Laserfiche WebLink
A <br />MECHANICAL GENERAL OTES,- <br />VENTILATIGN (HVAC) <br />1. <br />THESE DRAWINGS ARE GENERALLY DIAGRAMMATIC AND ARE INTENDED TO CONVEY THE SCOPE OF WORK AS WELL AS INDICATE GENERAL ARRANGEMENT OF <br />EQUIPMENT, DUCTWORK AND PIPING. THE CONTRACTOR SHALL ADHERE TO THESE DRAWINGS AS CLOSELY AS POSSIBLE. HOWEVER, THE RIGHT IS RESERVED <br />y <br />AIR FLOW ARROW <br />TO VARY THE RUNS OF DUCTWORK AND PIPING AND TO MAKE OFFSETS, WHERE NECESSARY, TO ACCOMMODATE CONDITIONS ARISING AT THE JOBSITE, THE <br />I�--� <br />CONTRACTOR SHALL PREPARE SHOP DRAWINGS TO BE SUBMITTED TO THE ENGINEER FOR APPROVAL. NO WORK SHALL BE PERFORMED PRIOR TO RECEIPT OF <br />18"x12" 18"x12"�? <br />RECTANGULAR DUCT AND SIZE* <br />EQUIPMENT, DUCTWORK AND PIPING FABRICATION DRAWING APPROVAL. <br />18"� <br />ROUND DUCT AND SIZE* <br />2. <br />ANY MATERIAL, WORK OR INCIDENTAL ACCESSORIES OR MINOR DETAILS NOT SHOWN BUT NECESSARY TO MAKE THE WORK COMPLETE IN ALL RESPECTS AND <br />READY FOR OPERATION, EVEN IF NOT PARTICULARLY SHOWN ON THE DRAWINGS, SHALL BE PROVIDED BY THE CONTRACTOR WITHOUT ADDITIONAL EXPENSE TO <br />FLAT OVAL DUCT AND SIZE* <br />THE OWNER. <br />18"x12" <br />EXTERIOR DUCT TREATMENT* <br />3. <br />CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS BY FIELD INSPECTION AND MEASUREMENTS AT THE JOBSITE, ANY DISCREPANCIES, OMISSIONS, <br />DEVIATIONS AND/OR CONFLICTS SHALL BE REPORTED TO THE ENGINEER PRIOR TO PURCHASE, FABRICATION OR ERECTION OF WORK. <br />18°'x12" 18"x12" <br />RECTANGULAR DUCT WITH ACOUSTIC LINING* <br />4. <br />DUCT SIZES SHOWN ON DRAWINGS ARE CLEAR INSIDE DIMENSIONS, WHERE ACOUSTICALLY LINED DUCT IS SPECIFIED. DUCT DIMENSIONS SHALL BE INCREASED <br />30"x12" <br />DUCT SECTION, SUPPLY AIR. SIZE* IS HORIZONTAL DIM. x VERTICAL DIM. <br />TO ACCOMMODATE LINING. <br />APPLIES TO RECT., ROUND AND OVAL <br />DUCT SECTION, OUTSIDE AIR. APPLIES TO RECT., ROUND AND OVAL <br />5. <br />WHERE WORK IS INDICATED TO BE BY OTHER CONTRACTORS, FOR EXAMPLE: "BY OTHERS", THIS WORK IS NOT IN THE HVAC/MECHANICAL CONTRACT. HOWEVER, <br />THE MECHANICAL CONTRACTORS EACH CONTRACTOR WILL BE RESPONSIBLE FOR CLOSE COORDINATION WITH OTHER CONTRACTORS WORK. <br />-' <br />DUCT SECTION, RETURN AIR. APPLIES TO RECT., ROUND AND OVAL <br />6. <br />REFER TO APPROPRIATE SPECIFICATION SECTION FOR EQUIPMENT SELECTION PARAMETERS WHERE DRAWINGS DO NOT CONTAIN EQUIPMENT SCHEDULES. <br />DUCT SECTION, EXHAUST AIR. APPLIES TO RECT., ROUND AND OVAL <br />7. <br />ALL LOW PRESSURE TERMINAL BRANCH DUCTWORK (SUPPLY AND RETURN) SHALL BE PROVIDED WITH VOLUME CONTROL DAMPERS. ALL BRANCH DUCT VOLUME <br />I I I Pl/ 0 <br />FLEXIBLE DUCT <br />DAMPERS SERVING DIFFUSERS IN GYPSUM BOARD CEILINGS (OTHERWISE INACCESSIBLE) SHALL BE REMOTELY (CORD OR CABLE) OPERABLE THROUGH THE <br />FACE OF THE DIFFUSER, AIR BALNCER SHALL REVIEW THE DRAWINGS PRIOR TO BALANCE AND REQUEST ANY ADDITIONAL BALANCING DAMPERS (AT NO COST TO <br />x <br />ELBOW TURN, SUPPLY DOWN. APPLIES TO RECT., ROUND AND OVAL <br />THE OWNER). <br />8. <br />THERMOSTAT LOCATIONS SHALL BE COORDINATED WITH THE ARCHITECTURAL DRAWINGS. FINISHED PAINT COLOR TO BE SELECTED BY THE ARCHITECT. <br />x <br />ELBOW TURN, OUTSIDE AIR DOWN. APPLIES TO RECT., ROUND AND OVAL <br />MANUFACTURER'S LOGO SHALL NOT BE EXPOSED. CONTRACTOR RESPONSIBLE FOR COORDINATING RIGHT/LEFT WAND CONTROL AND REHEAT COIL SIDES FOR <br />ELBOW T URN, RETURN DOWN. APPLIES TO RECT., ROUND AND OVAL <br />FPVAV BOXES PRIOR TO RELEASE. <br />9. <br />AC UNITS SHOWN ON DRAWINGS ARE SCHEMATIC. SEE AC UNIT DETAIL ON DETAIL SHEET FOR ACTUAL TYPICAL ARRANGEMENT REQUIRED. <br />ELBOW TURN, EXHAUST DOWN, APPLIES TO RECT., ROUND AND OVAL <br />10, <br />WHERE PIPING CONNECTIONS FOR EQUIPMENT SUCH AS PUMPS, AC UNITS, COIL, ETC. DIFFER FROM THE LINE SIZE PIPING. IT SHALL BE THE RESPONSIBILITY OF <br />9UP I <br />CHANGE IN DUCT ELEVATION RISING IN DIRECTION INDICATED <br />THE MECHANICAL CONTRACTOR TO FURNISH AND INSTALL THE NECESSARY REDUCER/EXPANDER FITTINGS TO ENABLE CONNECTION BETWEEN THE PIPING <br />SYSTEM AND THE EQUIPMENT. <br />DNI <br />CHANGE IN DUCT ELEVATION DROPPING IN DIRECTION INDICATED <br />11. <br />ALL DUCTWORK AND PIPING REQUIRING FIRE RATING AND WHERE SHOWN ON PLANS SHALL PROVIDED WITH A 2-HOUR FIRE RATED ENCLOSURE (PROVIDED <br />UNDER ANOTHER SECTION OF THE SPECIFICATIONS). <br />END CAP <br />12. <br />BORDER TYPES, COLOR, AND METHOD OF ATTACHMENT FOR ALL DIFFUSERS, GRILLES AND REGISTERS SHALL BE COORDINATED WITH THE ARCHITECTURAL <br />ELBOW, RECTANGULAR, SMOOTH RADIUS WITH SPLUTTER VANES <br />CEILING DETAILS AND SPECIFICATIONS. <br />(0.25 R/W DEFAULT) <br />13. <br />PROVIDE ALL REQUIRED PIPE TAPPING FOR WATER TREATMENT SYSTEMS. <br />ELBOW, RECTANGULAR, SMOOTH RADIUS WITHOUT VANES (1.5 R/W <br />DEFAULT) <br />14. <br />PROVIDE CABLE OPERATED DAMPER FOR ALL SUPPLY AND RETURN DIFFUSERS IN INACCESSIBLE CEILING TYPES. ADJUSTMENT OF VOLUME DAMPERS SHALL BE <br />ELBOW, ROUND, SMOOTH RADIUS (1.5 R/W DEFAULT) <br />THROUGH THE DIFFUSER FACE. <br />15, <br />ALL FULL HEIGHT PARTITIONS (I.E. TO UNDERSIDE OF SLAB ABOVE), EXCEPT WHERE THE INTEGRITY OF SOUND PROOFING IS REQUIRED, SHALL BE PROVIDED <br />�� <br />MITERED ELBOW, RECTANGULAR, WITH TURNING VANES <br />WITH A NO LINE OF SIGHT TRANSFER OPENING IN WALL ABOVE CEILING. MECHANICAL CONTRACTOR TO COORDINATE THIS REQUIREMENT WITH THE GENERAL <br />RECTANGULAR. TO ROUND TRANSITION <br />CONTRACTOR. TRANSFER OPENINGS SHALL BE TWO (2) SQUARE FEET OR AS INDICATED ON THE PLANS. WHERE THE NO LINE OF SIGHT TRANSFER OPENING <br />AD <br />PENETRATES A FIRE-RESISTANT RATED WALL, A FIRE OR COMBINATION FIRE/SMOKE DAMPER SHALL BE INSTALLED. <br />AD � SAD <br />DUCT ACCESS DOOR (TOP, SIDE, BOTTOM) <br />16. <br />WHERE OVERHEAD MECHANICAL PIPING CANNOT BE ROUTED AROUND ELECTRICAL EQUIPMENT, ALL MECHANICAL PIPING RUNNING ABOVE ELECTRICAL <br />EQUIPMENT SHALL BE ROUTED MINIMUM 6 FT ABOVE AND PROVIDED WITH DRAIN PAN UNDERNEATH. PIPING FROM DRAIN PAN SHALL BE PROVIDED BY PLUMBING <br />FLEXIBLE CONNECTION <br />CONTRACTOR AND EXTEND TO NEAREST FLOOR DRAIN OR I.W. <br />FC <br />" NOTE: ALL DUCT SIZES ARE INTERIOR, FREE DIMENSIONS (ALWAYS <br />17. <br />PROVIDE TESTING AND BALANCING FOR ALL EXISTING AND NEW AIR DISTRIBUTION SYSTEM. CLEAN ALL EXISTING DUCTWORK AT DISCONNECTION/CONNECTION <br />WIDTH X HEIGHT IN FLOOR PLAN AND SECTION) <br />POINTS BEFORE CONNECTING TO NEW DUCTWORK. <br />18. <br />MAINTAIN INTEGRITY AND OPERATION OF THE BUILDING LIFE SAFETY SYSTEM. <br />BACKDRAFT DAMPER <br />19. <br />ALL SHOP DRAWINGS AND MATERIALS SHALL BE REVIEWED BY THE ENGINEER OF RECORD AND A COPY SHALL BE PROVIDED TO LANDLORD'S ENGINEER. <br />BDD <br />MANUAL DAMPER <br />CONTRACTOR SHALL SUPPLE CURRENT MARKUP SET OF AS BUILT PLANS INCLUDING RFI'S AND MODIFICATIONS BASED ON SUBMITTALS OR COORDINATION WITH <br />OTHER TRADES. <br />M <br />MOTORIZED DAMPER <br />20. <br />COORDINATE LOCATION OF ALL TERMINALS AND ASSOCIATED DUCTWORK TO ALLOW FOR ACCESS TO ALL FOR PREVENTIVE MAINTENANCE AND REPAIRS. <br />FIRE DAMPER <br />21. <br />PROVIDE DUCTWORK AND/OR PIPING ELBOWS AS NECESSARY TO MEET THE REQUIRED CEILING HEIGHTS. <br />SMOKE DAMPER <br />22. <br />WHERE MECHANICAL EQUIPMENT IS LOCATED ABOVE AN INACCESSIBLE CEILING, AN ACCESS DOOR SHALL BE INSTALLED. COORDINATE WITH THE ARCHITECT <br />SMOKE AND FIRE DAMPER <br />FOR EXACT LOCATION AND FINISH, MECHANICAL EQUIPMENT SHALL BE LOCATED WITHIN T-6" OF THE FINISHED CEILING TO PROVIDE ACCESS, OTHERWISE <br />MEANS (A PERMANENT LADDER) MAY BE REQUIRED TO ACCESS EQUIPMENT ABOVE THE CEILING. <br />DUCT SILENCER <br />23. <br />FOR THOSE ELEMENTS THAT DO NOT REQUIRE DETAILS ON THE APPROVED DRAWINGS, THE INSTALLATION SHALL BE SUBJECT TO THE APPROVAL OF THE <br />CONTROL DEVICE (REFER TO CONTROLS LEGEND) <br />MECHANICAL ENGINEER AND THE FIELD REPRESENTATIVE OF THE AOC. <br />AIR FLOW MEASURING STATION (REFER TO CONTROLS LEGEND) <br />24. <br />COPIES OF THE MANUAL SHALL BE ON THE JOB SITE PRIOR TO STARTING HANGING AND BRACING OF THE PIPE AND DUCTWORK SYSTEMS. THE STRUCTURAL <br />ENGINEER OF RECORD SHALL VERIFY THE ADEQUACY OF THE STRUCTURE TO SUPPORT THE HANGER AND BRACE LOADS, <br />QUANTITY <br />TYPE <br />SIZE (IN.) <br />AIR OUTLET OR INLET TAG (REFER TO SCHEDULE) <br />MECHANICAL DEMOLITION ® <br />VOLUME (CFM) <br />1. <br />THIS CONTRACTOR SHALL VISIT THE SITE AND ADJOINING AREAS AND EXAMINE THE EXISTING CONDITIONS TO BECOME FAMILIAR WITH THEM AND TO DETERMINE <br />THE DIFFICULTIES WHICH WILL AFFECT THE EXECUTION OF THE WORK OF THIS CONTRACT. THIS CONTRACTOR SHALL PERFORM THIS PRIOR TO THE SUBMISSION <br />ti <br />RECTANGULAR DIFFUSER, SUPPLY. OPTIONAL ARROWS SHOW THE <br />OF HIS PROPOSAL. SUBMISSION OF A PROPOSAL WILL BE: CONSTRUED AS EVIDENCE THAT SUCH AN EXAMINATION HAS BEEN MADE AND LATER CLAIMS WILL NOT <br />FLOW DIRECTION. <br />BE RECOGNIZED FOR EXTRA LABOR, EQUIPMENT OR MATERIALS REQUIRED BECAUSE OF DIFFICULTIES ENCOUNTERED WHICH COULD HAVE BEEN FORESEEN HAD <br />RECTANGULAR REGISTER OR GRILLE, RETURN <br />SUCH AN EXAMINATION BEEN MADE. <br />z <br />RECTANGULAR REGISTER OR GRILLE, EXHAUST <br />2. <br />DEMOLITION NOTES, SYMBOL LIST AND DETAILS ARE APPLICABLE TO ALL HVAC/MECHANICAL DRAWINGS. <br />ROUND DIFFUSER, SUPPLY <br />3. <br />THE CONTRACTOR SHALL INCLUDE IN HIS PRICE ALL COSTS ASSOCIATED WITH REMOVALS AND RELOCATIONS OF HVAC WORK AS DESCRIBED ON THE DRAWINGS <br />AND IN THE SPECIFICATIONS WITH ALLOWANCES FOR EXPECTED OR UNFORESEEN DIFFICULTIES WHEN CONCEALED WORK HAS BEEN OPENED. NO CLAIMS FOR <br />LINEAR