I <br /> 1 equipment to be tested during this period shall be tested under the observation of the <br /> I <br /> 2 3 Engineer, so that the Engineer may determine their suitability for the purpose for which <br /> they were installed. The Physical Completion Date cannot be established until testing <br /> 4 and corrections have been completed to the satisfaction of the Engineer. <br /> I 5 <br /> 6 The costs for power, gas, labor, material, supplies, and everything else needed to <br /> 7 successfully complete operational testing, shall be included in the unit contract prices <br /> 8 related to the system being tested, unless specifically set forth otherwise in the proposal. <br /> 9 <br /> 10 Operational and test periods, when required by the Engineer, shall not affect a <br /> 11 manufacturer's guaranties or warranties furnished under the terms of the contract. <br /> i <br /> 12 <br /> 13 <br /> 14 1-05.15.RTF <br /> I <br /> 15 1-05.15 Method of Serving Notices <br /> 16 (March 25, 2009 APWA GSP) <br /> ' 17 Revise the second paragraph to read: <br /> 18 <br /> 19 All correspondence from the Contractor shall be directed to the Project Engineer. All <br /> 20 correspondence from the Contractor constituting any notification, notice of protest, notice <br /> 21 of dispute, or other correspondence constituting notification required to be furnished <br /> 22 under the Contract, must be in paper format, hand delivered or sent via mail delivery <br /> 23 service to the Project Engineer's office. Electronic copies such as e-mails or <br /> 24 electronically delivered copies of correspondence will not constitute such notice and will <br /> 25 not comply with the requirements of the Contract. <br /> 26 <br /> I 27 1-05.16.RTF <br /> 28 Add the following new section: <br /> 29 <br /> 30 1-05.16 Water and Power <br /> I31 (October 1, 2005 APWA GSP) <br /> 32 <br /> 33 The Contractor shall make necessary arrangements, and shall bear the costs for power <br /> I 34 and water necessary for the performance of the work, unless the contract includes power <br /> 35 and water as a pay item. <br /> 36 <br /> I 37 f1-05.18.FR1.docx <br /> 38 Add the following new section: <br /> 39 <br /> I <br /> 40 41 1-05.18 Record Drawings <br /> (March 8, 2013 APWA GSP) <br /> 42 <br /> 43 The Contractor shall maintain one set of full size plans for Record Drawings, updated <br /> I44 with clear and accurate red-lined field revisions on a daily basis, and within 2 business <br /> 45 days after receipt of information that a change in Work has occurred. The Contractor <br /> 46 shall not conceal any work until the required information is recorded. <br /> I <br /> 47 <br /> 48 This Record Drawing set shall be used for this purpose alone, shall be kept separate <br /> 49 from other Plan sheets, and shall be clearly marked as Record Drawings. These Record <br /> 1 50 Drawings shall be kept on site at the Contractor's field office, and shall be available for <br /> INTERURBAN TRAIL TO YMCA PEDESTRIAN IMPROVEMENTS SPECIAL PROVISIONS <br /> i <br /> WORK ORDER 3749 Page SP17 of SP68 MAY 2,2022 <br />