MECHANICAL SPECIFICATIONS
<br />PARTI- GENERAL
<br />1.01 GENERAL REQUIREMENTS
<br />A. INSTALL ALL NEW WORK IN A NEAT WORKMANLIKE MANNER READILY ACCESSIBLE FOR OPERATION, MAINTENANCE AND REPAIR.
<br />B. CODES, PERMITS AND INSPECTIONS:
<br />1. ALL WORK SHALL COMPLY WITH REQUIREMENTS OF THE 2015 INTERNATIONAL BUILDING CODE AS AMENDED AND ADOPTED BY WASHINGTON STATE,
<br />BUILDING DEPARTMENT, BUILDING MANAGEMENT, AND ALL AUTHORITIES HAVING JURISDICTION AND APPLICABLE NATIONAL, STATE AND LOCAL CODES, LAWS
<br />AND REGULATIONS GOVERNING OR RELATING TO ANY PORTION OF THIS WORK SHALL BE INCORPORATED INTO AND MADE A PART OF THESE
<br />SPECIFICATIONS. CONTRACTOR IS TO INFORM ENGINEER OF ANY EXISTING WORK OR MATERIALS WHICH VIOLATE ANY OF THE ABOVE LAWS AND
<br />REGULATIONS. ANY WORK DONE BY THE CONTRACTOR CAUSING SUCH VIOLATION SHALL BE CORRECTED AT THE CONTRACTOR'S EXPENSE BY THIS
<br />CONTRACTOR AND AT NO EXPENSE TO THE OWNER.
<br />2. THIS CONTRACTOR SHALL OBTAIN ALL EQUIPMENT APPROVALS AS REQUIRED BY STATE AND LOCAL AUTHORITIES. PERMITS SHALL BE TURNED OVER TO
<br />OWNER AT JOB COMPLETION.
<br />C. SITE VERIFICATION:
<br />1. PRIOR TO SUBMISSION OF THE BID, THIS CONTRACTOR SHALL VISIT THE JOB SITE TO ASCERTAIN THE ACTUAL FIELD CONDITIONS AS THEY RELATE TO THE
<br />WORK INDICATED ON THE DRAWINGS AND DESCRIBED HEREIN. DISCREPANCIES, IF ANY, SHALL BE BROUGHT TO THE ENGINEER=S ATTENTION PRIOR TO
<br />SUBMISSION OF THE BID, AND IF NOT RESOLVED TO SATISFACTION, SHALL BE SUBMITTED AS A WRITTEN QUALIFICATION OF THE BID. SUBMISSION OF A BID
<br />SHALL BE EVIDENCE THAT SITE VERIFICATION HAS BEEN PERFORMED AS DESCRIBED ABOVE.
<br />D. CONTRACT DOCUMENTS:
<br />1. PRIOR TO SUBMISSION OF A FORMAL BID, THIS CONTRACTOR SHALL REVIEW ALL DRAWINGS OF THE ENTIRE PROJECT INCLUDING GENERAL
<br />CONSTRUCTION, DEMOLITION, ARCHITECTURAL, MECHANICAL, ELECTRICAL, PLUMBING AND SPRINKLER AND SHALL INCLUDE ANY WORK REQUIRED IN THE BID
<br />WHICH IS INDICATED OR IMPLIED TO BE PERFORMED BY THIS TRADE IN OTHER SECTIONS OF THE WORK.
<br />2. DRAWINGS ARE DIAGRAMMATIC AND INDICATE GENERAL ARRANGEMENT OF WORK AND APPROXIMATE LOCATION OF EQUIPMENT. REFER TO
<br />ARCHITECTURAL DRAWINGS FOR ALL DIMENSIONS AND COORDINATE FINAL LOCATIONS OF DIFFUSERS, GRILLES, REGISTERS, THERMOSTATS, SENSORS,
<br />SWITCHES AND ANY WALL MOUNTED DEVICES. ALL WORK SHALL BE COORDINATED WITH OTHER TRADES TO AVOID CONFLICT.
<br />3. IF A CONFLICT OCCURS IN THE SPECIFICATIONS AND/OR ON THE DRAWINGS, THE MORE STRINGENT SITUATION SHALL APPLY.
<br />E. GUARANTEE:
<br />1. ALL MATERIALS AND WORKMANSHIP SHALL BE GUARANTEED FOR A PERIOD OF ONE YEAR FROM DATE OF FINAL ACCEPTANCE OF THIS WORK. FINAL
<br />ACCEPTANCE SHALL BE DEFINED AS THE TIME AT WHICH THE MECHANICAL WORK IS TAKEN OVER AND ACCEPTED BY THE OWNER, AND IS UNDER CARE,
<br />CUSTODY, AND CONTROL OF THE OWNER. ENGAGE THE SERVICES OF VARIOUS MANUFACTURERS SUPPLYING THE EQUIPMENT FOR THE PROPER STARTUP
<br />AND OPERATION OF ALL SYSTEMS INSTALLED. INSTRUCT THE OWNER'S PERSONNEL IN THE PROPER OPERATION AND SERVICING OF THE SYSTEM.
<br />2. THE CONTRACTOR SHALL GUARANTEE TO REPLACE OR REPAIR PROMPTLY AND ASSUME RESPONSIBILITY FOR ALL EXPENSES INCURRED FOR ANY
<br />WORKMANSHIP AND EQUIPMENT IN WHICH DEFECTS DEVELOP WITHIN THE GUARANTEE PERIOD, THIS WORK SHALL BE DONE AS DIRECTED BY THE OWNER.
