My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Brink Electrical Inc. 7/19/2022
>
Contracts
>
Capital Contract
>
Brink Electrical Inc. 7/19/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2023 2:29:32 PM
Creation date
7/21/2022 11:58:20 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Brink Electrical Inc.
Approval Date
7/19/2022
Council Approval Date
5/25/2022
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Inductive Charging Infrastructure for Transit
Tracking Number
0003429
Total Compensation
$498,000.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Brink Electric, LLC 11/6/2023 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Brink Electrical Inc. 2/9/2023 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Brink Electrical Inc. 2/9/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Brink Electrical Inc. 2/9/2023 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
380
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 00 7200 - I <br /> Inductive Charging Infrastructure for Everett Transit <br /> 4.5.3 Meetings with Owner 15 I <br /> 4.5.4. Cooperation with Others 15 <br /> 5. PROGRESS AND COMPLETION 16 <br /> 5.1. Notice to Proceed 16 <br /> 5.2. Contract Time 16 <br /> 5.2.1. General 16 I <br /> 5.2.2. Construction Schedule 16 <br /> 5.2.2.1 General 16 <br /> 5.2.2.2 Extensions of Contract Time 17 <br /> 5.2.3. Construction Progress 18 <br /> 5.2.4. Delays 18 <br /> 5.2.4.1 General 18 , <br /> 5.2.4.2 Bonuses 18 <br /> 5.3. Suspension Procedures 18 <br /> 5.4. Termination Procedures 19 I <br /> 5.4.1. Termination by Owner for Default 19 <br /> 5.4.2. Termination for Convenience 20 <br /> 5.4.3. Termination by Contractor after Suspension 20 <br /> 5.4.4. Contractor Obligations upon Termination 20 <br /> 5.4.5. Ownership of Materials upon Termination 21 <br /> 5.4.6. Opportunity to Cure 21III <br /> 5.4.7 Waiver of Remedies for Any Breach 21 <br /> 5.5. Possession and Use of Completed Portions of the Work 21 <br /> 5.6. Possession of Incomplete Portions of the Project 21 <br /> 5.7. Substantial Completion 21 <br /> 5.8. Acceptance of Work 22 I <br /> 6. CHANGES 22 <br /> 6.1 Owner's Right to Direct Changes to the Work 22 <br /> 6.2 Extra Work 23 <br /> 6.3 Change Orders 23 <br /> 6.4 Value Engineering and Cost Sharing 23 <br /> 7. LABOR STANDARDS 24 I <br /> 7.1. Wages of Employees 24 <br /> 7.1.1. General 24 <br /> 7.1.2. Contractor's Responsibility 24 <br /> 7.1.3. Federal Labor Requirements 24 <br /> 7.2. Payment Certificates 24 <br /> 7.3. Hours of Labor 25 <br /> 7.4. Contract Work Hours 25 <br /> 7.5. Overtime Work 26 <br /> 7.6 Labor Relations 26 <br /> 8. MATERIAL,EQUIPMENT,WORKMANSHIP AND CONSTRUCTION UTILITIES 26 I <br /> 8.1. General 26 <br /> 8.2. Product Data a 7 <br /> 00 7200 - GENERAL CONDITIONS <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.