My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5001 23RD AVE W Geotech Report 2022-10-25
>
Address Records
>
23RD AVE W
>
5001
>
Geotech Report
>
5001 23RD AVE W Geotech Report 2022-10-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 2:07:48 PM
Creation date
7/21/2022 1:28:33 PM
Metadata
Fields
Template:
Address Document
Street Name
23RD AVE W
Street Number
5001
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• For a detailed LPILE analysis, we should be contacted to provide specific input soil <br /> parameters or to review input parameters and to participate in the pile design along with <br /> project structural engineers, as deemed necessary. <br /> • All helical piers must be installed in strict accordance with manufacturer's recommendations <br /> and general industry standards. AGS representative must continuously inspect anchor <br /> installation to assure that all design requirements are met. <br /> • Provided all our design and installation recommendations are followed, and all the drainage <br /> recommendations given in the original geotechnical report are followed, we estimate total <br /> movement or heave for foundations designed and constructed as discussed in this section <br /> will be 1.00 inches or less,with differential movements on the order of one-half to three-fourths <br /> of the total settlement. If the estimated differential movement is not tolerable for the lightly <br /> loaded structures, then we should be contacted to provide specific site modification <br /> recommendations. <br /> • It should be noted that structural engineering or foundation design of any kind was beyond <br /> our scope of services. The project structural engineer should design the foundation mitigation <br /> measures, including axial and lateral stability, based on the recommendations given in this <br /> report. <br /> • The project specifications should allow for modifications by geotechnical engineer during the <br /> pier installation. <br /> • The contractor should mobilize proper equipment so that pier installation in inaccessible <br /> areas, in unanticipated hard or very dense or cobbly materials can be achieved to required <br /> depths. The contractor should carefully review this report to account for all possibilities and <br /> extras in their bid to avoid high cost overruns. <br /> LIMITATIONS <br /> Historically, with construction in areas such as the site vicinity, there is an inherent risk associated <br /> with ground movement and/or settlements and related structural damage due to poor design, an <br /> earthquake, potential soil creep due to excessive moisture, or otherwise. The owner is completely <br /> responsible for taking all risks associated with any future potential for instability at the site or in <br /> the site vicinity, unless a detailed geotechnical evaluation is performed with a lot more exploration <br /> and comprehensive assessment of the close proximity of bay to the site. It should be noted that <br /> the detailed evaluation of the impact of flooding or adjacent bay, or slopes in the site vicinity area <br /> was beyond our scope of services. Since this report and recommendations contained herein <br /> S, ` Project No: 0314-WA19 <br /> I..� August 07,2019 <br /> Page No: 10-of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.