My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Always Active Services LLC of Seattle 7/21/2022
>
Contracts
>
Capital Contract
>
Always Active Services LLC of Seattle 7/21/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2022 9:44:31 AM
Creation date
7/29/2022 9:35:53 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Always Active Services LLC of Seattle
Approval Date
7/21/2022
Council Approval Date
6/15/2022
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
Interurban Trail to YMCA Pedestrian Impvts
Public Works WO Number
UP3749
Tracking Number
0003441
Total Compensation
$332,142.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 m. The Bid Proposal does not constitute a definite and unqualified offer to meet <br /> 2 the material terms of the Bid invitation; or 1 <br /> 3 n. More than one Proposal is submitted for the same project from a Bidder <br /> 4 under the same or different names. <br /> 5 <br /> 6 2. A Proposal may be considered irregular and may be rejected if: <br /> 7 a. The Proposal does not include a unit price for every Bid item; <br /> 8 b. Any of the unit prices are excessively unbalanced (either above or below the <br /> 9 amount of a reasonable Bid) to the potential detriment of the Contracting <br /> 10 Agency; <br /> 11 c. Receipt of Addenda is not acknowledged; <br /> 12 d. A member of a joint venture or partnership and the joint venture or <br /> 13 partnership submit Proposals for the same project (in such an instance, both <br /> 14 Bids may be rejected); or <br /> 15 e. If Proposal form entries are not made in ink. 1 <br /> 16 <br /> 17 1-02.14.Option.A.RTF <br /> 18 1-02.14 Disqualification of Bidders <br /> 19 (May 17, 2018 APWA GSP, Option A) I <br /> 20 <br /> 21 Delete this section and replace it with the following: <br /> 22 <br /> 23 A Bidder will be deemed not responsible if the Bidder does not meet the mandatory bidder <br /> 24 responsibility criteria in RCW 39.04.350(1), as amended. <br /> 25 <br /> 26 The Contracting Agency will verify that the Bidder meets the mandatory bidder <br /> 27 responsibility criteria in RCW 39.04.350(1). To assess bidder responsibility, the <br /> 28 Contracting Agency reserves the right to request documentation as needed from the I <br /> 29 Bidder and third parties concerning the Bidder's compliance with the mandatory bidder <br /> 30 responsibility criteria. <br /> 31 <br /> 32 If the Contracting Agency determines the Bidder does not meet the mandatory bidder <br /> 33 responsibility criteria in RCW 39.04.350(1) and is therefore not a responsible Bidder, the <br /> 34 Contracting Agency shall notify the Bidder in writing, with the reasons for its determination. <br /> 35 If the Bidder disagrees with this determination, it may appeal the determination within two I <br /> 36 (2) business days of the Contracting Agency's determination by presenting its appeal and <br /> 37 any additional information to the Contracting Agency. The Contracting Agency will <br /> 38 consider the appeal and any additional information before issuing its final determination. <br /> 39 If the final determination affirms that the Bidder is not responsible, the Contracting Agency <br /> 40 will not execute a contract with any other Bidder until at least two business days after the <br /> 41 Bidder determined to be not responsible has received the Contracting Agency's final <br /> 42 determination. <br /> 43 <br /> 44 1-02.15.RTF <br /> 45 1-02.15 Pre Award Information <br /> 46 (August 14, 2013 APWA GSP) <br /> 47 <br /> 48 Revise this section to read: <br /> 49 <br /> I <br /> INTERURBAN TRAIL TO YMCA PEDESTRIAN IMPROVEMENTS SPECIAL PROVISIONS <br /> WORK ORDER 3749 Page SP8 of SP68 MAY 2,2022 <br /> II <br />
The URL can be used to link to this page
Your browser does not support the video tag.