My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Always Active Services LLC of Seattle 7/21/2022
>
Contracts
>
Capital Contract
>
Always Active Services LLC of Seattle 7/21/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2022 9:44:31 AM
Creation date
7/29/2022 9:35:53 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Always Active Services LLC of Seattle
Approval Date
7/21/2022
Council Approval Date
6/15/2022
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
Interurban Trail to YMCA Pedestrian Impvts
Public Works WO Number
UP3749
Tracking Number
0003441
Total Compensation
$332,142.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 Before awarding any contract, the Contracting Agency may require one or more of these <br /> I 2 items or actions of the apparent lowest responsible bidder: <br /> 3 1. A complete statement of the origin, composition, and manufacture of any or all <br /> 4 materials to be used, <br /> I 5 2. Samples of these materials for quality and fitness tests, <br /> 6 3. A progress schedule (in a form the Contracting Agency requires) showing the order <br /> 7 of and time required for the various phases of the work, <br /> 8 4. A breakdown of costs assigned to any bid item, <br /> 9 5. Attendance at a conference with the Engineer or representatives of the Engineer, <br /> 10 6. Obtain, and furnish a copy of, a business license to do business in the city or county <br /> 11 where the work is located. <br /> 12 7. Any other information or action taken that is deemed necessary to ensure that the <br /> 13 bidder is the lowest responsible bidder. <br /> I 14 <br /> 15 <br /> 16 1-03.1(1).RTF <br /> I 17 1-03.1(1) Identical Bid Totals <br /> 18 (January 4, 2016 APWA GSP) <br /> 19 <br /> 20 Revise this section to read: <br /> 21 <br /> 22 After opening Bids, if two or more lowest responsive Bid totals are exactly equal, then <br /> 23 the tie-breaker will be the Bidder with an equal lowest bid, that proposed to use the <br /> I 24 highest percentage of recycled materials in the Proiect, per the form submitted with the <br /> 25 Bid Proposal. If those percentages are also exactly equal, then the tie-breaker will be <br /> 26 determined by drawing as follows: Two or more slips of paper will be marked as follows: <br /> 27 one marked "Winner" and the other(s) marked "unsuccessful". The slips will be folded to <br /> 28 make the marking unseen. The slips will be placed inside a box. One authorized <br /> 29 representative of each Bidder shall draw a slip from the box. Bidders shall draw in <br /> I <br /> 30 31 alphabetic order by the name of the firm as registered with the Washington State <br /> Department of Licensing. The slips shall be unfolded and the firm with the slip marked <br /> 32 "Winner" will be determined to be the successful Bidder and eligible for Award of the <br /> I 33 Contract. Only those Bidders who submitted a Bid total that is exactly equal to the lowest <br /> 34 responsive Bid, and with a proposed recycled m aterials percentage that is exactly equal <br /> 35 to the highest proposed recycled materials amount, are eligible to draw. <br /> 36 I <br /> 37 COE 1-03.3.rtf <br /> 38 1-03.3 Execution of Contract <br /> 39 (October 1, 2005 APWA GSP) <br /> I 40 <br /> 41 Revise this section to read: <br /> 42 <br /> I 43 Copies of the Contract Provisions, including the unsigned Form of Contract, will be <br /> 44 available for signature by the successful bidder on the first business day following award. <br /> 45 The number of copies to be executed by the Contractor will be determined by the <br /> I 46 Contracting Agency. <br /> 47 <br /> 48 Within 20 calendar days after the award date, the successful bidder shall return <br /> 49 the signed Contracting Agency-prepared contract, an insurance certification as required <br /> 111 <br /> INTERURBAN TRAIL TO YMCA PEDESTRIAN IMPROVEMENTS SPECIAL PROVISIONS <br /> IWORK ORDER 3749 Page SP9 of SP68 MAY 2,2022 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.