Laserfiche WebLink
I <br /> I 2 <br /> 3 DIVISION2.GR2 <br /> 4 Division 2 <br /> I5 6 Earthwork <br /> 7 2-01.GR2 <br /> I 8 Clearing, Grubbing, and Roadside Cleanup <br /> 9 <br /> 10 2-01.1.INST1.GR2 <br /> 11 Section 2-01.1 is supplemented with the following: <br /> I 12 <br /> 13 f2-01.1.OPT1.FR2.docx <br /> 14 (March 13, 1995) <br /> I 15 Clearing and grubbing on this project shall be performed within the following limits: <br /> 16 <br /> 17 *** Limit between STA 11+00 and STA 15+00, less than ten (10) feet from existing <br /> I 18 edge line, as shown on the plans and contained within the high-visibility silt fence <br /> 19 location.To include existing evergreen tree, approximately 15-inch diameter at breast <br /> 20 height (DBH), at STA 11+60, 17' LT. 't** <br /> 21 <br /> I 22 2-01.5.GR2 <br /> 23 Payment <br /> 24 <br /> I 25 2-01.5.INST1.GR2 <br /> 26 The first and second paragraphs of Section 2-01.5 are revised to read: <br /> 27 <br /> 28 f2-01.5.OPT1.FR2.docx <br /> I29 (August 7, 2017) <br /> 30 Payment will be made for the following bid items when they are included in the proposal: <br /> 31 <br /> I 32 "Clearing and Grubbing", lump sum. <br /> 33 <br /> 34 The unit Contract price per lump sum for the "Clearing and Grubbing" shall be full <br /> II35 36 pay for all Work described in this section except "Roadside Cleanup". <br /> 37 2-02.3(3).GR2 <br /> I38 39 Removal of Pavement, Sidewalks, Curbs, and Gutters <br /> 40 COE 2-02.3(4).docx <br /> I 41 (******) <br /> 42 <br /> 43 Section 2-02.3 is supplemented with the following: <br /> 1 44 <br /> 45 2-02.3(4) Saw-cutting <br /> 46 (City of Everett, May 21, 2018) <br /> 1 47 <br /> 48 Curb, gutter, sidewalk shall be saw cut full height and width. <br /> 49 <br /> I50 Asphalt shall be saw cut full depth. <br /> INTERURBAN TRAIL TO YMCA PEDESTRIAN IMPROVEMENTS SPECIAL PROVISIONS <br /> IWORK ORDER 3749 Page SP41 of SP68 MAY 2,2022 <br /> I <br />