My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1507 RUCKER AVE B 2022-07-21
>
Address Records
>
RUCKER AVE
>
1507
>
1507 RUCKER AVE B 2022-07-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2022 8:18:24 AM
Creation date
7/21/2022 8:17:31 AM
Metadata
Fields
Template:
Address Document
Street Name
RUCKER AVE
Street Number
1507
Unit
B
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Step 5. Construction Stormwater Pollution Prevention <br /> (SWPPP) <br /> All new development and redevelopment projects are responsible for preventing erosion and discharge of <br /> sediment and other pollutants into receiving waters.A Construction Stormwater Pollution Prevention Plan <br /> (Construction SWPPP) is designed to be a stand-alone document that addresses construction stormwater <br /> management concerns.A copy of this SWPPP is required to be kept by the contractor performing the work at <br /> the jobsite for reference and updating during the duration of construction. <br /> Task 1: Describe the project during construction <br /> (You may attach a narrative that answers the following questions) <br /> Nature and purpose of the construction project: <br /> The project will consist of construction and attachment of a modular 340 sqft <br /> detached accessory dwelling unit, an adjacent concrete parking pad, and rebuild <br /> of previously demolished garage <br /> Adjacent areas,including streams,lakes,wetlands,residential areas,and roads that might be <br /> affected by the construction project: <br /> An adjacent alleyway abutting the rear property line, neighboring properties, <br /> 15th St between Rucker Ave and Hoyt Ave <br /> How upstream drainage areas may affect the site: <br /> The neighboring residences drainage may runoff into the site if not effectively <br /> drained <br /> Downstream drainage leading from the site to a receiving body of water: <br /> None leads directly to a receiving body of water. The alleyway at 15th St has a <br /> storm drain that will have inlet protection installed during construction. <br /> Critical areas that receive runoff from the site up to one-quarter mile away: <br /> None exist near my project <br /> Special requirements and provisions for working near or within critical areas: <br /> Not applicable to my project <br /> City of Everett Public Works <br /> Small Project Stormwater Site Plan Report for Projects in 9 <br /> the Combined Sewer Area-April 2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.