<br />THIS GUARANTEE SHALL INCLUDE RESPONSIBILITY FOR ALL EXPENSES INCURRED IN REPAIRING AND REPLACING WORK OF OTHER TRADES AFFECTED BY
<br />DEFECTS, REPAIRS OR REPLACEMENTS IN EQUIPMENT SUPPLIED BY THIS CONTRACTOR.
<br />3. THIS CONTRACTOR IS RESPONSIBLE FOR THE MAINTENANCE AND OPERATION OF ALL SYSTEMS UNTIL THE FINAL ACCEPTANCE OF THE WORK.
<br />4. ALL AIR CONDITIONING UNIT COMPRESSORS AND REFRIGERATION COMPONENTS SHALL HAVE A 5-YEAR WARRANTY.
<br />F. THE GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION AIA DOCUMENT A201, LATEST EDITION, OR AS REQUIRED BY THE ARCHITECT'S
<br />DOCUMENTS, AND/OR THE STRUCTURAL ENGINEER'S DOCUMENTS, AS APPLICABLE, ARE PART OF THIS CONTRACT,
<br />G.DEFINITIONS:
<br />1. MECHANICAL CONTRACTOR, "THIS CONTRACTOR" - THE PARTY OR PARTIES HAVE BEEN DULY AWARDED THE CONTRACT FOR AND ARE THEREBY MADE
<br />RESPONSIBLE FOR THE MECHANICAL WORK AS DESCRIBED HEREIN.
<br />2. "THIS CONTRACT", "THE CONTRACT" - THE AGREEMENT COVERING THE WORK TO BE PERFORMED BY THIS CONTRACTOR.
<br />3. "APPROVED", "EQUAL", "SATISFACTORY„"ACCEPTED", .ACCEPTED", "ACCEPTABLE", "EQUIVALENT" -SUITABLE FOR USE ON 'T8-IE PROJECT, A5 DETERMINED BY THE.
<br />ENGINEER BASED ON DOCUMENTS PRESENTED FOR SUCH DETERMINATION.
<br />4. "THESE SPECIFICATIONS", "THIS SECTION, PART, DIVISION" (OF THE SPECIFICATION) - THE DOCUMENT SPECIFYING THE WORK TO BE PERFORMED BY "THIS
<br />CONTRACTOR".
<br />5. "THE MECHANICAL WORK" "TEAS WORK" - ALL LABOR MATERIALS, EQUIPMENT, APPARATUS, CONTROLS, ACCESSORIES, AND OTHER ITEMS REQUIRED FOR A
<br />PROPER AND COMPLETE INSTALLATION BY THE MECHANICAL CONTRACTOR.
<br />6. "ARCHITECT', "ENGINEER", "OWNER'S REPRESENTATIVE" - THE PARTY OR PARTIES RESPONSIBLE FOR INTERPRETING, ACCEPTING AND OTHERWISE RULING
<br />ON THE PERFORMANCE UNDER THIS CONTRACT.
<br />7. "FURNISH" PURCHASE AND DELIVER TO THE PROJECT SITE COMPLETE WITH EVERY NECESSARY APPURTENANCE AND SUPPORT, ALL AS PART OF THE
<br />MECHANICAL WORK.
<br />8. "INSTALL" - UNLOAD AT THE DELIVERY POINT AT THE SITE AND PERFORM EVERY OPERATION NECESSARY TO ESTABLISH SECURE MOUNTING INSTALLATION
<br />AND CORRECT OPERATION AT THE PROPER LOCATION IN THE PROJECT, ALL AS PART OF THE MECHANICAL WORK.
<br />9. "PROVIDE" - "FURNISH" AND "INSTALL".
<br />10. "NEW" - MANUFACTURED WITHIN THE PAST TWO YEARS AND NEVER BEFORE USED.
<br />11. "RELOCATE" MOVE EXISTING EQUIPMENT AND ALL ACCESSORIES AS REQUIRED.
<br />12. "REMOVE" - DISMANTLE AND CART AWAY FROM SITE INCLUDING ALL RELATED ACCESSORIES. ALL ITEMS SHALL BE LEGALLY DISPOSED OF. ALL OTHER
<br />EQUIPMENT AND OPERATIONS IN ANY WAY AFFECTED BY THE REMOVAL IS TO REMAIN IN FULL OPERATION. PROVIDE ALL NECESSARY COMPONENTS TO
<br />MAINTAIN SUCH OPERATION,
<br />1.02 SCOPE OF WORK
<br />A. PROVIDE ALL LABOR, MATERIALS, EQUIPMENT, AND CONTRACTOR'S SERVICES NECESSARY FOR COMPLETE, SAFE INSTALLATION OF ALL MECHANICAL WORK.
<br />THE SCOPE OF WORK SHALL INCLUDE BUT NOT BE LIMITED TO THE FOLLOWING:
<br />1. DEMOLITION AND REMOVAL OF ITEMS AS REQUIRED,
<br />2. DUCTWORK AND DUCTWORK ACCESSORIES.
<br />3. AIR DISTRIBUTION SYSTEM (AIR OUTLETS, VAV BOXES, FAN POWERED BOXES, ETC.).
<br />4. INSULATION OF EQUIPMENT AND DUCTWORK.
<br />5. SOUND ATTENUATORS AND SOUND LINING.
<br />6. AUTOMATIC TEMPERATURE CONTROLS.
<br />7. TESTING AND BALANCING.
