My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Brink Electrical Inc. 7/19/2022
>
Contracts
>
Capital Contract
>
Brink Electrical Inc. 7/19/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2023 2:29:32 PM
Creation date
7/21/2022 11:58:20 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Brink Electrical Inc.
Approval Date
7/19/2022
Council Approval Date
5/25/2022
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Inductive Charging Infrastructure for Transit
Tracking Number
0003429
Total Compensation
$498,000.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Brink Electric, LLC 11/6/2023 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Brink Electrical Inc. 2/9/2023 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Brink Electrical Inc. 2/9/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Brink Electrical Inc. 2/9/2023 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
380
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> City of Everett 01 25 00 - 3 <br /> ' Inductive Charging Infrastructure for Everett Transit <br /> the Contractor shall provide suitable, secure storage and protect from damage, theft or <br /> other loss until installation. <br /> 1.6 PRODUCT SELECTION <br /> ' A. GENERAL PRODUCT REQUIREMENTS: Provide products that comply with contract <br /> documents, that are undamaged and, unless otherwise indicated, unused at the time of <br /> ' installation. <br /> 1. Provide products complete with all accessories, trim, finish, safety guards and <br /> other devices and details needed for a complete installation and for the intended <br /> use and effect. <br /> 2. STANDARD PRODUCTS: Where available, provide standard products of types <br /> that have been produced and used successfully in similar situations on other <br /> project. <br /> ' B. PRODUCT SELECTION PROCEDURES: Product selection is governed by contract <br /> documents and governing regulations, not by previous project experience. Procedures <br /> ' governing product selection include the following: <br /> 1. PROPRIETARY SPECIFICATION REQUIREMENTS: Where only a single product <br /> or manufacturer is named, followed by "no equal", "no substitution", "or no <br /> exception", provide the product indicated. Advise Architect when it is discovered <br /> ' that the named product is not a feasible solution. <br /> 2. SEMIPROPRIETARY SPECIFICATION REQUIREMENTS: Where two or more <br /> products or manufacturers are named, followed by"no equals", "no substitutions", <br /> ' or"no exception", provide one of the products named. Advise Architect when none <br /> of the named products comply with specification requirements or are not feasible <br /> for use. <br /> t 3. NON-PROPRIETARY SPECIFICATION REQUIREMENTS: Where the <br /> specifications name products or manufacturers that are indicative of the type and <br /> quality of the product to be incorporated in the work, followed by the term "or <br /> ' equal", or similar language, comply with the contract documents provisions <br /> concerning "product substitutions" to obtain approval for use of an unnamed <br /> product. <br /> 4. DESCRIPTIVE SPECIFICATION REQUIREMENTS: Where the specifications <br /> ' describe a product or assembly defining the characteristics required, but with or <br /> without use of a brand or trade name, provide products or assemblies that provide <br /> the characteristics indicated and otherwise comply with contract requirements. <br /> 5. PERFORMANCE SPECIFICATION REQUIREMENTS: Where specifications <br /> require compliance with performance requirements, provide products that comply <br /> with these requirements, which are recommended by the manufacturer for the <br /> ' application indicated. Submit manufacturer's recommendations contained in <br /> published product literature, or by the manufacturer's individual certification of <br /> performance for approval by Architect. General overall performance of a product <br /> is implied where the product is specified for specific application. <br /> ' 6. VISUAL MATCHING: Where matching an established sample is required, the <br /> owners decision will be final on whether a proposed product matches satisfactorily. <br /> a. Where there is no product available within the specified product category <br /> ' which matches satisfactorily and also complies with other specified <br /> requirements; comply with the provisions of the contract documents <br /> 01 25 00 - 3 SUBSTITUTION PROCEDURES <br />
The URL can be used to link to this page
Your browser does not support the video tag.