Laserfiche WebLink
Describe drainage flow paths (direction, location): <br /> Currently the drainage flows into rain gardens around the main structure. All <br /> other flows move from west to east towards the rear lot line abutting the <br /> alleyway <br /> Are there Critical Areas?What are they and where are they located relative to your project? <br /> (Check with the Planning Division at plannine@everettwa.gov if you are unsure if the property is in <br /> close proximity to a Critical Area.): <br /> None exist near my project <br /> Task 2: Describe proposed project <br /> Describe your proposed project: <br /> The project will consist of construction and attachment of a modular 340 sqft <br /> detached accessory dwelling unit, an adjacent concrete parking pad, and rebuild <br /> of previously demolished garage <br /> How will your project change the existing condition?: <br /> The project will add approx. 700 sqft of impervious surface <br /> Describe roofs, patios, driveways, or structures added: <br /> The roofs of the DADU will be low slope asphalt shingles with a 6" & 18" <br /> overhang around the back/sides and front respectively. The entry deck will be <br /> covered with no additional overhang. The garage will have a higher slope with <br /> 12" overhannm_ The narkinn n n will he annrnx_ 1/10 snft of level cnncrete p <br /> How will stormwater be managed in the final condition?: <br /> Stormwater will be drained into downspout dispersion trenches <br /> Describe how the project will affect existing drainage systems onsite or on adjacent properties <br /> or both: <br /> The project will add an additional approx. 700 sqft of drainage directly into the <br /> sewer that previously was not existing. All the drainage flow from the proposed <br /> project will be managed on-site through downspout dispersion. <br /> City of Everett Public Works <br /> Small Project Stormwater Site Plan Report for Projects in 7 <br /> the Combined Sewer Area-April 2021 <br />