Laserfiche WebLink
MECHANICAL POWER NOTES#MECHANICAL <br />1. COORDINATE EQUIPMENT LOCATIONS WITH MECHANICAL AND PLUMBING 1. ALL ROOFTOP MECHANICAL UNITS SUPPORTING COMCAST SPACE TO BE <br />CONTRACTORS PRIOR TO ROUGH -IN. REPLACED, IN -KIND. IT IS ASSUMED THE ELECTRICAL FEED TO EACH WILL REMAIN <br />2, DISCONNECTS AND FUSED DISCONNECTS SHALL BE PROVIDED WITH AS -IS EXCEPT FUSED DISCONNECT AT UNIT SHALL BE REPLACED WITH NEW ON - <br />MECHANICAL EQUIPMENT. UNIT DISCONNECT. ELECTRICAL CONTRACTOR TO RECONNECT NEW UNIT. <br />2. ALL VVT BOXES TO BE REPLACED WITH NEW MECHANICAL EQUIPMENT. IT IS <br />ASSUMED ONE 20A, 277V CIRCUIT WILL ORIGINATE FROM PANEL H1H7 TO <br />SUPPORT ALL NEW EQUIPMENT. MECHANICAL EQUIPMENT TO BE PROVIDED WITH <br />NEW ON -UNIT DISCONNECT AT EACH NEW PIECE OF EQUIPMENT. <br />3. SEE MECHANICAL DRAWINGS FOR ADDITIONAL DETAILS ON SPECIFIC QUANTITIES <br />AND LOCATIONS OF EQUIPMENT. <br />'f3v�p^`yi <br />I i <br />1 <br />0 <br />r <br />N O <br />za <br />0 ° a a <br />O <br />0 V U <br />� 2 <br />OO U o <br />E 6 Q o <br />10 v <br />°oQT <br />u� <br />(D� <br />3 <br />o m a <br />0 <br />Q) <br />�L as <br />N <br />i <br />g c o <br />O 6 4s <br />b q>�Lo <br />En_E <br />rV <br />O <br />j `O '00 N <br />10 <br />--� N <br />o ov <br />® <br />U 3 U <br />t✓i -CD <br />r'o <br />(-) <br />N 6 N <br />--a, `o <br />i <br />co <br />CN <br />i is <br />T <br />m <br />V) <br />L <br />Lu <br />0 <br />Z <br />Q <br />U <br />=D <br />0 cn <br />U 12 <br />2021-03-05 <br />Project No.,227055031 <br />File Name: N/A <br />GN/PE <br />GN/PE PE/MS 02/19/21 <br />Own. <br />Dsgn. Chid. YYYY.MM.DD <br />Title <br />LEVEE <br />MECH POWER <br />LAN <br /><Pick location in Project Information> <br />3/4/2021 7:03:08 PM <br />Scale: As indicated <br />Drawing No. Em201 B <br />