Laserfiche WebLink
• All Materials: Hot dip galvanized conforming to ASTM A153 and manufacturers specifications <br /> for materials. For example, refer to Bulletin 01-9601 if Chance anchors are used. <br /> • All helical piles should be designed for adequate lateral stability by the project structural <br /> engineer. Unless the owner is willing to assume the risk for potential soil creep (extremely <br /> slow possible lateral soil movement due to excessive rains or unusual moisture conditions), it <br /> may also be necessary to design the pier foundation for lateral loads from possible soil creep <br /> in upper 4-6 feet due to the presence of loose soils and site topography. <br /> • All axially loaded piers should have a minimum center-to-center spacing of at least three pier <br /> diameters (3D). All laterally loaded piers should have a minimum center-to-center spacing of <br /> at least six pier diameters (6D) in the direction parallel to pier loading, and 2.5 diameters <br /> (2.5D) in the direction perpendicular to pier loading. Piers placed closer than these values <br /> should be designed using the appropriate reduction factors to account for group action. For <br /> the final design, the exact geometry of the pier group should be submitted to us for review and <br /> approval so that appropriate modifications can be made to our recommendations. <br /> • Adequate lateral anchoring or A-framing must be provided for assuring adequate lateral <br /> stability as per the structural design. We recommend at least 5 feet of lateral loading due to <br /> possible soil movement or soil creep. At your request, we can review and approve the lateral <br /> stability analysis performed by others. <br /> • Assuming that the pier length to diameter ratio (UD)will be greater than 7, in our opinion, the <br /> Matlock and Reese method of analysis can be used for lateral load analyses. Therefore, the <br /> lateral soil-structure interaction of single shafts may be analyzed using the software <br /> application, LPILE developed by Ensoft, Inc (or equivalent such as COM624). This analysis <br /> procedure estimates the lateral load-displacement behavior based on elastic beam-column <br /> theory and soil reaction-displacement (p-y) curves. Deflection, bending moment and shear <br /> profiles at specified intervals along the length of the shaft are computed. <br /> • Resistance to lateral load in upper 5 feet should be neglected. <br /> • As noted earlier, all laterally loaded piers should have a minimum center-to-center spacing of <br /> at least six pier diameters (6D) in the direction parallel to pier loading, and 2.5 diameters <br /> (2.5D) in the direction perpendicular to pier loading. Piers placed closer than these values <br /> should be designed using the appropriate reduction factors to account for group action. For <br /> the final design, the exact geometry of the pier group should be submitted to us for review and <br /> approval so that appropriate modifications can be made to our recommendations.Total lateral <br /> load versus deflection graph for the pier group can be developed by adding the lateral load <br /> resistance of piers at selected deflections. <br /> \ '3Project No: 0314-WA19 <br /> August 07,2019 <br /> Page No:9-ef42 <br />