Laserfiche WebLink
Describe drainage flow paths (direction,location): <br /> Lot drainage flows north to street area from highest point in center of lot. <br /> Are there Critical Areas?What are they and where are they located relative to your project?: <br /> There is a critical area located within 300' but not on the lot itself. It is located to the <br /> Southeast corner of the lot. <br /> __._......._.... <br /> Task 2: Describe proposed project <br /> Describe your proposed project: <br /> New Single family home to be developed. <br /> How will your project change the existing condition?: <br /> It will add a total of 4140 sq ft of total hard surface on the lot or about 21% of total lot <br /> coverage. <br /> Describe roofs,patios,driveways,or structures added: <br /> There will be a driveway accessed from W. Mukilteo Blvd to a parking area in front of <br /> the house. Leading to a new Single family home that has 2060 sq ft of hard roof area. <br /> Hard surface area includes driveway, side patio and rear deck. <br /> How will stormwater be managed?: <br /> Will use onsite storm water management. <br /> Describe how the project will affect existing drainage systems onsite or on adjacent properties <br /> or both: <br /> Project will disperse flow onsite and any overflow will run to existing city storm water at <br /> street of mukilteo blvd on north end of lot. <br /> City of Everett Public Works <br /> Small Project Storm water Site Plan Report-Dec 2019 5 <br />