<br />8. CUTTING AND PATCHING.
<br />9. SHOP DRAWINGS.
<br />10. AS -BUILT DRAWINGS.
<br />11. OPERATING AND MAINTENANCE MANUALS.
<br />12. FULL COORDINATION WITH OTHER TRADES.
<br />13. WARRANTY AND GUARANTY.
<br />14. PREMIUM TIME FOR WORK TO BE PERFORMED AFTER-HOURS AS REQUIRED BY BUILDING MANAGEMENT AND/OR OWNER.
<br />15. FILING, PERMITS, CONTROLLED INSPECTIONS.
<br />16. FULL TESTING AND STARTUP OF ALL SYSTEMS,
<br />B. SECURE CERTIFICATES, PAY ALL FEES AND CHARGES FOR ALL WORK INSTALLED, CERTIFYING COMPLIANCE WITH ALL AUTHORITIES. CONTRACTOR TO
<br />COORDINATE WITH OWNER FOR REQUIRED SPECIAL INSPECTIONS AND OBTAIN ALL APPROVALS. DELIVER CERTIFICATES TO OWNER FOR SIGNING BEFORE
<br />FILING.
<br />1.03 COORDINATION WITH BUILDING MANAGEMENT
<br />A. THIS CONTRACTOR IS TO OBTAIN A COPY OF THE BUILDING RULES AND REGULATIONS PRIOR TO BID SUBMISSION TO DETERMINE THE REQUIREMENTS AND THE
<br />EXTENT OF PREMIUM TIME WORK REQUIRED BY THE BUILDING.
<br />B. THIS CONTRACTOR IS RESPONSIBLE FOR ADHERING TO THE BUILDING OWNER'S RULES AND REGULATIONS, ANY DISCREPANCIES BETWEEN THE CONTRACT
<br />DOCUMENTS AND THE BUILDING RULES AND REGULATIONS SHALL BE SUBMITTED IN WRITING TO THE ARCHITECT/ENGINEER FOR REVIEW WITH BID SUBMISSION.
<br />C. COORDINATE WITH BUILDING OWNER FOR ANY SERVICE INTERRUPTION OF EXISTING SYSTEMS AND GIVE NOTICE AS REQUIRED BY BUILDING RULES AND
<br />REGULATIONS, OR CONTRACTOR TO PROVIDE A MINIMUM OF TWO (2) DAYS NOTICE PRIOR TO ANY WORK BEING PERFORMED, WHICHEVER IS THE MORE
<br />STRINGENT, CONTRACTOR IS TO PERFORM WORK ON PREMIUM TIME, IF SO DIRECTED BY BUILDING OWNER, SO AS NOT TO DISTURB EXISTING TENANTS ON
<br />OTHER FLOORS.
<br />1.04 SHOP DRAWINGS AND SUBMITTALS
<br />A. SUBMIT SHOP DRAWINGS CERTIFIED BY ALL TRADES THAT COORDINATION HAS BEEN COMPLETED, SUBMIT ALL CERTIFIED EQUIPMENT CUTS WITH
<br />CONSTRUCTION WIRING DIAGRAMS AND AUTOMATIC TEMPERATURE CONTROL REQUIREMENTS. SHOP DRAWINGS SUBMISSION SHALL INCLUDE, BUT NOT BE
<br />LIMITED TO, THE FOLLOWING:
<br />I. DUCTWORK - PROVIDE DUCT SHOP STANDARDS AND LEAKAGE TEST CERTIFICATION, AS REQUIRED, AND 3/8 SCALE DUCT LAYOUT.
<br />2. INSULATION FOR DUCTWORK AND EQUIPMENT.
<br />3. EQUIPMENT CATALOG CUTS FOR ALL ITEMS TO BE UTILIZED ON PROJECT (FANS, PUMPS, AC UNITS, VARIABLE FREQUENCY DRIVES, VAV BOXES, ETC.).
<br />4. AIR OUTLETS (DIFFUSERS, REGISTERS, GRILLES, ETC.).
<br />5. AUTOMATIC TEMPERATURE CONTROL DIAGRAMS, DEVICES AND SEQUENCE OF OPERATION.
<br />6. CERTIFIED AIR BALANCING REPORT.
<br />7. AS -BUILT DRAWINGS AT PROJECT COMPLETION OF THE INSTALLED CONDITION OF WORK.
<br />B. THE QUANTITY OF SHOP DRAWINGS SHALL AS A MINIMUM BE ONE (1) ELECTRONIC COPY. SPECIFIC JOB REQUIREMENTS MAYBE MORE STRINGENT AND
<br />CONTRACTOR IS RESPONSIBLE TO OBTAIN REQUIREMENTS FROM OWNER, CONSTRUCTION MANAGER, GENERAL CONTRACTOR OR ARCHITECT.
<br />1.05 MAINTENANCE MANUALS
<br />A. SUBMIT FOUR (4) LOOSE-LEAF BOUND OPERATING AND MAINTENANCE MANUALS WITH INDEX AND INDEX TABS TO INCLUDE THE FOLLOWING:
<br />1. OPERATING AND MAINTENANCE INSTRUCTIONS ON ALL SYSTEMS.
<br />2. MANUFACTURERS= CATALOG CUTS ON ALL EQUIPMENT.
<br />3. AUTOMATIC TEMPERATURE CONTROL SYSTEMS WITH SEQUENCE OF OPERATIONS, CATALOG CUTS OF ALL DEVICES AND POINT-TO-POINT WIRING
<br />DIAGRAMS.
