My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Brink Electrical Inc. 7/19/2022
>
Contracts
>
Capital Contract
>
Brink Electrical Inc. 7/19/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2023 2:29:32 PM
Creation date
7/21/2022 11:58:20 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Brink Electrical Inc.
Approval Date
7/19/2022
Council Approval Date
5/25/2022
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Inductive Charging Infrastructure for Transit
Tracking Number
0003429
Total Compensation
$498,000.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Brink Electric, LLC 11/6/2023 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Brink Electrical Inc. 2/9/2023 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Brink Electrical Inc. 2/9/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Brink Electrical Inc. 2/9/2023 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
380
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> City of Everett 01 25 00 - 5 <br /> Inductive Charging Infrastructure for Everett Transit <br /> apparent as a consequence of the substitution and that he will bear all costs related <br /> thereto. <br /> ' 4. If, in the opinion of the Owner, the proposed substitution is not equal or better in <br /> every respect to that specified, the Contractor shall furnish the specified material <br /> or product at no additional cost to the Owner. <br /> E. CONDITIONS: Contractor's request for substitution will be reviewed and considered <br /> except as noted when extensive revisions to contract documents are not required and <br /> changes are in keeping with the general intent of contract documents; when timely, fully <br /> documented and properly submitted; and when one or more of the following conditions <br /> is satisfied, all as judged by Owner. Otherwise, requests will be returned without action <br /> except to record non-compliance with these requirements: <br /> ' 1. Where request is directly related to an "or equal"clause or other language of same <br /> effect in contract documents. <br /> 2. Where required product, material or method cannot be provided within contract <br /> time, but not as a result of Contractor's failure to pursue the work promptly or <br /> coordinate various activities properly. <br /> 3. Where required product, material, or method cannot be provided in a manner which <br /> is compatible with other materials of the work, or cannot be properly coordinated <br /> therewith, or cannot be used without adversely affecting Owner's insurance <br /> coverage on completed work, or will encounter other substantial non-compliances <br /> ' which are not possible to otherwise overcome except by making requested <br /> substitution, which Contractor's thereby certifies to overcome such <br /> noncompliance, non-coordination, non-warranty, non-insurability, or other non- <br /> compliance as claimed. <br /> ' 4. Where required product, material or method cannot receive approval by a <br /> governing authority, and requested substitution can be so approved. <br /> 5. Where substantial advantage is offered Owner, in terms of cost, time or other <br /> ' valuable considerations, after deducting offsetting responsibilities Owner may be <br /> required to bear, including additional compensation to Architect for redesign and <br /> evaluation services, increased cost of other work by Owner or separate <br /> Contractors, and similar considerations. <br /> F. After sixty(60)calendar day period following "Notice To Proceed": Requests for approval <br /> of substitute materials will not be considered, except if one or more of the following <br /> conditions exists. With his request, the Contractor shall indicate which condition he <br /> believes applies. <br /> 1. UNAVAILABILITY: A substitution is required because the specified item is not <br /> ' available, due to factors beyond the control of the Contractor. <br /> 2. UNSUITABILITY: Subsequent information or changes disclose inability of the <br /> specified item to perform as intended. <br /> ' 3. REGULATORY REQUIREMENTS: Final interpretation of code, regulatory <br /> requirements, safety requirements, or insurance requirements necessitate a <br /> change due to inability of the specified item to conform. <br /> 4. WARRANTY: Manufacturer or fabricator cannot certify or warrant performance of <br /> specified item as required. <br /> 5. OWNER'S BENEFIT: In the judgment of the Architect, acceptance of the proposed <br /> substitution is clearly in the Owner's best interest because of cost, quality, or other <br /> ' consideration. In requesting a substitution under this clause, the Contractor shall <br /> furnish substantiation of any such reason. <br /> 01 25 00 - 5 SUBSTITUTION PROCEDURES <br />
The URL can be used to link to this page
Your browser does not support the video tag.