My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Brink Electrical Inc. 7/19/2022
>
Contracts
>
Capital Contract
>
Brink Electrical Inc. 7/19/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2023 2:29:32 PM
Creation date
7/21/2022 11:58:20 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Brink Electrical Inc.
Approval Date
7/19/2022
Council Approval Date
5/25/2022
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Inductive Charging Infrastructure for Transit
Tracking Number
0003429
Total Compensation
$498,000.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Brink Electric, LLC 11/6/2023 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Brink Electrical Inc. 2/9/2023 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Brink Electrical Inc. 2/9/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Brink Electrical Inc. 2/9/2023 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
380
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> City of Everett 01 30 00 - 2 <br /> Inductive Charging Infrastructure for Everett Transit <br /> 1.3 SUBMITTAL DEFINITIONS <br /> A. Shop Drawings: Drawings, Product Data and Samples required by individual i <br /> Specification sections for permanent incorporation in the work. <br /> B. Working Drawings: The Contractor's Plan for temporary equipment or structures <br /> such as decking, temporary bulkheads, support of excavation, support of utilities, <br /> ground water control, and forming and falsework; and, for such other work as <br /> may be required for construction but which does not become an integral part of <br /> the completed work. <br /> C. Samples: Samples of Materials or equipment submitted to the Construction I <br /> Manager for approval prior to incorporating in the work, as required by <br /> Specification sections. <br /> D. Certification: Certificates or certified test results submitted by the Contractor <br /> which demonstrate proof of compliance with the Specifications for products, <br /> Materials, equipment, systems, and qualifications of personnel, manufacturers, <br /> fabricators, and installers. <br /> E. Documentation: Documents required to be submitted by the Specifications 1 <br /> including test reports, calculations and miscellaneous items such as delivery <br /> tickets, batch tickets, and Bills of Material. <br /> F. Operations and Maintenance Manuals: Operations and maintenance manuals for 1 <br /> equipment and systems as described in Section 01 73 23 of these Specifications. <br /> G. Record Documents: Documents as described in Section 01 78 39 Project <br /> Record Documents. <br /> H. Overstock Items: Those items identified in Special Provision 07, which are to be <br /> purchased as a part of this Contract by the Contractor and delivered to the <br /> Owner. I <br /> 1.4 QUALITY ASSURANCE/CONTROL <br /> Shop Drawings and record documents shall be prepared to a high standard of quality, such as I <br /> that set forth in DOD-STD-100, ANSI Y14 Series or other approved lower tier Specifications <br /> defining equal drafting. <br /> 1.5 CHANGES <br /> Changes in the Master-List of Submittals and the approved submittals shall not be permitted I <br /> unless those changes have been accepted and approved, in writing, by the Construction <br /> Manager. <br /> 01 30 00 - 2 SUBMITTALS I <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.