My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Brink Electrical Inc. 7/19/2022
>
Contracts
>
Capital Contract
>
Brink Electrical Inc. 7/19/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2023 2:29:32 PM
Creation date
7/21/2022 11:58:20 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Brink Electrical Inc.
Approval Date
7/19/2022
Council Approval Date
5/25/2022
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Inductive Charging Infrastructure for Transit
Tracking Number
0003429
Total Compensation
$498,000.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Brink Electric, LLC 11/6/2023 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Brink Electrical Inc. 2/9/2023 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Brink Electrical Inc. 2/9/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Brink Electrical Inc. 2/9/2023 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
380
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ICity of Everett 00 7200 - <br /> Inductive Charging Infrastructure for Everett Transit <br /> I <br /> 8.3. Quality 27 <br /> 8.4. Material and Equipment Specified by Name 27 <br /> 8.5. Requests for Substitution 27 <br /> 1 <br /> 8.6. Demonstration of Compliance with Contract Requirements 27 <br /> 8.6.1. Inspection 27 <br /> 8.6.2. Samples of Materials 28 <br /> 1 <br /> 8.6.3. Certification 28 <br /> 8.6.4. Inspection at Point of Manufacturing 28 <br /> 8.6.5. Testing and Commissioning of Completed Work 28 <br /> I8.6.6. Storage of Materials and Equipment 28 <br /> 8.6.7. Manufacturer's Directions 29 <br /> I <br /> 8.7. Defective Work 29 <br /> 8.7.1. Correction of Defective Work 29 <br /> 8.7.2. Retention of Defective Work 29 <br /> ' 8.8. Materials and Equipment Furnished by Owner 29 <br /> 8.9. Guarantee 29 <br /> 8.10. Correction Period 30 <br /> I <br /> 9. MEASUREMENT AND PAYMENT 31 <br /> 9.1. Payments to Contractor 31 <br /> 9.1.1. Schedule of Values 31 <br /> I9.1.2. Progress Payments 31 <br /> 9.1.2.1 Payment Request Procedures. 31 <br /> 9.1.2.2 Review Procedures: 31 <br /> I9.1.2.3 Retained Percentage 32 <br /> 9.1.2.4 Withholding 32 <br /> I <br /> 9.1.3. Final Payment 32 <br /> 9.2. Payment for Changes 33 <br /> 9.2.1. Changes in Estimated Quantities of Unit Price Work 33 <br /> I 9.2.1.1. Increased Quantities 33 <br /> 9.2.1.2. Decreased Quantities 34 <br /> 9.2.1.3. Limitations 34 <br /> I <br /> 9.2.2. Changes in Work Not Covered By Unit Prices 34 <br /> 9.2.3. Deleted Work 34 <br /> 9.3. Charges to Contractor 35 <br /> I <br /> 9.4. Compensation to Owner for Time Extension 35 <br /> 9.5. Adjustment of Contract Sum 35 <br /> 9.5.1 Calculation 35 <br /> I 9.5.2 Limitations 36 <br /> 9.5.3 Unabsorbed and Extended Overhead 36 <br /> 9.6. Force Account 37 <br /> I <br /> 9.6.1 Labor 37 <br /> ' 9.6.2. Materials 38 <br /> 9.6.3. Equipment 38 <br /> 9.6.4. For Services. 39 <br /> I <br /> 9.6.5. For Mobilization 39 <br /> 00 7200 GENERAL CONDITIONS <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.