My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Always Active Services LLC of Seattle 7/21/2022
>
Contracts
>
Capital Contract
>
Always Active Services LLC of Seattle 7/21/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2022 9:44:31 AM
Creation date
7/29/2022 9:35:53 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Always Active Services LLC of Seattle
Approval Date
7/21/2022
Council Approval Date
6/15/2022
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
Interurban Trail to YMCA Pedestrian Impvts
Public Works WO Number
UP3749
Tracking Number
0003441
Total Compensation
$332,142.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 <br /> 2 <br /> 3 DIVISION8.GR8 <br /> 4 Division 8 <br /> 5 Miscellaneous Construction <br /> 6 <br /> 7 8-01.GR8 <br /> 8 Erosion Control and Water Pollution Control <br /> 9 <br /> 10 8-01.3.GR8 <br /> 11 Construction Requirements <br /> 12 <br /> 111 <br /> 13 COE 8-01 MULCH.RTF <br /> 14 8-01.3(2)D Mulching <br /> 15 Section 8-01.3(2)D shall be supplemented with the following: <br /> 16 <br /> 17 (******) <br /> 18 <br /> 19 Wood cellulose fiber mulch shall be specially processed wood fiber containing no growth or <br /> 20 germination inhibiting factors, and shall be dyed a suitable color to facilitate inspection of the <br /> 21 placement of the material. It shall be manufactured in such manner that after addition and <br /> 22 agitation in slurry tanks with water, the fibers in the material will become uniformly suspended <br /> 23 to form a homogeneous slurry. When hydraulically sprayed on the ground, the material shall <br /> 24 allow the absorption and percolation of moisture. <br /> 25 <br /> 26 Wood cellulose fiber shall be applied at the rate of*** 60 *** pounds per *** 1,000 *** square <br /> 27 feet. I <br /> 28 <br /> 29 GSL 8-01.5 EROSION CONTROL AND WATER POLLUTION PREVENTION.docx <br /> 30 8-01.5 Payment <br /> 31 Section 8-01.5(1) shall be supplemented with the following: <br /> 32 <br /> 33 (******) 1 <br /> 34 <br /> 35 Section 8-01.4(4) is deleted. The unit contract price per lump sum for "Erosion Control and <br /> 36 Water Pollution Prevention," shall be full pay for the project Work and shall include the cost of <br /> 37 high visibility silt fence, street cleaning, and temporary seeding and temporary mulching. <br /> 38 <br /> 39 <br /> 40 <br /> 41 COE 8-04 Curbs.docx <br /> 42 8-04 CURBS, GUTTERS, AND SPILLWAYS 1 <br /> 43 (******) <br /> 44 <br /> 45 SECTION 8-04.1 OF THE STANDARD SPECIFICATIONS IS DELETED AND REPLACED BY <br /> 46 THE FOLLOWING: <br /> INTERURBAN TRAIL TO YMCA PEDESTRIAN IMPROVEMENTS SPECIAL PROVISIONS <br /> WORK ORDER 3749 Page SP48 of SP68 MAY 2,2022 111 <br />
The URL can be used to link to this page
Your browser does not support the video tag.