Laserfiche WebLink
4 1 <br /> Stormwater Pollution Prevention Plan General Introduction <br /> 1.0 Introduction <br /> This Stormwater Pollution Prevention Plan(SWPPP)has been prepared using guidelines set <br /> forth in the National Pollutant Discharge Elimination System(NPDES) stormwater permit. <br /> However,a NPDES general stormwater permit is not required for this project as the disturbed <br /> area will be less than an acre in size. The proposed Grandview Apartments Clubhouse project <br /> located at approximate1y857 Locust Street,Everett, Washington 98201 within Section 17, <br /> Township 29 North,Range 5 East, WM. The project site is currently zoned as R-4,Multi-Family <br /> High Residential. The tax parcel number associated with this project is 00459200100000. <br /> The Everett Housing Authority is proposing a new clubhouse with parking for the Grandview <br /> Apartment complex. Construction of this project shall disturb approximately 0.42 acres of the <br /> 10.15-acre parcel. The project area is bordered on all sides by multi-family residences. The <br /> proposed clubhouse parking lot will be accessible via Locust Street. There are no critical areas in <br /> the immediate vicinity of the project site. <br /> The purpose of this SWPPP is to describe the proposed construction activities and all temporary <br /> and permanent erosion and sediment control(TESC)measures,pollution prevention measures, <br /> inspection/monitoring activities, and recordkeeping that will be implemented during the <br /> proposed construction projects. The objectives of the SWPPP are to: <br /> 1. Implement Best Management Practices (BMPs)to prevent erosion and sedimentation, <br /> and to identify,reduce,eliminate or prevent stormwater contamination and water <br /> pollution from construction activity. <br /> 2. Prevent violations of surface water quality, ground water quality, or sediment <br /> management standards. <br /> 3. Prevent,during the construction phase, adverse water quality impacts including impacts <br /> on beneficial uses of the receiving water by controlling peak flow rates and volumes of <br /> stormwater runoff at the Permittee's outfalls and downstream of the outfalls. <br /> This SWPPP was prepared using the Ecology SWPPP Template downloaded from the Ecology <br /> website. It is based on the requirements set forth in the Construction Stormwater General Permit <br /> and the Stormwater Management Manual for Western Washington(SWMMWW 2005). The <br /> report is divided into seven main sections with several appendices that include stormwater <br /> related reference materials. The topics presented in the each of the main sections are: <br /> • Section 1 —INTRODUCTION. This section provides a summary description <br /> of the project and the organization of the SWPPP document. One general <br /> introduction is used for the entire project. All subsequent sections are <br /> included in each part defined previously. <br /> Grandview Apartments Clubhouse <br /> SWPPP 1 March,2017 <br />