Laserfiche WebLink
STEP 4. COMPLETE MINIMUM REQUIREMENTS <br /> The more information provided in these subsections typically corresponds to faster review and permit <br /> issuance times. Submitted checklists that lack the necessary information for review are considered <br /> incomplete and will be returned unprocessed to the applicant. <br /> Preparation of Stormwater Site Plan <br /> The purpose of this task is to conveyall relevant information aboutthe proposed project to the Cityfor review <br /> to ensure the project is in compliance with the current City and State stormwater management standards. <br /> This is your opportunity to inform the reviewer about the project fundamentals as well as highlight the <br /> significant and insignificant aspects of the project with regards to stormwater management. <br /> Task 1: Describe existing site conditions <br /> Provide description of existing site conditions: <br /> Level backyard that opens directly to alleyway with vegetation and garden space <br /> Describe existing structures (location,type): <br /> 720 sqft SFH located —70' from rear lot line <br /> Describe slopes on your site (flat, rolling, steep, %): <br /> flat <br /> Describe hard surfaces (roof, ground treatment): <br /> Roof over existing house, slab from previously demolished garage abutting rear <br /> lot line <br /> Describe vegetative surfaces (location, quantity ft2): <br /> Front lawn of approx. 4000 sqft including rain gardens of approx. 1000 sqft on N, <br /> S, and W sides of existing structure. Garden and unmaintained non-native <br /> vegetation comprise another approx. 2700 sqft of the back yard. <br /> City of Everett Public Works <br /> Small Project Stormwater Site Plan Report for Projects in 6 <br /> the Combined Sewer Area-April 2021 <br />