My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1507 RUCKER AVE B 2022-07-21
>
Address Records
>
RUCKER AVE
>
1507
>
1507 RUCKER AVE B 2022-07-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2022 8:18:24 AM
Creation date
7/21/2022 8:17:31 AM
Metadata
Fields
Template:
Address Document
Street Name
RUCKER AVE
Street Number
1507
Unit
B
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Areas on the site that have potential erosion problems: <br /> The northwestern corner of the property <br /> Locations where surface water leaves the site: <br /> Rear lot line abutting alleyway <br /> Task 2: Select Construction Best Management Practices (BMPs) to be used on your project <br /> All new development and redevelopment projects are responsible for preventing erosion and sedimentation <br /> during construction.Each of the 13 requirements below contains a list of Best Management Practices(BMPs) <br /> that are accepted by the Washington State Department of Ecology(Ecology)for satisfying each requirement. <br /> The BMPs below are the most common.For a complete selection of BMPs please see Volume II of Ecology's <br /> Stormwater Management Manual for Western Washington. <br /> 0 Each of the 13 Elements below must be considered in the SWPPP. Select all <br /> BMPs that you will be using to satisfy each requirement.All requirements must <br /> have at least one item selected. <br /> Element 1. Preserve vegetation/mark clearing limits: <br /> ❑ BMP C 101:Preserving Natural Vegetation <br /> ❑ BMP C 102:Buffer Zones <br /> Ill BMP C 103:High Visibility Plastic or Metal Fence <br /> ❑ Other Perthe SWMMWW: <br /> El Not applicable to my proposed project <br /> Explain: <br /> Element 2. Establish construction: <br /> IN BMP C 105:Stabilized Construction Entrance/Exit <br /> ❑ BMP C 106:Wheel Wash <br /> ❑ BMP C 107:Construction Road/Parking Area Stabilization <br /> ❑ OtherPerthe S OI NVW <br /> ❑ Not applicable to my proposed project <br /> Explain: <br /> City of Everett Public Works <br /> Small Project Stormwater Site Plan Report for Projects in 10 <br /> the Combined Sewer Area-April 2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.