My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Brink Electrical Inc. 7/19/2022
>
Contracts
>
Capital Contract
>
Brink Electrical Inc. 7/19/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2023 2:29:32 PM
Creation date
7/21/2022 11:58:20 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Brink Electrical Inc.
Approval Date
7/19/2022
Council Approval Date
5/25/2022
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Inductive Charging Infrastructure for Transit
Tracking Number
0003429
Total Compensation
$498,000.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Brink Electric, LLC 11/6/2023 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Brink Electrical Inc. 2/9/2023 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Brink Electrical Inc. 2/9/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Brink Electrical Inc. 2/9/2023 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
380
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 01 25 00- 6 <br /> Inductive Charging Infrastructure for Everett Transit ' <br /> G. Substitutions will not be considered if they are indicated or implied on shop drawings or <br /> other project data submittals, without proper notice shown on Section 00 63 25. <br /> H. WORK-RELATED SUBMITTALS: Contractor's submittal of, and Architect's acceptance <br /> of, shop drawings, product data or samples which indicate work not complying with <br /> requirements of contract documents, does not constitute an acceptable and valid request <br /> for, nor approval of, a substitution. <br /> I. GENERAL CONDITIONS: To this extent this Section is inconsistent with Subsection 8.5 <br /> of Section 007200 General Conditions, the requirement most stringent on the Contractor <br /> governs. <br /> PART 2 - PRODUCTS (Not Used) <br /> PART 3 - EXECUTION (Not Used) <br /> END OF SECTION 01 25 00 ' <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 01 25 00 - 6 SUBSTITUTION PROCEDURES ' <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.