<br />4. CERTIFIED FINAL AIR BALANCING REPORT,
<br />5. DUCT AS -BUILT DRAWINGS WITH VALVE CHART AND KEY PLAN DRAWINGS INSERTED IN BINDER.
<br />6. ALL ITEMS SUBMITTED FOR REVIEW IN SHOP DRAWING SECTION,
<br />1.06 AS -BUILT DRAWINGS
<br />A. CONTRACTOR SHALL MAINTAIN RECORD DRAWING PRINTS ON JOB SITE AND RECORD, AT TIME OF OCCURRENCE, DEVIATIONS FROM CONTRACT DOCUMENTS
<br />DUE TO FIELD COORDINATION, BULLETINS, OR ADDENDA.
<br />B. CONTRACTOR SHALL REVISE SHOP DRAWINGS TO CONFORM TO RECORD DRAWINGS AND SUBMIT AS -BUILT CONDITION (PIPING AND DUCTWORK) DRAWINGS
<br />UPON COMPLETION OF THE PROJECT. FINAL SUBMISSION OF REPRODUCIBLE AS -BUILT DRAWINGS ARE TO BE SIGNED AND CERTIFIED BY THE INSTALLING
<br />CONTRACTOR THAT THIS IS THE AS -BUILT CONDITION OF THE WORK.
<br />1.07 SERVICE AND WARRANTY (MAINTENANCE CONTRACT)
<br />A. THIS CONTRACTOR SHALL PROVIDE AS AN ADD ALTERNATE PRICE, A FULL ONE YEAR SERVICE AND WARRANTY OF ALL MECHANICAL COMPONENTS AND
<br />SYSTEMS, WITH PRICES FOR YEARS 2, 3 AND 4 FOLLOWING THIS FIRST YEAR. AT THE TIME OF ACCEPTANCE OF PROJECT, THE TENANT OR OWNER'S
<br />REPRESENTATIVE WILL DECIDE TO ACCEPT WHICH ALTERNATE, IF ANY.
<br />1.08 SUBSTITUTIONS
<br />A. NO SUBSTITUTE MATERIAL OR MANUFACTURER OF EQUIPMENT SHALL BE PERMITTED WITHOUT A FORMAL WRITTEN SUBMITTAL TO THE ENGINEER WHICH
<br />INCLUDES ALL DIMENSIONAL, PERFORMANCE AND MATERIAL SPECIFICATIONS. ANY CHANGES IN LAYOUT, ELECTRICAL CHARACTERISTICS, STRUCTURAL
<br />REQUIREMENTS, OR DESIGN DUE TO THE USE OF A SUBSTITUTION SHALL BE SUBMITTED TO THE ENGINEER AS PART OF THIS PROPOSAL. THE CONTRACTOR
<br />TAKES FULL RESPONSIBILITY FOR THE SUBSTITUTION AND ALL CHANGES RESULTING FROM SUBSTITUTION, ALL ITEMS SHALL BE SUBMITTED FOR REVIEW IN
<br />CONJUNCTION WITH THE SUBMITTAL OF THE SUBSTITUTION. ANY SUBSTITUTION MUST BE SUBMITTED WITH AN EXPLANATION AS TO WHY A SUBSTITUTION IS
<br />BEING UTILIZED. IF THE SUBSTITUTED ITEM DEVIATES FROM THE SPECIFIED ITEM, THOSE DEVIATIONS ARE TO BE IDENTIFIED ON A LINE -BY-LINE BASIS. IF THE
<br />SUBSTITUTE IS BEING UTILIZED FOR FINANCIAL REASONS, THE ASSOCIATED CREDIT MUST BE SIMULTANEOUSLY SUBMITTED.
<br />B. ALL SUBSTITUTED EQUIPMENT SHALL CONFORM TO SPACE REQUIREMENTS AND PERFORMANCE REQUIREMENTS SHOWN ON CONTRACT DOCUMENTS.
<br />CONTRACTOR SHALL REPLACE ANY EQUIPMENT THAT DOES NOT MEET THESE REQUIREMENTS AT HIS OWN EXPENSE. ANY MODIFICATIONS TO ASSOCIATED
<br />SYSTEMS OR ADDITIONAL COSTS ATTRIBUTED TO THIS SUBSTITUTION SHALL BE AT THIS CONTRACTOR'S EXPENSE,
<br />C. CONTRACTOR SHALL SUBMIT BID BASED ON SPECIFIED ITEMS AND SHALL SUPPLY AS AN ALTERNATE PRICE ANY SUBSTITUTIONS.
<br />1.09 ACCESS DOORS IN GENERAL CONSTRUCTION
<br />A. THIS CONTRACTOR SHALL SUBMIT TO THE ARCHITECT FOR APPROVAL A PLAN INDICATING THE SIZE AND LOCATION OF ALL ACCESS DOORS REQUIRED FOR
<br />OPERATION AND MAINTENANCE OF ALL CONCEALED EQUIPMENT, DEVICES, VALVES, DAMPERS AND CONTROLS. CONTRACTOR SHALL ARRANGE FOR FURNISHING
<br />AND INSTALLATION OF ALL ACCESS DOORS IN FINISHED CONSTRUCTION AND INCLUDE COSTS IN THE BID. ACCESS DOORS SHALL BE OF ADEQUATE SIZE TO
<br />PROVIDE ACCESS TO CONCEALED ITEMS FOR OPERATION AND MAINTENANCE, WITH A MINIMUM SIZE OF 18" X 18".
