Laserfiche WebLink
I <br /> 1 All references to the terms "State" or"state" shall be revised to read "Contracting <br /> I 2 Agency" unless the reference is to an administrative agency of the State of Washington, <br /> 3 a State statute or regulation, or the context reasonably indicates otherwise. <br /> 4 <br /> 5 All references to "State Materials Laboratory" shall be revised to read "Contracting <br /> 6 Agency designated location". <br /> 7 <br /> I 8 All references to "final contract voucher certification" shall be interpreted to mean the <br /> 9 Contracting Agency form(s) by which final payment is authorized, and final completion <br /> 10 and acceptance granted. <br /> 11 <br /> 12 Additive <br /> 13 A supplemental unit of work or group of bid items, identified separately in the Bid <br /> 14 Proposal, which may, at the discretion of the Contracting Agency, be awarded in addition <br /> I 15 to the base bid. <br /> 16 <br /> 17 Alternate <br /> 111 18 One of two or more units of work or groups of bid items, identified separately in the Bid <br /> 19 Proposal, from which the Contracting Agency may make a choice between different <br /> 20 methods or material of construction for performing the same work. <br /> I 21 <br /> 22 Business Day <br /> 23 A business day is any day from Monday through Friday except holidays as listed in <br /> 24 Section 1-08.5. <br /> 1 25 <br /> 26 Contract Bond <br /> 27 The definition in the Standard Specifications for"Contract Bond" applies to whatever <br /> I 28 bond form(s) are required by the Contract Documents, which may be a combination of a <br /> 29 Payment Bond and a Performance Bond. <br /> 30 <br /> I 31 32 Contract Documents <br /> See definition for"Contract". <br /> 33 <br /> I 34 Contract Time <br /> 35 The period of time established by the terms and conditions of the Contract within which <br /> 36 the Work must be physically completed. <br /> 37 <br /> I38 Notice of Award <br /> 39 The written notice from the Contracting Agency to the successful Bidder signifying the <br /> 40 Contracting Agency's acceptance of the Bid Proposal. <br /> 1 41 <br /> 42 Notice to Proceed <br /> 43 The written notice from the Contracting Agency or Engineer to the Contractor authorizing <br /> I 44 and directing the Contractor to proceed with the Work and establishing the date on which <br /> 45 the Contract time begins. <br /> 46 <br /> I 47 Traffic <br /> 48 Both vehicular and non-vehicular traffic, such as pedestrians, bicyclists, wheelchairs, and <br /> 49 equestrian traffic. <br /> 1 50 <br /> INTERURBAN TRAIL TO YMCA PEDESTRIAN IMPROVEMENTS SPECIAL PROVISIONS <br /> IWORK ORDER 3749 Page SP3 of SP68 MAY 2,2022 <br /> I <br />