DIFFUSER <br />ADDITIONAL WORK ASSOCIATED WITH DEMOLITION WILL BE ACCEPTED, EXCEPT IN CERTAIN CASES CONSIDERED JUSTIFIABLE BY THE OWNER/ENGINEER. <br />4. <br />THE CONTRACTOR SHALL PERFORM DEMOLITION AND REMOVAL WORK WITH MINIMUM INTERFERENCE WITH FUNCTIONING HVAC SYSTEMS. ALL AFFECTED <br />SIDEWALL REGISTER OR GRILLE, SUPPLY <br />SYSTEMS SHALL BE RECONNECTED AND RESTORED. <br />SIDEWALL GRILLE, RETURN OR EXHAUST <br />5. <br />DEMOLITION AND REMOVAL WORK SHALL BE PERFORMED IN A NEAT AND WORKMANLIKE MANNER. THE CONTRACTOR SHALL PATCH, REPAIR OR OTHERWISE <br />UNDERCUT DOOR <br />RESTORE ANY DAMAGED INTERIOR OR EXTERIOR BUILDING SURFACE TO ITS ORIGINAL CONDITION. <br />UC <br />6. <br />THE CONTRACTOR SHALL REMOVE ALL DUCT & PIPING SUPPORTS, ETC, FROM PARTITIONS THAT ARE TO BE REMOVED, WHERE THE REMOVAL OF THESE ITEMS <br />DOOR GRILLE OR LOUVER <br />DISRUPTS EXISTING PIPING THAT IS TO REMAIN, THE CONTRACTOR SHALL INSTALL AND PROVIDE BYPASS CONNECTIONS NECESSARY. <br />TRANSFER GRILLE OR LOUVER <br />7. <br />PORTIONS OF PIPING & DUCTWORK TO BE REMOVED OR ABANDONED AS A RESULT OF DEMOLITION WORK, BUT WHICH ARE REQUIRED TO REMAIN ACTIVE, SHALL <br />BE CUT AT CONVENIENT LOCATIONS, REROUTED AND RECONNECTED, <br />COIL (REFER TO CONTROLS LEGEND) <br />8. <br />THE CONTRACTOR SHALL NOTIFY THE OWNER AT THE APPROPRIATE TIME OF THE PROJECTED DEMOLITION AND PHASING SCHEDULE SO THAT REMOVAL OR <br />RELOCATION OF AFFECTED UTILITIES MAY BE CARRIED OUT IN COORDINATION WITH THE PROJECT REQUIREMENTS, <br />ID # <br />EQUIPMENT TAG <br />9. <br />ALL EXISTING MATERIAL AND EQUIPMENT IN USABLE CONDITION, WHICH IS TO BE REMOVED UNDER THIS CONTRACT, SHALL REMAIN THE PROPERTY OF THE <br />/ -� QUANTITY <br />OWNER OR SHALL BE DISPOSED OF BY THE HVAC CONTRACTOR, AS DIRECTED BY THE OWNER. <br />- TYPE <br />- LENGTH (FT) <br />RADIATION HEATING TAG (REFER TO SCHEDULE) <br />10. <br />ARRANGE TO WORK CONTINUOUSLY, INCLUDING OVER TIME, IF REQUIRED, TO ASSURE THAT SYSTEMS WILL BE SHUT DOWN ONLY DURING THE TIME ACTUALLY <br />REQUIRED TO MAKE THE NECESSARY CONNECTIONS TO THE EXISTING SYSTEMS. <br />CAPACITY (MBH) <br />11. <br />THE SHUTDOWN OF EXISTING BUILDING HVAC SERVICES SHALL BE COORDINATED WITH WITH THE OWNER. MAKE ARRANGEMENTS AT LEAST 5 BUSINESS DAYS <br />PRIOR TO A SHUTDOWN. <br />12. <br />EQUIPMENT REQUIRED TO BE TURNED OVER TO THE OWNER SHALL BE PLACED IN A MUTUALLY ACCEPTABLE LOCATION, ALL MATERIALS AND EQUIPMENT <br />REMOVED AS A RESULT OF DEMOLITION SHALL BE TAKEN FROM THE SITE AND DISPOSED OF IN ACCORDANCE WITH APPLICABLE LAWS AND ENVIRONMENTAL <br />REGULATIONS. <br />13. AFTER DEMOLITION, CONTRACTOR SHALL REPLACE REMOVED AND REPAIR DAMAGED FIREPROOFING TO MEET BUILDING FIRE RESISTANCE RATING <br />CLASSIFICATION. <br />14. ALL EXISTING BUILDING FIRE DAMPERS, FIRE/SMOKE DAMPERS, DUCT MOUNTED SMOKE DETECTORS AT SUPPLY AND RETURN AIR SHAFTS AND MECHANICAL <br />ROOM WALL PENETRATIONS TO REMAIN. <br />COMCAST- EVERETT <br />1525 75TH STREET SOUTHWEST <br />EVERETT, WASHINGTON 98204 <br />SEISMIC DESIGN CATEGORY: D <br />SCOPE OF WORK <br />THIS PROJECT INCLUDES THE DEMOLITION AND CUTBACK OF EXISTING <br />DUCTWORK AND NEW DUCTWORK, DUCT ACCESSORIES, AIR