Laserfiche WebLink
� Q <br /> 0 <br /> Element#1—Mark Clearing Limits <br /> To protect adjacent properties and to reduce the area of soil exposed to construction,the limits of <br /> construction will be clearly marked before land-disturbing activities begin. Clearing limits will <br /> be delineated by silt fence and flagging. The following relevant BMPs for this project include: <br /> BMP C 103: High Visibility Plastic or Metal Fence <br /> BMP C233: Silt Fence <br /> Element#2—Establish Construction Access <br /> Construction access or activities occurring on unpaved areas shall be minimized,yet where <br /> necessary, access points shall be stabilized to minimize the tracking of sediment onto public <br /> roads, and wheel washing, street sweeping, and street cleaning shall be employed to prevent <br /> sediment from entering state waters. The following relevant BMPs for this project include: <br /> BMP C 105: Stabilized Construction Entrance/Exit <br /> Element#3—Control Flow Rates <br /> In order to protect the properties and waterways downstream of the project site, stormwater <br /> discharges from the site will be controlled. This project is anticipated to commence and be <br /> completed during the dry season and therefore no BMP's for flow rate control are needed. <br /> Element#4—Install Sediment Controls <br /> All stormwater runoff from disturbed areas shall pass through an appropriate sediment removal <br /> BMP before entering a receiving water body. The following relevant BMPs for this project <br /> include: <br /> BMP C220: Storm Drain Inlet Protection <br /> BMP C233: Silt Fence <br /> Element#5—Stabilize Soils <br /> Exposed and unworked soils shall be stabilized with the application of effective BMPs to prevent <br /> erosion throughout the life of the project. The following relevant BMPs for this project include: <br /> BMP C120: Temporary and Permanent Seeding <br /> BMP C121: Mulching <br /> BMP C123: Plastic Covering <br /> BMP C140: Dust Control <br /> In general, cut and fill slopes will be stabilized as soon as possible.If a soil stockpile is <br /> necessary, it will be temporarily covered with plastic sheeting. Soil stockpiles shall be stabilized <br /> from erosion and located away from storm drain inlets,waterways, and drainage channels. The <br /> DAVID EVANS AND ASSOCIATES,INC. <br /> GRANDVIEW APARTMENTS CLUBHOUSE MARCH,2017 <br /> STORMWATER SITE PLAN PAGE 12 <br />