My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Always Active Services LLC of Seattle 7/21/2022
>
Contracts
>
Capital Contract
>
Always Active Services LLC of Seattle 7/21/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2022 9:44:31 AM
Creation date
7/29/2022 9:35:53 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Always Active Services LLC of Seattle
Approval Date
7/21/2022
Council Approval Date
6/15/2022
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
Interurban Trail to YMCA Pedestrian Impvts
Public Works WO Number
UP3749
Tracking Number
0003441
Total Compensation
$332,142.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 2 When the drawings indicate or the Engineer requires sawcutting pavement I <br /> 3 which comprises of rigid base and asphalt overlay, the minimum saw cut-depth <br /> 4 for the rigid base shall be full depth. <br /> 5 I 6 For rigid base constructed with mortared decorative or special pavement (e.g., <br /> 7 brick, cobblestone, paver block, etc.) or any combination of such materials the <br /> 8 depth shall be full thickness of the rigid base along a neat line with intent to <br /> 9 salvage as many special pavement units as possible. <br /> 10 <br /> 11 <br /> 12 GSL 2-02 SAWCUT.docx I <br /> 13 2-02.5 Payment <br /> 14 <br /> 15 Section 2-02.5 is supplemented with the following: <br /> 16 <br /> 17 (******) <br /> 18 ' <br /> 19 "Sawcut", per linear foot. <br /> 20 <br /> 21 Saw-cutting shall be performed in accordance with Sections 2-02.3(3). <br /> 22 <br /> 23 Measurement for saw-cutting will be per linear foot along the true length of the surface <br /> 24 cut. <br /> 25 <br /> 26 The unit price per linear foot for the final saw-cutting of asphalt concrete and cement <br /> 27 concrete pavement shall be full pay for all labor, materials, tools, and equipment I <br /> 28 necessary to satisfactorily complete the Work as specified in Section 2-02.3(3) of the <br /> 29 Standard Specifications and disposal of cuttings slurry, including vacuum collection. <br /> 31 <br /> 3 <br /> 32 COE 2-03.4 EARTHWORK.docx <br /> 33 (******) 1 <br /> 34 2-03.4 Measurement <br /> 35 Section 2-03.4 is supplemented with the following: <br /> 36 (City of Everett, September 10, 2013) <br /> 37 *** <br /> 38 <br /> 39 Only one determination of the original ground elevation will be made on this project. <br /> 40 Measurement for roadway excavation and embankment will be based on the original <br /> 41 ground elevations recorded previous to the award of this contract and, the alignment, <br /> 42 profile grade, and roadway section as shown in the plans or as staked by the Engineer. <br /> 43 <br /> 44 If discrepancies are discovered in the ground elevations which will materially affect the <br /> 45 quantities of earthwork, the original computations of earthwork quantities will be adjusted <br /> 46 accordingly. <br /> 47 <br /> i <br /> INTERURBAN TRAIL TO YMCA PEDESTRIAN IMPROVEMENTS SPECIAL PROVISIONS <br /> WORK ORDER 3749 Page SP42 of SP68 MAY 2,2022 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.