Laserfiche WebLink
I <br /> 1 GSL 8-14.3(6) CURB RAMP.docx <br /> I2 8-14.3(6) CURB RAMP <br /> 3 <br /> I 4 SECTION 8-14.3(6) OF THE STANDARD SPECIFICATIONS IS NEW AND IS <br /> 5 SUPPLEMENTED WITH THE FOLLOWING: <br /> 6 <br /> I7 (******) <br /> 8 <br /> 9 Curb ramp locations will be designated on the drawings or marked in the field by the <br /> I 10 Engineer. Where curb ramps are to be constructed, the Contractor shall construct curb <br /> 11 ramp in accordance to the City of Everett Standard Drawings 318, 319, 320, 321 or <br /> 12 WSDOT Standard Plans F-40.12, F-40.14, F-40.15, F-40.16, F-45.10. <br /> I13 <br /> 14 Curb ramps shall be constructed separately from the sidewalk to produce a definite break <br /> 15 line between the ramp and the sidewalk. A 3/8 inch non-extruded through joint material <br /> I 16 shall be installed between the curb and the sidewalk with edging as specified in Section <br /> 17 8-14.3(3). <br /> 18 <br /> I 19 8-14.4 Measurement <br /> 20 <br /> 21 SECTION 8-14.4 IS SUPPLEMENTED WITH THE FOLLOWING: <br /> I 22 <br /> 23 (******) <br /> I 24 <br /> 25 <br /> 26 Type _ Curb Ramp will be measured per each for the complete curb ramp type <br /> 27 installed and includes construction of any cast-in-place detectable warning surface. <br /> I, 28 <br /> 29 This bid item does not include the adjacent Curb, Curb and Gutter, Pedestrian Curb <br /> 30 or Sidewalks. <br /> I 31 <br /> 32 Any sidewalk not acceptable in the opinion of the Engineer, because of damage, <br /> 33 defacement, or carelessness on the part of the Contractor shall be removed, <br /> I 34 replaced and paid for in accordance to Section 1-05.7 (Removal of Defective and <br /> 35 Unauthorized Work) of these provisions. <br /> 36 <br /> I 37 Placement of the CSBC under the new Cement Concrete Sidewalk shall be <br /> 38 measured and paid in accordance to Section 4-04. <br /> 39 <br /> I 40 8-14.5 Payment <br /> 41 <br /> 42 SECTION 8-14.54 IS SUPPLEMENTED WITH THE FOLLOWING: <br /> 43 <br /> I44 (******) <br /> I <br /> INTERURBAN TRAIL TO YMCA PEDESTRIAN IMPROVEMENTS SPECIAL PROVISIONS <br /> IWORK ORDER 3749 Page SP51 of SP68 MAY 2,2022 <br /> I <br />