My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1507 RUCKER AVE B 2022-07-21
>
Address Records
>
RUCKER AVE
>
1507
>
1507 RUCKER AVE B 2022-07-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2022 8:18:24 AM
Creation date
7/21/2022 8:17:31 AM
Metadata
Fields
Template:
Address Document
Street Name
RUCKER AVE
Street Number
1507
Unit
B
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Describe drainage flow paths (direction, location): <br /> Currently the drainage flows into rain gardens around the main structure. All <br /> other flows move from west to east towards the rear lot line abutting the <br /> alleyway <br /> Are there Critical Areas?What are they and where are they located relative to your project? <br /> (Check with the Planning Division at plannine@everettwa.gov if you are unsure if the property is in <br /> close proximity to a Critical Area.): <br /> None exist near my project <br /> Task 2: Describe proposed project <br /> Describe your proposed project: <br /> The project will consist of construction and attachment of a modular 340 sqft <br /> detached accessory dwelling unit, an adjacent concrete parking pad, and rebuild <br /> of previously demolished garage <br /> How will your project change the existing condition?: <br /> The project will add approx. 700 sqft of impervious surface <br /> Describe roofs, patios, driveways, or structures added: <br /> The roofs of the DADU will be low slope asphalt shingles with a 6" & 18" <br /> overhang around the back/sides and front respectively. The entry deck will be <br /> covered with no additional overhang. The garage will have a higher slope with <br /> 12" overhannm_ The narkinn n n will he annrnx_ 1/10 snft of level cnncrete p <br /> How will stormwater be managed in the final condition?: <br /> Stormwater will be drained into downspout dispersion trenches <br /> Describe how the project will affect existing drainage systems onsite or on adjacent properties <br /> or both: <br /> The project will add an additional approx. 700 sqft of drainage directly into the <br /> sewer that previously was not existing. All the drainage flow from the proposed <br /> project will be managed on-site through downspout dispersion. <br /> City of Everett Public Works <br /> Small Project Stormwater Site Plan Report for Projects in 7 <br /> the Combined Sewer Area-April 2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.