
7018 BEVERLY BLVD 2022-07-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2022 2:31:31 PM
Creation date
7/20/2022 10:50:47 AM
Metadata
Fields
Template:
Address Document
Street Name
BEVERLY BLVD
Street Number
7018
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Structural <br /> ZVELT ENGINEERING DESIGN, PLLC (ZED) Review <br /> Structural Engineering <br /> Letter <br /> D <br /> Mr. Drew Martin ©!Ell /c ;:rTs\ <br /> City of Everett Permit Services ` <br /> cr <br /> 3200 Cedar Street, 2nd Floor / {a;. <br /> Everett, WA 98201 on <br /> Ci n l <br /> September 18, 2020 �1 rvicesi <br /> e <br /> ZED Project: 20-108 <br /> Subject: Revision for Svetleachni Residence located at the address 7018 Beverly Blvd, Everett, <br /> WA 98203. <br /> City of Everett— B2007-007 <br /> Dear Mr. Martin: <br /> The purpose of this letter is to respond to the City of Everett review of September 18, 2020. <br /> Item numbers below correspond to the items listed on the City's Review Letter. <br /> Structural <br /> Item #1: <br /> Shear Wall Note 2 on Sheet S2 stated that post-installed anchors may be used in lieu of CIP AB. This <br /> will require additional analysis per ACI 318-14 Section 17.2.3.5.3. Alternatively, the post installed <br /> connections should be removed. Note that the cast-in-place anchors should comply with amendments <br /> to ACI Section 17.2.3.5.2 per IBC Section 1905.1.8 unless they are designed as indicated above. <br /> ZED Answer: Sheet S2 was revised and post-installed anchors will not be recommended. <br /> Item #2: <br /> The shear wall design appears to use the segmented wall procedure of APA SDPWS-15 Section <br /> 4.3.5.1. Holdowns are required at the ends of multiple second story walls and are connected to <br /> beams. Beams, framing supporting the beams (e.g., posts), and the connections including at the <br /> foundation, are required to be design including overstrength on the seismic component and vertical <br /> seismic effects. See ASCE 7-10 Sections 12.3.3.3, 12.4.2.2, and 12.4.3.2. Per correspondence with <br /> the engineer-of-record, loading information was provided to the AOR. However, the gravity beams do <br /> not appear to include the required seismic loads. In addition, the information provided by the FOR <br /> does not appear to include vertical reactions along the north elevation. Calculations substantiating the <br /> design of the gravity framing supporting discontinuous walls should be revised. <br /> ZED Answer: The shear wall design was based on the segmented wall procedure. Holdowns have <br /> been provided where required following the calculations for each wall segment on the upper and main <br /> floors. Please find attached sheets A6 and A8, pages 18 and 19 on the calculation package. The <br /> locations and values of the forces from the seismic component and vertical effect on the beams below <br /> including the omega overstrength factor and the load combinations have been provided to the AOR to <br /> be considered in the gravity section. <br /> Attachments: Structural S-sheets, upper and main shear wall mark-ups,seismic vertical effect-forces mark-ups. <br /> 6619132nd Ave NE,#126 Page 1 2' ; zvelt.eng@outlook.com <br /> Kirkland, WA 98033 425-242-8042 <br />
The URL can be used to link to this page
Your browser does not support the video tag.