My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022/07/27 Council Agenda Packet
>
Council Agenda Packets
>
2022
>
2022/07/27 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2023 4:17:39 PM
Creation date
7/27/2022 3:59:04 PM
Metadata
Fields
Template:
Council Agenda Packet
Date
7/27/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
`EVERETT <br />City Council Agenda Item Cover Sheet <br />Project title: Award the construction contract for the WFP Emergency Generator Replacement Project to <br />IMCO General Construction, Inc. of Ferndale, WA in the amount of $4,874,905. <br />Council Bill # <br />Agenda dates requested: <br />July 27, 2022 <br />Briefing <br />Proposed action <br />Consent 7/27/22 <br />Action <br />Ordinance <br />Public hearing <br />Yes <br />X No <br />Budget amendment: <br />Yes X No <br />PowerPoint presentation: <br />Yes X No <br />Attachments: <br />Bid Summary, Vicinity Map <br />Department(s) involved: <br />Public Works, Admin <br />Contact person: <br />Zach Brown <br />Phone number: <br />(425) 257-8872 <br />Email: <br />ZBrown@everettwa.gov <br />Initialed by: <br />2LS <br />Department head <br />Administration <br />Council President <br />Consideration: <br />Project: <br />Partner/Supplier: <br />Location: <br />Preceding action: <br />Fund: <br />Award of Construction Contract <br />WFP Emergency Generator Replacement <br />IMCO General Construction, Inc. <br />Water Filtration Plant <br />Call for Bids 6/21/22 <br />Fund 336, Program 006 <br />Fiscal summary statement: <br />The funding source for this project as established by City Ordinance 3730-20 will be <br />Fund 401 Water and Sewer Utility Fund. The programmed available funding for all <br />improvements is $10,400,000. The remaining available funding after design and early <br />owner acquired equipment is $8,438,600. <br />Project summary statement: <br />Bid proposals for the WFP Emergency Generator Replacement Project were opened on <br />June 21, 2022, with IMCO General Construction, Inc. of Ferndale, WA submitting a bid in <br />the amount of $4,874,905, including Washington State Sales Tax. <br />The Water Filtration Plant (WFP) Emergency Generator system is comprised of two <br />generators which have experienced recent failures and have reached the end of their <br />useful life. The 30+ year old generators are mismatched in size, located at opposite sides <br />of the water plant and their combined output is no longer large enough to meet the <br />demands of the plant. This project will install two new generators to be housed together <br />in a common location with a dedicated fuel storage facility. Additional work includes the <br />replacement of electrical controls and upgrades to the electrical infrastructure to ensure <br />continuous operation of the plant in the event of a loss of external power. <br />Recommendation (exact action requested of Council): <br />Award the construction contract for the Water Filter Plant Emergency Generator <br />Replacement Project to IMCO General Construction, Inc. of Ferndale, WA in the <br />amount of $4,874,905. <br />
The URL can be used to link to this page
Your browser does not support the video tag.