Laserfiche WebLink
? 1 <br /> Stormwater Pollution Prevention Plan General Introduction <br /> • Section 2—SITE DESCRIPTION. This section provides a detailed <br /> description of the existing site conditions,proposed construction activities, <br /> and calculated stormwater flow rates for existing conditions and post— <br /> construction conditions. <br /> • Section 3—CONSTRUCTION BMPs. This section provides a detailed <br /> description of the BMPs to be implemented based on the 12 required <br /> elements of the SWPPP. <br /> • Section 4—CONSTRUCTION PHASING AND BMP <br /> IMPLEMENTATION. This section provides a description of the timing of <br /> the BMP implementation in relation to the project schedule. <br /> • Section 5—POLLUTION PREVENTION TEAM. This section identifies the <br /> appropriate contact names(emergency and non-emergency),monitoring <br /> personnel, and the onsite temporary erosion and sedimentation control <br /> inspector. <br /> • Section 6—INSPECTION AND MONITORING. This section provides a <br /> description of the inspection and monitoring requirements such as the <br /> parameters of concern to be monitored, sample locations, sample frequencies, <br /> and sampling methods for all stormwater discharge locations from the site. <br /> • Section 7—RECORDKEEPING. This section describes the requirements for <br /> documentation of the BMP implementation, site inspections,monitoring <br /> results, and changes to the implementation of certain BMPs due to site <br /> factors experienced during construction. <br /> Supporting documentation and standard forms are provided in the following Appendices: <br /> Appendix A—Vicinity Map, Soil Map, TESC Drawings <br /> Appendix B—Construction BMPs <br /> Appendix C—Alternative Construction BMP list <br /> Appendix D—DOE General Permit <br /> Appendix E—Site Log and Inspection Forms <br /> Grandview Apartments Clubhouse <br /> SWPPP 2 March,2017 <br />