Laserfiche WebLink
I <br /> 1 by Section 1-07.18, and a satisfactory bond as required by law and Section 1-03.4. <br /> 2 Before execution of the contract by the Contracting Agency, the successful bidder shall <br /> 3 provide any pre-award information the Contracting Agency may require under Section 1- <br /> 4 02.15. <br /> 5 <br /> 6 Until the Contracting Agency executes a contract, no proposal shall bind the Contracting <br /> 7 Agency nor shall any work begin within the project limits or within Contracting Agency- <br /> 8 furnished sites. The Contractor shall bear all risks for any work begun outside such areas 1 <br /> 9 and for any materials ordered before the contract is executed by the Contracting Agency. <br /> 10 <br /> 11 If the bidder experiences circumstances beyond their control that prevents return of the <br /> 12 contract documents within the calendar days after the award date stated above, the <br /> 13 Contracting Agency may grant up to a maximum of 20 additional calendar days <br /> 14 for return of the documents, provided the Contracting Agency deems the circumstances <br /> 15 warrant it. <br /> 16 <br /> 17 <br /> 18 1-03.7.RTF <br /> 19 1-03.7 Judicial Review <br /> 20 (November 30, 2018 APWA GSP) <br /> 21 <br /> 22 Revise this section to read: <br /> 23 <br /> 24 Any decision made by the Contracting Agency regarding the Award and execution of the <br /> 25 Contract or Bid rejection shall be conclusive subject to the scope of judicial review I <br /> 26 permitted under Washington Law. Such review, if any, shall be timely filed in the Superior <br /> 27 Court of the county where the Contracting Agency headquarters is located, provided that <br /> 28 where an action is asserted against a county, RCW 36.01.050 shall control venue and I <br /> 29 jurisdiction. <br /> 30 <br /> 31 1-04.2.RTF <br /> 32 1-04.2 Coordination of Contract Documents, Plans, Special Provisions, I <br /> 33 Specifications, and Addenda <br /> 34 (December 10, 2020 APWA GSP) <br /> 35 <br /> 36 Revise the second paragraph to read: <br /> 37 <br /> 38 Any inconsistency in the parts of the contract shall be resolved by following this order of <br /> 39 precedence (e.g., 1 presiding over 2, 2 over 3, 3 over 4, and so forth): <br /> 40 1. Addenda, <br /> 41 2. Proposal Form, I <br /> 42 3. Special Provisions, <br /> 43 4. Contract Plans, <br /> 44 5. Standard Specifications, I <br /> 45 6. Contracting Agency's Standard Plans or Details (if any), and <br /> 46 7. WSDOT Standard Plans for Road, Bridge, and Municipal Construction. <br /> 47 <br /> 111 <br /> INTERURBAN TRAIL TO YMCA PEDESTRIAN IMPROVEMENTS SPECIAL PROVISIONS <br /> WORK ORDER 3749 Page SP10 of SP68 MAY 2,2022 I <br /> I <br />