<br />PART 2 - PRODUCTSIAPPLICATIONS
<br />2.01 DUCTWORK AND ACCESSORIES
<br />A. ALL DUCTWORK SHALL BE FABRICATED AND INSTALLED IN ACCORDANCE WITH SMACNA HVAC DUCT CONSTRUCTION STANDARDS -METAL AND FLEXIBLE, LATEST
<br />EDITION, SMACNA HVAC AIR DUCT LEAKAGE TEST MANUAL, LATEST EDITION, NFPA 90A LATEST EDITION, AND 2014 NEW YORK CITY BUILDING CODE. THE MORE
<br />STRINGENT REQUIREMENT OF ANY CODES SHALL APPLY.
<br />B. PROVIDE ALL SUPPORTING AND HINGING DEVICES IN ACCORDANCE WITH NEW YORK CITY BUILDING CODE AND SMACNA.
<br />C. DUCTWORK LAYOUT AND ROUTING IS SCHEMATIC AND THE MECHANICAL CONTRACTOR IS RESPONSIBLE FOR ALL DUCT SIZE CHANGES AND RELOCATIONS TO
<br />ACCOMMODATE SPACE AND STRUCTURAL CONDITIONS. OFFSETS AND TRANSFORMATIONS SHALL PRESERVE THE FULL INSIDE CROSS -SECTIONAL AREA OF
<br />DUCTWORK SHOWN ON THE DRAWINGS.
<br />D. DUCTWORK (NEW AND EXISTING TO BE REUSED) SHALL HAVE PRESSURE CLASSIFICATION, SEALING REQUIREMENTS AND LEAKAGE TESTING IN ACCORDANCE
<br />WITH SMACNA AND AS LISTED BELOW UNLESS OTHERWISE SPECIFIED OR SHOWN ON THE DRAWINGS.
<br />1. 4" CLASS: ALL SUPPLY DUCTWORK FROM DISCHARGE OF AIR UNITS TO INLETS OF TERMINAL BOXES, SEAL CLASS A, LEAKAGE CLASS 6 (RECTANGULAR) OR
<br />CLASS 3 (ROUND).
<br />2. 2" CLASS: ALL OTHER LOW PRESSURE DUCTWORK. SEAL CLASS C, LEAKAGE CLASS 24 (RECTANGULAR) OR CLASS 12 (ROUND).
<br />3. LEAKAGE TESTING:
<br />ALL TESTING SHALL BE DONE IN THE PRESENCE OF THE ENGINEER OR OWNER=S REPRESENTATIVE. THE CONTRACTOR IS RESPONSIBLE FOR
<br />PROVIDING ALL COLLARS, CAPS, ELECTRIC POWER, ETC. NECESSARY TO PERFORM THE TESTS. THE CONTRACTOR IS ALSO RESPONSIBLE FOR
<br />SCHEDULING THE TEST NO LESS THAN THREE (3) BUSINESS DAYS PRIOR TO ITS INTENDED OCCURRENCE. LOW PRESSURE DUCTWORK (2" CLASS)
<br />SHALL BE TESTED ON AN AS -NEEDED BASIS AT THE ENGINEER=S DIRECTION. LEAKAGE TEST PROCEDURES SHALL FOLLOW THE OUTLINES AND
<br />CLASSIFICATIONS IN THE SMACNA HVAC DUCT LEAKAGE TEST MANUAL. IF SPECIMEN FAILS TO MEET ALLOTTED LEAKAGE LEVEL, THE CONTRACTOR
<br />SHALL MODIFY TO BRING IT INTO COMPLIANCE AND SHALL RETEST IT UNTIL ACCEPTABLE LEAKAGE IS DEMONSTRATED. TESTS AND NECESSARY
<br />REPAIR SHALL BE COMPLETED PRIOR TO CONCEALMENT OF DUCTS.
<br />E. MATERIALS:
<br />1, SHEETMETAL: UNLESS OTHERWISE SPECIFIED OR INDICATED, DUCTS SHALL BE CONSTRUCTED OF HOT -DIPPED GALVANIZED SHEETMETAL WITH 60
<br />COMMERCIAL COATING ACCORDING TO ASTM 653 AND A924.
<br />2. FLEXIBLE CONNECTIONS AT FANS SHALL BE NEOPRENE COATED, FLAME RETARDANT GLASS FABRIC (COMPLYING WITH NFPA 90 AND 96), 30 OZ./SQ. YD.
<br />WITH SOWN AND CEMENTED SEAMS.
<br />3. FLEXIBLE DUCTWORK SHALL PERMITTED WITHIN S OF AIR OUTLETS.
<br />F. FABRICATION:
<br />1. CONFORM TO SMACNA AND 2015 INTERNATIONAL MECHANICAL CODE REQUIREMENTS FOR METAL THICKNESS, REINFORCING, JOINTS, AND SEALING FOR
<br />MAXIMUM STATIC PRESSURES INVOLVED. ALL SEAMS AND JOINTS SHALL BE SEALED AND TAPED
<br />2. ELBOWS SHALL CONFORM TO SMACNA REQUIREMENTS AND THE FOLLOWING:
<br />A) PROVIDE LONG RADIUS TYPE WITH CENTERLINE RADIUS MINIMUM 1.5 TIMES DUCT WIDTH. PROVIDE SHORT RADIUS OR SQUARE ELBOWS WHERE
<br />INDICATED OR WHERE REQUIRED TO FIT RESTRICTED SPACES. PROVIDE DOUBLE THICKNESS TURNING VANES ON ALL SHORT RADIUS AND MITERED
<br />ELBOWS. CONFORM TO SMACNA FOR THE NUMBER OF VANES FOR FITTINGS,
<br />3. BRANCH CONNECTIONS: PROVIDE 45 DEGREE ENTRY OR CONICAL TAPS. PROVIDE RADIUS TYPE FITTINGS FOR DIVIDED FLOW BRANCHES.
