Laserfiche WebLink
1, COORDINATE EQUIPMENT LOCATIONS WITH MECHANICAL AND PLUMBING <br />CONTRACTORS PRIOR TO ROUGH -IN. <br />2. DISCONNECTS AND FUSED DISCONNECTS SHALL BE PROVIDED WITH <br />MECHANICAL EQUIPMENT. <br /># KEY NOTES: <br />M:01 MECHANICAL UNIT PROVIDED WITH INTEGRAL DISCONNECT <br />MECHANICAL POWER ADD ALTERNATE 1 <br />1. ALL ROOFTOP MECHANICAL UNITS SUPPORTING COMCAST SPACE TO BE <br />REPLACED, IN -KIND, IT IS ASSUMED THE ELECTRICAL FEED TO EACH WILL REMAIN <br />AS -IS EXCEPT FUSED DISCONNECT AT UNIT SHALL BE REPLACED WITH NEW ON - <br />UNIT DISCONNECT. ELECTRICAL CONTRACTOR TO RECONNECT NEW UNIT. <br />2. ALL VVT BOXES TO BE REPLACED WITH NEW MECHANICAL EQUIPMENT. IT IS <br />ASSUMED ONE 20A, 277V CIRCUIT WILL ORIGINATE FROM PANEL H1H7 TO <br />SUPPORT ALL NEW EQUIPMENT. MECHANICAL EQUIPMENT TO BE PROVIDED WITH <br />NEW ON -UNIT DISCONNECT AT EACH NEW PIECE OF EQUIPMENT. <br />3, SEE MECHANICAL DRAWINGS FOR ADDITIONAL DETAILS ON SPECIFIC QUANTITIES <br />AND LOCATIONS OF EQUIPMENT. <br />I / E-20 I B <br />i <br />%�4bp <br />2021-03-05 <br />Project NOoe227055011 <br />File Name: N/A <br />GN/PE <br />GN/PE PE/MS 01/20/21 <br />Dwn. <br />Dsgn. Chkd, YYYY.MM.DD <br />Title <br />LEVEL <br />MECH POWER <br />PLAN <br />I /F _ 1 9- 99 <br /><Pick location in Project Information> <br />3/4/2021 7:03:07 PM <br />Drawing No. E=201 A <br />