OUTLETS AND <br />FPVAV BOXES AS REQUIRED TO SUPPORT THE NEW PROGRAM LAYOUT. <br />THERMOSTATS TO BE PROVIDED NEW FOR NEW EQUIPMENT AND EXISTING <br />THERMOSTATS TO BE RELOCATED AS INDICATED ON PLANS. EXISTING HVAC <br />EQUIPMENT TO REMAIN AND BE RE -USED. REPLACEMENT OF RTU-5 WITH <br />INCREASED CAPACITY ROOFTOP UNIT, DX COOLING, AND NATURAL GAS FIRED <br />HEATER. <br />ASHRAE OUTDOOR DESIGN CONDITIONS: <br />SUMMER COOLING: <br />86 F / 65.7 WB <br />WINTER COOLING: <br />23.9 F <br />OFFICE <br />WINTER TEMP. <br />MAINTAIN .A MIN OF 70 DEGREES F <br />SUMMER TEMP. <br />MAINTAIN A MAX OF 75 DEGREES F <br />FRESH AIR <br />5 CFM/PERSON AND 0.06 CFM.SQ, FT (ASHRAE 62.1 TABLE 6-1) <br />RELATIVE HUMIDITY <br />65% RH MAX PER ASHRAE 55, NO MIN, HUMIDITY CONTROL <br />SENSOR(S) <br />TEMPERATURE CONNECTED TO HVAC <br />CONFERENCE ROOM <br />WINTER TEMP, <br />MAINTAIN A MIN OF 70 DEGREES F <br />SUMMER TEMP. <br />MAINTAIN A MAX OF 75 DEGREES F <br />FRESH AIR <br />5 CFM/PERSON AND 0.06 CFM.SQ, FT (ASHRAE 62.1 TABLE 6-1) <br />RELATIVE HUMIDITY <br />65% RH MAX PER ASHRAE 55, NO MIN. HUMIDITY CONTROL <br />SENSOR(S) <br />TEMPERATURE CONNECTED TO HVAC <br />Y <br />4 ✓ <br />M+ <br />+I <br />4 <br />v, <br />f <br />4 <br />4 <br />=a <br />A/C AIR CONDITIONING UNIT <br />AAV AUTOMATIC AIR VENT <br />ADA AMERICANS WITH DISABILITIES ACT <br />ADJ ADJUSTABLE <br />AFC ABOVE FINISHED CEILING <br />AFF ABOVE FINISHED FLOOR <br />AFG ABOVE FINISHED GRADE <br />AP ACCESS PANEL <br />ARID AIR PRESSURE DROP <br />AVG AVERGAGE <br />SAS BUILDING AUTOMATION SYSTEM <br />BDD SACKDRAFT DAMPER <br />BHP BRAKE HORSEPOWER <br />BMS BUILDING MANAGEMENT SYSTEM <br />BOD BOTTOM OF DUCT <br />BOP BOTTOM OF PIPE <br />BTU BRITISH THERMAL UNIT <br />BTUH BRITISH THERMAL UNIT PER HOUR <br />C/W COMPLETE WITH <br />CAV CONSTANT AIR VOLUME <br />CFM CUBIC FEET PER MINUTE <br />DB DRY BULB TEMEERATURE <br />dB DECIBEL(S) <br />DDC DIRECT DIGITAL CONTROL <br />DEG DEGREE <br />DIAJO DIAMETER <br />DIFF DIFFERENTIAL <br />DIV DIVISION <br />DN DOWN <br />DWG DRAWING <br />EA EXHAUST AIR <br />EA (D) EXHAUST AIR, DISHWASH <br />EA (G) EXHAUST AIR, GENERAL <br />EA (K) EXHAUST AIR, KITCHEN <br />EA (LAB) EXHAUST AIR, LABORATORY <br />EA (LD) EXHAUST AIR, LAUNDRY/DRYER <br />EA (W) EXHAUST AIR, WASHROOM <br />EAT ENTERING AIR TEMPERATURE <br />EAV EXHAUST AIR VALVE <br />ED EXISTING TO BE DEMOLISHED (DEMOLITION PLANS) <br />EER ENERGY EFFICIENCY RATIO <br />EG ETHELYENE GLYCOL <br />ER EXISTING RELOCATED (NEW CONSTRUCTION PLANS) <br />ERL EXISTING TO BE RELOCATED (DEMOLITION PLANS) <br />ESP EXTERNAL STATIC PRESSURE <br />EWT ENTERING WATER TEMPERATURE <br />EXIST / E EXISTING (DEMOLITION PLANS) <br />FLA FULL LOAD AMPERAGE <br />FP FIRE PROTECTION <br />FPM FEET PER MINUTE <br />FPS FEET PER SECOND <br />FT FOOT/FEET <br />GA GAUGE <br />GAL GALLON (US) <br />GC GENERAL CONTRACTOR <br />GPM GALLONS PER MINUTE <br />HERA HIGH EFFICIENCY PARTICULATE AIR (FILTER) <br />HP HORSEPOWER <br />HR HOUR <br />HVAC HEATING / VENTILATING / AIR CONDITIONING <br />HZ HERTZ <br />IE INVERT ELEVATION <br />IN INCHES <br />IN WG INCHES WATER GAUGE <br />PIPING COMPONENTS <br />SYMBOL <br />T <br />y <br />F11111!