<br />G. ACOUSTICALLY LINED DUCTWORK:
<br />1. PROVIDE MAT -FACED GLASS DUCT LINER, 1-INCH THICK -2 LB/CF DENSITY. DUCT DIMENSIONS INDICATED ARE CLEAR (NET) INSIDE DIMENSIONS. FOR DUCT
<br />VELOCITIES GREATER THAN 2,000 FPM, FACE DUCT LINER WITH 24 GAUGE PERFORATED ALUMINUM OR GALVANIZED STEEL, FULLY COVERING DUCT LINER,
<br />AND SUPPORTED 12 ON CENTER. DO NOT EXTERNALLY INSULATE ACOUSTICALLY LINED DUCTWORK. CONFORM TO SMACNA REQUIREMENTS FOR
<br />INSTALLATION. PROVIDE ACOUSTICALLY LINED DUCT WHERE LISTED BELOW AND/OR SHOWN ON THE DRAWINGS:
<br />A) ALL TRANSFER DUCTS.
<br />B) EXPOSED SUPPLY DUCTWORK.
<br />C) WITHIN A MINIMUM OF 20 FEET OF ALL AC UNIT DISCHARGES.
<br />D) WITHIN A MINIMUM OF 20 FEET OF FAN INLET AND DISCHARGES.
<br />E) WITHIN A MINIMUM OF 15 FEET DOWNSTREAM OF THE TERMINAL BOXES (VAV, DUAL DUCT, CAV OR FAN POWERED).
<br />H. VOLUME DAMPERS:
<br />I. GALVANIZED STEEL OR SAME AS DUCT CONSTRUCTION. CONFORM TO SMACNA HVAC DUCT CONSTRUCTION STANDARDS, 1995 OR LATEST EDITION,
<br />OPPOSED BLADE TYPE. PROVIDE BEARING AT BOTH ENDS OF DAMPER ROD AND QUADRANT, WITH LEVER AND LOCKSCREW, AT ONE END. INSTALL WITH
<br />LEVERS ACCESSIBLE THROUGH INSULATION. SPUTTER DAMPER OR AIR EXTRACTORS SHALL NOT BE USED ON THIS PROJECT,
<br />2. PROVIDE MANUAL BALANCING VOLUME DAMPERS AS REQUIRED TO PROPERLY BALANCE THE AIR DISTRIBUTION SYSTEM. IF THE LOCATION OF BALANCING
<br />DAMPERS ARE NOT DEFINED ON THE DRAWINGS, THE FOLLOWING MINIMUM STANDARDS SHALL GOVERN:
<br />A) LOW PRESSURE: ALL SUPPLY AIR MAIN BRANCHES FROM TRUNK, EACH SPLIT, AND ALL SUB -BRANCHES FROM MAINS SHALL BE PROVIDED WITH
<br />BALANCING DAMPERS.
<br />B) MEDIUM PRESSURE: ALL BRANCHES AND TAKEOFFS DOWNSTREAM OF TERMINAL BOXES (VAV OR FAN POWERED) SHALL BE PROVIDED WITH
<br />BALANCING DAMPERS,
<br />C) AS NOTED ON PLANS.
<br />I. DUCT ACCESS DOORS:
<br />1. CONFORM TO SMACNA WITH PIANO HINGES, TWO SASH LOCKS AND DOOR GASKETS. SCREWED ACCESS PANELS ARE NOT PERMITTED. PROVIDE
<br />REMOVABLE ACCESS DOORS WHERE DOOR SWING CANNOT BE ACCOMMODATED,
<br />2. SIZE: MINIMUM 20"X14" EXCEPT DUCTS LESS THAN 16", ONE DIMENSION 20" AND THE OTHER DIMENSION, 2" LESS THAN THE DUCT WIDTH.
<br />3. PROVIDE ACCESS DOORS: AT ENTERING AND LEAVING SIDES OF COILS IN DUCTS; AUTOMATIC DAMPERS ON LINKAGE SIDE, MANUAL VOLUME DAMPERS 2
<br />SQ, FT. AND LARGER, FIRE DAMPERS, SMOKE DAMPERS, COMBINATION FIRE/SMOKE DAMPERS, SMOKE DETECTION HEADS, FAN BEARINGS ENCLOSED IN
<br />DUCTS, SUCTION AND DISCHARGE SIDES OF CEILING MOUNTED FANS, FILTERS, REHEAT COILS, AT ALL EQUIPMENT REQUIRING ACCESS AND AS INDICATED ON
<br />DRAWINGS
<br />J. EXPOSED DUCTWORK:
<br />I, WHERE DUCTWORK IS INDICATED TO BE EXPOSED TO VIEW IN OCCUPIED SPACES, PROVIDE MATERIALS WHICH ARE FREE FROM VISUAL IMPERFECTIONS,
<br />INCLUDING FITTINGS, SEAM MARKS, STAINS, DISCOLORATIONS, AND OTHER IMPERFECTIONS. PROVIDE FINISHES WHICH WILL ALLOW PAINTING. PROVIDE
<br />FLAT TYPE SEAMS AND JOINTS FOR ALL EXPOSED DUCT CONSTRUCTION.
