Laserfiche WebLink
GENERAL NOTES <br />1. FIRE ALARM DEVICES, INCLUDING QUANTITY, TYPE, CANDELA, AND PLACEMENT, ARE AN ESTIMATE BASED ON THE 2019 NFPA 72. COORDINATE FINAL DEVICE LOCATIONS, QUANTITY, AND <br />REQUIREMENTS WITH FIRE ALARM VENDOR. FIRE ALARM VENDOR TO OBTAIN FIRE ALARM PERMIT. FIRE ALARM VENDOR SHALL PROVIDE DRAWINGS AS NECESSARY TO THE CITY OF <br />EVERETT TO OBTAIN ALL PERMITS AND INSTALL A COMPLETE, FULLY OPERATIONAL BUILDING -WIDE FIRE ALARM SYSTEM FOR THE BUILDING. FIRE ALARM VENDOR TO PROVIDE <br />ENGINEER STAMPED DRAWINGS AS STATE OF WASHINGTON. <br />2. EXISTING FIRE ALARM SYSTEM TO REMAIN, MODIFY AS NECESSARY TO PROVIDE COMPLETE, FULLY OPERATIONAL BUILDING -WIDE FIRE ALARM SYSTEM. VERIFY PROPER OPERATION OF <br />ALL EXISTING FIRE ALARM DEVICES ON THE FLOOR PRIOR TO AND AFTER PROJECT COMPLETION. THE BUILDING FIRE SAFETY DIRECTOR SHALL BE ADVISED OF ANY DEVICE FOUND <br />DAMAGED, DEFECTIVE, OR INOPERATIVE. FIRE ALARM CONTRACTOR TO DETERMINE CONNECTION POINTS TO EXISTING FIRE ALARM SYSTEM. <br />3. EXISTING FIRE ALARM SYSTEM ASSUMED TO BE CODE -COMPLIANT WITH REQUIRED DEVICES INSTALLED. PROVIDE NEW DEVICE IF AREA IS MISSING REQUIRED FIRE ALARM DEVICE. <br />4. PROVIDE SMOKE DETECTOR AT ALL NEW LOCATIONS OF CONTROL UNITS, NOTIFICATION APPLIANCE CIRCUIT POWER EXTENDERS, AND SUPERVISING STATION TRANSMITTING <br />EQUIPMENT PER NFPA 72 §10.4.5, <br />5. ALL NEW WIRING SHALL BE APPROVED FOR FIRE ALARM SYSTEM INSULATION. RUN WIRING CONCEALED IN WALLS FOR CEILINGS. RUN WIRING IN CONDUIT IN EXPOSED AREAS. <br />A. PROVIDE MINIMUM #14 AWG COPPER, TEFLON CABLE, 600V, (STROBE LIGHT WIRING). <br />B. PROVIDE MINIMUM #16 AWG COPPER, TWISTED SHIELDED, TEFLON CABLE, 600V, LOOP NOT TO EXCEED 2,000 FEET (ALL OTHER FIRE ALARM DEVICES AND SPEAKER WIRING). <br />6. ALL NEW FIRE ALARM DEVICES AND EQUIPMENT REQUIRED FOR EXISTING MODIFICATION SHALL BE SIMILAR AND COMPLETELY COMPATIBLE WITH EXISTING BUILDING FIRE ALARM <br />SYSTEM. CONTACT BASE BUILDING FIRE ALARM MAINTENANCE COMPANY PRIOR TO ORDERING NEW FIRE ALARM SYSTEM. CONTACT BASE BUILDING FIRE ALARM MAINTENANCE <br />COMPANY PRIOR TO ORDERING NEW FIRE ALARM DEVICES AND CONNECT ALL NEW FIRE ALARM DEVICES AS PER FIRE ALARM VENDOR RECOMMENDATIONS AND INTERCONNECTING <br />WIRING DIAGRAMS. COORDINATE ALL WORK HEREIN RELATED TO THE BUILDING FIRE ALARM SYSTEM WITH THE BUILDING ENGINEER AND MAINTENANCE COMPANY. <br />7, GIVE NOTICES, SUBMIT, AND FILE ALL NECESSARY DRAWINGS FOR APPROVAL TO THE NATIONAL, STATE, AND LOCAL BUILDING AND FIRE DEPARTMENTS, OBTAIN PERMITS, APPROVALS <br />OR LICENSES NECESSARY TO CARRY OUT THIS WORK AND PAY ALL FEES THEREFORE. ARRANGE FOR FIRE DEPARTMENT INSPECTION AND TESTS INCLUDING CONTROLLED <br />INSPECTIONS OF ANY OR ALL PARTS OF THE WORK IF SO REQUIRED BY AUTHORITIES OR UTILITY COMPANIES HAVING JURISDICTION AND PAY ALL CHARGES FOR SAME. <br />8, AT THE CONCLUSION OF THE PROJECT THE CONTRACTOR SHALL PROVIDE A FUNCTIONALITY TEST AS REQUIRED BY CODE AND AN "AS -BUILT" FIRE ALARM RISER TO THE ENGINEER, <br />BUILDING, AND SUBMIT TO THE FIRE DEPARTMENT. <br />9. COPY OF THE FINAL LETTER OF APPROVAL SHALL BE FORWARDED TO BUILDING MANAGEMENT. <br />10. ENTIRE INSTALLATION SHALL BE COMPLETELY TESTED PRIOR TO THE FIRE DEPARTMENT INSPECTION. <br />105 <br />TRAINING <br />J� <br />1/ FA-101 B <br />1 D04 <br />1 / FA-101 B <br />i <br />QL <br />co <br />Permit/Seal <br />Project No.:227055011 <br />File Name: N/A <br />GN/PE GN/PE PE/MS 01/21/21 <br />Dwn. Dsgn. Chkd. YYYY.MM.DD <br />Iffirz, <br />LEVEL 1 FIRE ALARM <br />PLAN A <br /><Pick location in Project Information> <br />3/4/2021 7:04:09 PM <br />Scale: As indicated <br />Revision: <br />Drawing No. FAw101A <br />