` 1 S � <br />Stry <br />t <br />h 1 <br />Q rtt <br />r <br />1s t� � <br />"Pik <br />IPLV INTEGRATED PART LOAD <br />kW <br />KILOWATT <br />kWh <br />KILOWATT HOUR <br />LAT <br />LEAVING AIR TEMPERATURE <br />LBS <br />POUNDS <br />LF <br />LINEAR FEET <br />DAIT <br />LEAVING WATER TEMPERATURE <br />M <br />METER <br />MAX <br />MAXIMUM <br />MSH <br />THOUSAND OF STUH <br />MCA <br />MINIMUM CIRCUIT AMPS <br />MFR <br />MANUFACTURER <br />MIN <br />MINIMUM <br />MOP <br />MAXIMUM OVERCURRENT PROTECTION <br />N/A <br />NOT APPLICABLE <br />NO <br />NOISE CRITERIA <br />NC <br />NORMALLY CLOSED <br />NIC <br />NOT IN CONTRACT <br />NO <br />NORMALLY OPEN <br />NPS <br />NOMINAL PIPE SIZE <br />NTS <br />NOT TO SCALE <br />OA <br />OUTSIDE AIR <br />OFCI <br />OWNER FURNISHED, CONTRACTOR INSTALLED <br />OFE <br />OWNER FURNISHED EQUIPMENT <br />OFOI <br />OWNER FURNISHED / OWNER INSTALLED <br />PG <br />PROPYLENE GLYCOL <br />POE <br />POINT OF ENTRANCE <br />POS <br />POINT OF SERVICE <br />RPM <br />PARTS PER MILLION <br />PSI <br />POUNDS PER SQUARE INCH <br />PSIA <br />POUNDS PER SQUARE INCH, ABSOLUTE <br />PSIG <br />POUNDS PER SQUARE INCH, GAGE <br />PTS <br />PNEUMATIC TUBE STATION <br />PVC <br />POLYVINYL CHLORIDE <br />RA <br />RETURN AIR <br />RELA <br />RELIEF AIR <br />READ <br />REQUIRED <br />RH <br />RELATIVE HUMIDITY <br />RPM <br />REVOLUTIONS PER MINUTE <br />SA <br />SUPPLY AIR <br />SP <br />STATIC PRESSURE <br />SP <br />STAIR PRESSURIZATION AIR (*) <br />SRV <br />SAFETY RELIEF VALVE <br />TA <br />TRANSFER AIR <br />TEMP <br />TEMPERATURE <br />TSP <br />TOTAL STATIC PRESSURE <br />TSTAT <br />THERMOSTAT <br />TYR <br />TYPICAL <br />UC <br />UNDER CUT (DOOR) <br />UG <br />UNDERGROUND <br />UP <br />UP <br />VAV <br />VARIABLE AIR VOLUME <br />VFD <br />VARIABLE FREQUENCY DRIVE <br />VIF <br />VERIFY IN FIELD <br />VTR <br />VENT-THRU-ROOF <br />W/ <br />WITH <br />W/0 <br />WITHOUT <br />WB <br />WET BULB TEMPERATURE <br />WG <br />WATER GAUGE <br />WMS <br />WIRE MESH SCREEN <br />ZN-# <br />ZONE <br />°C <br />CELSIUS <br />°F <br />FAHRENHEIT <br />r . . ,, <br />SHEET LIST <br />jimber <br />ILEGENDS00 <br />ISOLATION VALVE (GENERIC) <br />GATE VALVE <br />GLOBE VALVE <br />BALL VALVE <br />PLUG VALVE <br />NEEDLE VALVE <br />CHECK VALVE (GENERIC) <br />BALANCING VALVE <br />FLOW LIMITING VALVE <br />PRESSURE REDUCING VALVE <br />SAFETY OR RELIEF VALVE <br />MECHANICAL SPECIFICATIONS <br />MECHANICAL SPECIFICATIONS <br />MECHANICAL SPECIFICATIONS <br />MECHANICAL ENERGY CODE <br />COMPLIANCE <br />GAS SPECIFICATIONS <br />LEVEL 1 HVAC PLAN A <br />LEVEL 1 HVAC PLAN B <br />ROOF HVAC PLAN A <br />ROOF PIPING PLAN A <br />ROOF PIPING PLAN B <br />GAS PIPING RISER DIAGRAM <br />MECHANICAL SHEDULES <br />MECHANICAL DETAILS <br />LEVEL 1 HVAC DEMOLITION PLAN A <br />LEVEL 1 HVAC DEMOLITION PLAN B <br />ROOF HVAC DEMOLITION PLAN A <br />ROOF HVAC DEMOLITION PLAN B <br />M-002 <br />M-003 <br />M-004 <br />M-005 <br />M-006 <br />M-101A <br />M-101 B <br />M-102A <br />M-202A <br />M-202B <br />M-300 <br />M-600 <br />M-700 <br />MD101A <br />MD101B <br />MD102A <br />MD102B <br />MULTI -PURPOSE