Brink Electrical Inc. 7/19/2022
>
Contracts
>
Capital Contract
>
Brink Electrical Inc. 7/19/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2023 2:29:32 PM
Creation date
7/21/2022 11:58:20 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Brink Electrical Inc.
Approval Date
7/19/2022
Council Approval Date
5/25/2022
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Inductive Charging Infrastructure for Transit
Tracking Number
0003429
Total Compensation
$498,000.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Brink Electric, LLC 11/6/2023 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Brink Electrical Inc. 2/9/2023 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Brink Electrical Inc. 2/9/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Brink Electrical Inc. 2/9/2023 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
380
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 01 26 00 - 1 <br /> Inductive Charging Infrastructure for Everett Transit <br /> SECTION 01 26 00 - CONTRACT MODIFICATION PROCEDURES <br /> PART 1 -GENERAL <br /> 1.1 SUMMARY OF MODIFICATIONS PROCEDURES <br /> A. Changes to the Work may be required due to field conditions, requests made by the <br /> Owner, clarifications to the bid documents, or other needs that result in a change in the <br /> cost of the work and/or change in the number of contract days per 00 72 00-6. The <br /> 11 changes to the work will be tracked individually as Request for Change Proposals <br /> (RFCP.). Request for Change Proposals may either be prepared as a Field Directive, or <br /> as a request for pricing prior to proceeding with the work. <br /> B. A change order will be issued for one or more RFCP's grouped into a single change <br /> order. Payment for changed work cannot be paid until the change order is finalized, and <br /> ' approved as outlined per 00 72 00-6. <br /> C. The Request for Change Proposal shall clearly identify all labor, material, equipment, <br /> incidentals, including subcontractor's and supplier's invoices or quotes and Contractor's <br /> timecards. A reference from the latest approved schedule shall be attached justifying any <br /> time extension request. Mark ups for all overhead, profit, bond cost, B & 0 taxes, and <br /> insurance shall be added per 00 72 00. The form included at the end of this sectionwill <br /> be used for directing the work to be done in one of the two manners described below. <br /> D. Contractor, and Subcontractors where required, shall provide a breakdown of labor costs <br /> including basic wage rates, fringe benefits, FICA, FUTA and SUCA add-ons, per 00 72 <br /> 00 9.6. Where premium time is involved, the Contractor shall provide a breakdown of <br /> costs in the same detail. <br /> 1.2 FIELD DIRECTIVE MODIFICATION PROPOSALS <br /> A. Changed conditions and/or unanticipated circumstances may require immediate <br /> revisions to Work which are essential and from which a delay would result in a time and <br /> or cost penalty to the project. When such a condition exists, the Owner shall issue a <br /> written Field Directive to the Contractor. <br /> 1 B. The Owner will provide direction for the Contractor identifying the necessary changes to <br /> be made. The Field Directive shall be identified with a Request for Change number. The <br /> Contractor will provide pricing per 1.01 C of this section within 15 days of the completion <br /> of the work. <br /> 1.3 LUMP SUM MODIFICATION PROPOSALS <br /> A. The Owner may request priced proposals which either add or delete work prior to <br /> proceeding with any changes. <br /> 01 26 00 - 1 CONTRACT MODIFICATION PROCEDURES <br />