<br />2.03 INSULATION
<br />A, ALL INSULATION SHALL MEET THE REQUIREMENTS OF ASTM, NFPA, 2018 WASHINGTON STATE ENERGY CODE AND ALL AUTHORITIES HAVING JURISDICTION, ALL
<br />MECHANICAL INSULATION (JACKETING, COVERINGS, ADHESIVES, MASTICS, FACINGS, TAPES, ETC.), SHALL HAVE RATINGS NOT EXCEEDING A AFLAME SPREAD OF 25 OR
<br />LESS AND SMOKE DEVELOPED INDEX OF 50 OR LESS.
<br />B. BEFORE APPLYING INSULATION, ALL PRESSURE AND LEAK TESTS SHALL BE COMPLETED AND APPROVED. FURNISH AND INSTALL AS PER MANUFACTURER=S
<br />REQUIREMENTS.
<br />C. INSULATION FOR FITTINGS OR ACCESSORIES REQUIRING SERVICING OR INSPECTION SHALL HAVE INSULATION REMOVABLE AND REPLACEABLE WITHOUT
<br />DAMAGE.
<br />D. DUCT INSULATION:
<br />1, GENERAL
<br />A) INSULATION SHALL BE APPLIED WITH MASTICS, ADHESIVES, COATINGS, WITH COVERS, WEATHER -PROTECTION AND OTHER WORK AS REQUIRED BY
<br />MANUFACTURER'S RECOMMENDATIONS. DO NOT INSULATE SOUND LINED DUCTWORK. MATERIALS SHALL MEET REQUIREMENTS OF ADHESIVE AND
<br />SEALANT COUNCIL STANDARDS AND SMACNA.
<br />B) ALL SUPPLY AND RETURN DUCTS AND PLENUMS SHALL BE INSULATED WITH A MINIMUM OF R-6 INSULATION WHEN LOCATED IN UNCONDITIONED
<br />SPACES, A MINIMUM OF R-8 INSULATION SHALL BE INSTALLED WHEN LOCTATED OUTSIDE OF THE BUILDING. WHEN A DUCT OR PLENUM IS LOCATED
<br />WITHIN THE BUILDING ENVELOPE ASSEMBLY, THE DUCT OR PLENUM SHALL BE SEPERATED FROM THE BUILDING EXTERIOR OR UNCONDITIONED SPACES
<br />BY A MINIMUM OF R-8 INSULATION.
<br />2. CONCEALED DUCTWORK
<br />A) INSULATE SUPPLY AND FRESH AIR DUCTS AND PLENUMS IN CONCEALED SPACES AND RETURN DUCT NOT IN CEILING PLENUM WITH AT LEAST 1-1/2
<br />THICK FIBROUS GLASS DUCT WRAP, WITH A MINIMUM R VALUE OF R-65 AND FOIL-KRAFT FLAME RESISTANT VAPOR BARRIER.
<br />3. EXPOSED DUCTWORK
<br />A) INSULATE EXPOSED FRESH AIR DUCTS AND EXPOSED PLENUM WITH 2" THICK, SEMI -RIGID FIBROUS GLASS BOARDS WITH A MINIMUM R VALUE OF R-8
<br />AND A FACTORY APPLIED FIRE RETARDANT FOIL REINFORCED KRAFT VAPOR BARRIER FACING. PROVIDE WELD PINS AND VAPOR SEAL ALL JOINTS WITH
<br />TAPE
<br />2.04 ELECTRICAL WORK
<br />A. GENERAL
<br />1. ELECTRICAL POWER WIRING SHALL BE PROVIDED BY THE ELECTRICAL CONTRACTOR; CONTROL WIRING SHALL BE BY THE HVAC CONTRACT. CONTROL WIRING
<br />SHALL BE DEFINED AS ANY 12V, 24V, OR 120V WIRING INSTALLED FOR PURPOSES OTHER THAN PROVIDING PRIMARY ELECTRICAL POWER TO EQUIPMENT,
<br />2. MOTOR STARTERS AND VARIABLE FREQUENCY DRIVES (VFD) SHALL BE FURNISHED BY THE HVAC CONTRACTOR AND INSTALLED BY THE ELECTRICAL
<br />CONTRACTOR. REFER TO THE EQUIPMENT SECTION FOR VARIABLE FREQUENCY DRIVE SPECIFICATIONS.
<br />3. DUCT MOUNTED SMOKE DETECTORS, WHERE REQUIRED, SHALL BE PROVIDED BY AD WIRED BY THE ELECTRICAL CONTRACTOR, AND MOUNTED BY THE
<br />HVAC CONTRACTOR.
<br />4, ALL ELECTRICAL CONTROL WIRING SHALL COMPLY WITH LOCAL ELECTRICAL CODE, ALL AUTHORITIES HAVING JURISDICTION AND THE PROJECT ELECTRICAL
<br />SPECIFICATIONS.
<br />5. MECHANICAL CONTRACTOR TO OBTAIN QUANTITY OF CONTROLLERS REQUIRED AND COORDINATE WITH THE ELECTRICAL CONTRACTOR FOR ALL
<br />OPERATING REQUIREMENTS, INTERLOCKS AND CONNECTIONS FOR STARTERS.
<br />6. THE MECHANICAL CONTRACTOR SHALL PREPARE AND SUBMIT FOR APPROVAL POINT-TO-POINT, COMPLETELY COORDINATED WIRING DIAGRAMS AND
<br />INDICATE ALL SOURCE POWER REQUIREMENTS AND ALL FIELD WIRING TO BE PERFORMED BY THE ELECTRICAL CONTRACTOR.
