Laserfiche WebLink
STEP 3. DETERMINE FLOW CONTROL REQUIREMENT <br /> Does this project create greater than 200 square feet of net new impervious area (item E from <br /> table above)? <br /> X Yes No <br /> If yes, then the project is not exempt and flow control is required. Complete entire <br /> checklist. <br /> If no, then the project is exempt from the flow control requirement. Skip the rest of <br /> Step 3 and complete STEPS 4 and 5 of this spreadsheet. <br /> Determination of `fee in-lieu of flow control' eligibility: <br /> Is the project in the eligible sub-basin of the combined sewer area as depicted in Figure 6-10.I <br /> of the City of Everett Design and Construction Standards and Specifications? <br /> X Yes No <br /> If no, then the fee option is not available for your project. Skip the fee calculation <br /> below and complete the rest of the checklist. <br /> If yes, will this project choose to take the fee option instead of designing and installing a <br /> flow control facility? <br /> Yes X No <br /> If yes, then calculate fee using the table below and complete Steps 4 and 5 of this <br /> checklist (Step 6 not required). <br /> If no, skip the fee calculation below and complete the rest of the checklist. <br /> Table for calculation of fee in-lieu-of flow control <br /> I. Enter total net new impervious (Item <br /> D from table above) <br /> 2. Subtract 200 sf <br /> 3. Fee per sf $3.72/SF <br /> Calculate Total Fee by multiplying item #2 by <br /> item #3 <br /> City of Everett Public Works <br /> Small Project Stormwater Site Plan Report for Projects in 5 <br /> the Combined Sewer Area-April 2021 <br />