VALVE (SHUTOFF, BALANCING AND CHECK) <br />PUMP (GENERIC) <br />Y STRAINER. (GENERIC) <br />AUTOMATIC AIR VENT <br />MANUAL AIR VENT <br />VACUUM BREAKER <br />SHOCK ABSORBER <br />PRESSURE GAUGE <br />TEMPERATURE AND PRESSURE TAP <br />GUIDE <br />ANCHOR <br />FLOW ARROW <br />PIPE CAP <br />PIPE BREAK <br />PIPE CROSS <br />PIPING ELBOW UP <br />PIPING ELBOW DOWN <br />PIPING TEE UP <br />PIPING TEE DOWN <br />UNION CONNECTION <br />STANDARD CLEAN -OUT IN LINE END OF RUN <br />APPLICABLE <br />t� <br />CODES <br />lY a i <br />h S <br />� s <br />E a 4 4 <br />1 1 <br />4� <br />AB-# <br />AIR BLENDER <br />AC-# <br />AIR COMPRESSOR <br />ACU-# <br />AIR CONDITIONING UNIT <br />ADS-# <br />AIR AND DIRT SEPARATOR <br />AF-# <br />AIR FILTER <br />AHU-# <br />AIR HANDLING UNIT <br />AS-# <br />AIR SEPARATOR <br />ATU-# <br />AIR TERMINAL UNIT <br />B-# <br />BOILER <br />BCU-# <br />BLOWER COIL UNIT <br />BT-# <br />BATH TUB <br />CB-# <br />CHILLED BEAM <br />CC# <br />COOLING COIL <br />CH-# <br />CHILLER <br />CONY# <br />CONVECTOR <br />CRU-# <br />CONDENSATE RETURN UNIT <br />CT-# <br />COOLING TOWER <br />CU-# <br />CONDENSING UNIT <br />CUH# <br />CABINET UNIT HEATER <br />CV-# <br />CONTROL VALVE <br />DAC # <br />DOOR AIR CURTAIN <br />DC-# <br />DUST COLLECTOR <br />DCT-# <br />DECONTAMINATION TANK <br />DF# <br />DRINKING FOUNTAIN <br />DS-# <br />DUCT SILENCER <br />DU-# <br />DEHUMIDIFICATION UNIT <br />DWH# <br />DOMESTIC WATER HEATER <br />E-# <br />EXHAUST GRILLE / REGISTER / DIFFUSER <br />EL-# <br />EXPANSION LOOP <br />ERC# <br />ENERGY RECOVERY COIL <br />ERU-# <br />ENERGY RECOVERY UNIT <br />EWC-# <br />ELECTRIC WATER COOLER <br />EWS# <br />EYE WASH STATION <br />F(C)-# <br />FAN CEILING <br />F(E)# <br />FAN EXHAUST <br />F(LE)-# <br />FAN LABORATORY EXHAUST <br />F(R)-# <br />FAN RETURN <br />F(S)# <br />FAN SUPPLY <br />F(T)# <br />FAN TRANSFER <br />F # <br />FAN <br />FCU# <br />FAN COIL UNIT <br />FD-# <br />FLOOR DRAIN <br />FFU# <br />FAN FILTER UNIT <br />FPP-# <br />FIRE PROTECTION PUMP <br />FPTU# <br />FAN POWERED TERMINAL UNIT <br />FTR-# <br />FINNED TUBE RADIATOR <br />FUR-# <br />FURNACE <br />GFS# <br />GLYCOL FEED SYSTEM <br />GSG-# <br />GAS -FIRED STEAM GENERATOR(*) <br />H(C)-# <br />HOOD (CANOPY) <br />H(HC)-# <br />WOOD (HEAT AND CONDENSATE) <br />H(I)# <br />HOOD (INTAKE) <br />H(K)# <br />HOOD (KITCHEN) <br />H(R)# <br />HOOD (RELIEF) <br />H(RH)-# <br />HOOD (RANGE) <br />H# <br />HUMIDIFIER <br />HC# <br />HEATING COIL <br />HP# <br />HEAT PUMP <br />HRU-# <br />HEAT RECOVERY UNIT <br />HT# <br />HYDROPNEUMATIC TANK <br />HX-# <br />HEAT EXCHANGER <br />LATU-# <br />LAB AIR TERMINAL UNIT <br />LAV# <br />LAVATORY <br />MAC# <br />MEDICAL AIR COMPRESSOR <br />MAU-# <br />MAKEUP AIR UNIT <br />MSK# <br />MOP SINK <br />MV-# <br />MIXING VALVE <br />MVP-# <br />MEDICAL VACUUM PUMP <br />P# <br />PUMP <br />PDU-# <br />POOL DEHUMIDIFICATION UNIT <br />PRV# <br />PRESSURE REDUCING VALVE <br />PTAC-# <br />PACKAGED TERMINAL AIR CONDITIONER <br />R# <br />RETURN AIR GRILLE / REGISTER / DIFFUSER <br />RDA# <br />ROOF DRAIN <br />RP# <br />RADIANT PANEL <br />RTU# <br />ROOFTOP UNIT <br />S-# <br />SUPPLY