<br />B. MOTORS:
<br />1. MOTORS SHALL HAVE THE ELECTRICAL CHARACTERISTICS AS LISTED ON THE DRAWINGS. COORDINATE ALL REQUIREMENTS WITH THE ELECTRICAL
<br />CONTRACTOR. ALL MOTORS SHALL COMPLY WITH NEMA MG-1 STANDARD AND SHALL BE OF THE HIGH EFFICIENCY TYPE AND MEET THE 1992 EPA ENERGY
<br />EFFICIENCY ACT AND UTILITY COMPANY REBATE REQUIREMENTS.
<br />2. MOTORS FOR VARIABLE FREQUENCY DRIVES (VFD) SHALL BE SUITABLE FOR USE WITH VARIABLE FREQUENCY DRIVES AND COMPLY WITH NEMA MG-1 PART
<br />31.40.4.2. THE MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING ALL REQUIREMENTS OF THE MOTOR AND VFD MANUFACTURER.
<br />3. IF CONTRACTOR ELECTS TO SUBSTITUTE OR INCREASE MOTOR HORSEPOWER OVER THAT WHICH IS SPECIFIED, THE COST OF MOTOR AND ELECTRICAL
<br />CHANGES SHALL BE BORNE BY THIS CONTRACTOR.
<br />C. ENCLOSURES:
<br />1. PROVIDE ENCLOSURES FOR STARTERS AND VFD'S SUITABLE FOR OPERATING ENVIRONMENT. ENCLOSURES SHALL BE NEMA 1 VENTILATED SHEETMETAL
<br />FOR INDOOR APPLICATION, NEMA 3R WITH ADDITIONAL GASKETING WEATHERPROOF RAINTIGHT ENCLOSURE OR EXPOSED OUTDOOR SERVICE OR INDOOR
<br />SERVICE EXPOSED TO MOISTURE. PROVIDE DISCONNECT SWITCH ON ENCLOSURE AS REQUIRED FOR SERVICE.
<br />2.05 VIBRATION ISOLATION PRODUCTS
<br />A. FURNISH AND INSTALL ALL NECESSARY VIBRATION ISOLATORS, VIBRATION HANGERS, MOUNTING PADS, RAILS, ETC., TO ISOLATE VIBRATION AND SOUND FROM
<br />BEING TRANSMITTED TO THE BUILDING CONSTRUCTION. ALL VIBRATION ISOLATION PRODUCTS SHALL BE SPECIFICALLY DESIGNED FOR THEIR INTENDED USE.
<br />B. MANUFACTURER OF VIBRATION ISOLATION EQUIPMENT SHALL HAVE THE FOLLOWING RESPONSIBILITIES:
<br />1. DETERMINE VIBRATION ISOLATOR SIZES AND LOCATIONS.
<br />2. PROVIDE SUITABLE PIPING AND EQUIPMENT VIBRATION ISOLATION SYSTEMS,
<br />3. GUARANTEE SPECIFIED ISOLATION SYSTEM ATTENUATION AND DEFLECTION,
<br />4. PROVIDE INSTALLATION INSTRUCTIONS, DRAWINGS AND FIELD SUPERVISION TO ASSURE PROPER INSTALLATION AND PERFORMANCE.
<br />C. ISOLATION SYSTEMS SHALL BE MANUFACTURED BY MASON INDUSTRIES OR APPROVED EQUAL BY THE ENGINEER,
<br />D. MOUNTING TYPES:
<br />1. STATIC DEFLECTION OF ISOLATORS SHALL BE A MINIMUM OF 90% EFFICIENCY. PROVIDE CORROSION PROTECTION FOR EQUIPMENT MOUNTED OUTDOORS.
<br />2. MOUNTING OF CEILING -SUPPORTED FANS, IN -LINE PUMPS, HEAT EXCHANGERS, AND AIR HANDLING UNITS - SPRING ISOLATORS - (TYPE DNHS).
<br />3. PROVIDE FLEXIBLE CONNECTIONS BETWEEN ALL FANS AND DUCTWORK (REFER TO DUCTWORK SECTION FOR SPECIFICATIONS),
<br />2.06 SEISMIC RESTRAINTS
<br />A. DELEGATED DESIGN: ALL EQUIPMENT, PIPING AND DUCTWORK SHALL BE ADEQUATELY RESTRAINED TO RESIST SEISMIC FORCES. THIS SPECIFICATION IS IN
<br />ADDITION TO THE SPECIFIED VIBRATION ISOLATION FOR THIS PROJECT. RESTRAINT DEVICES SHALL BE DESIGNED AND SELECTED TO MEET SEISMIC REQUIREMENTS
<br />AS DEFINED IN THE LATEST ISSUE OF THE STATE AND LOCAL CODE HAVING JURISDICTION AND INTERNATIONAL BUILDING CODE_ (IBC).
<br />B. INSTALLATION
<br />1. ALL SEISMIC RESTRAINTS ARE TO BE SECURELY ANCHORED OR FASTENED TO THE EQUIPMENT AND SUPPORTING STRUCTURE IN ACCORDANCE WITH THE
<br />APPROVED SUBMITTAL DATA.
<br />CD
<br />CD
<br />m
<br />e • •
<br /><Pick location in Project Information>
<br />3/5/20217:10:29 PM
<br />
|