GRILLE/ REGISTER / DIFFUSER <br />SH# <br />SHOWER <br />SK# <br />SINK <br />SPC# <br />SOLAR PANEL COLLECTOR <br />SSF# <br />SIDE STREAM FILTER <br />T(B)4 <br />TANK (BUFFER TANK) <br />T(E)-# <br />TANK (EXPANSION TANK) <br />T(H)# <br />TANK (HYDRO PNEUMATIC TANK) <br />T(S)4 <br />TANK (STORAGE TANK) <br />T-# <br />TRANSFER AIR GRILLE <br />UH# <br />UNIT HEATER <br />UR# <br />URINAL <br />USG# <br />UNFIRED STEAM GENERATOR <br />UV-# <br />UNIT VENTILATOR <br />VA-# <br />VALVE <br />WC# <br />WATER CLOSET <br />WS-# <br />WATER SOFTENER <br />BELOW ARE THE APPLICABLE MODEL CODES WITH LOCAL AMENDMENTS THAT HAVE BEEN ADOPTED BY THE CITY OF EVERETT, WA. <br />2018 INTERNATIONAL BUILDING CODE (IBC) <br />2018 INTERNATIONAL EXISTING BUILDING CODE (IEBC) <br />2018 INTERNATIONAL MECHANICAL CODE (IMC) <br />2018 INTERNATIONAL FUEL GAS CODE (IFGC) <br />2018 INTERNATIONAL FIRE CODE (IFC) <br />2018 UNIFORM PLUMBING CODE (UPC) <br />2018 WASHING STATE ENERGY CODE (WSEC): WAC 51-11C <br />2018 WASHING STATE ENERGY CODE APPENDIX <br />2018 NATIONAL FUEL GAS CODE (NFPA 54) <br />2020 NATIONAL ELECTRICAL CODE (NFPA 70) <br />WAC 296-46B ELECTRICAL SAFETY STANDARDS, ADMINSTRATION, AND INSTALLATION <br />2018 WASHINGTON STATEWIDE AMENDMENTS <br />CITY OF EVERETT DESIGN AND CONSTRUCTION STANDARDS AND SPECIFICATIONS FOR DEVELOPMENT <br />WASHINGTON STATE DEPT. OF ECOLOGY STORMWATER MANAGEMENT FOR WESTER WASHINGTON (SWMMWW) <br />EVERETT MUNICIPAL CODE (EMC) <br />CONTRACTOR SHALL COMPLY WITH ALL STATE & LOCAL REQUIREMENTS. <br />ADD -ALTERNATE M-1 <br />SEE SHEET M-102A FOR DETAILS <br />ADD ALTERNATE M-2 <br />SEE SHEET M-102A FOR DETAILS <br />ADD -ALTERNATE M03 <br />SEE SHEET IM-003 FOR DETAILS <br />p <br />DEMOLITION <br />EXISTING <br />NEW WORK <br />CTE POINT OF CONNECTION OF NEW TO EXISTING <br />SYSTEM <br />POINT OF DISCONNECTION OF DEMOLITION FROM <br />EXISTING <br />-� CAP OFF EXISTING <br />- DETAIL NUMBER <br />? ? <br />-- DETAIL SALLOUTS <br />SHEET ON WHICH <br />I I <br />DETAIL IS SHOWN <br />- ELEVATION NUMBER <br />7 <br />EXTEROOR ELEVATIONS <br />SHEET ON WHICH <br />ELEVATION IS SHOWN <br />ELEVATION NUMBER <br />7� <br />? ? ? INTEIR0R ELEVATIONS <br />?? <br />SHEET ON WHICH <br />ELEVATION IS SHOWN <br />SECTION NUMBER <br />? ? <br />BUILDING SECTIONS <br />? <br />CUCCT r)N11A1U1r1U <br />MATCH LINE <br />GRAPHIC SCALES - ENGINEERING <br />EL. 10000 <br />ELEVATION <br />+0000 <br />ELEVATION - CEILING <br />(ELEVATION <br />DATUM ELEVATION <br />TOP OF <br />0000 <br />ROOM TAG <br />M01 <br />KEY NOTE TAG <br />SLOPE <br />SLOPE ARROW <br />CIRCULAR BREAK SYMBOL <br />.I` <br />CIRCLE BREAK SYMBOL <br />OREFERENCE <br />SYMBOL- DIAMOND <br />0 <br />REFERENCE SYMBOL - HEXAGON <br />z )C <br />REFERENCE SYMBOL - TRIANGLE <br />DREFERENCE <br />SYMBOL - CIRCLE <br />0 <br />REFERENCE SYMBOL - ROTATED HEXAGON <br />CENTER LINE <br />(D-GRID BUBBLE AND LINE <br />CD <br />F <br />h A; <br />2021-03-05 <br />Title <br />LEGENDS <br />ABBREVAT�ONS <br />NOT ALL SYMBOLS,_IMCI <br />ABBREV�ATIONS MAY BE USED ON THS PROJECT <br />.- _.., MWOOT <br />I <br /><Pick location in Project Information> <br />3/5/2021 7:10:28 PM <br />