My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Always Active Services LLC of Seattle 7/21/2022
>
Contracts
>
Capital Contract
>
Always Active Services LLC of Seattle 7/21/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2022 9:44:31 AM
Creation date
7/29/2022 9:35:53 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Always Active Services LLC of Seattle
Approval Date
7/21/2022
Council Approval Date
6/15/2022
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
Interurban Trail to YMCA Pedestrian Impvts
Public Works WO Number
UP3749
Tracking Number
0003441
Total Compensation
$332,142.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 <br /> 2 <br /> 3 "Type_Curb Ramp", per each. <br /> 4 <br /> 5 The unit Contract price per each for "Type Curb Ramp" shall be full pay for I <br /> 6 construction of the curb ramp as specified, including the cast-in-place detectable <br /> 7 warning surface. <br /> 8 <br /> 10 fCNH 8-20.2(1) EQMT&DWGS.RTF.docx <br /> 11 (******) <br /> 12 Equipment List and Drawings <br /> 13 Section 9-29.6 is supplemented with the following: <br /> 14 <br /> 15 A) Shop Drawings for Traffic Signal and Luminaire Poles: Within 20 days <br /> 16 following execution of the contract, or approval of electrical subcontractor, the <br /> 17 contractor shall submit shop drawings for the traffic signal and luminaire poles I <br /> 18 to be used on the project. Within 20 days following approval of the shop <br /> 19 drawings, the contractor shall submit a letter to the engineer certifying that <br /> 20 the poles have been ordered and certifying the manufacturer's planned 1 <br /> 21 delivery date. <br /> 22 <br /> 23 B) Equipment Submittal for Traffic Signal Equipment: Within 20 days following <br /> 24 execution of the contract, the contractor shall submit 3 copies of complete <br /> 25 catalog data for the following items: <br /> 26 <br /> 27 *** I <br /> 28 Junction Boxes <br /> 29 Junction Box Foundations <br /> 30 Synthetic Junction Box Leveling Materials <br /> 31 Accessible Pedestrian Station <br /> 32 Rectangular Rapid Flashing Beacon <br /> 33 *** <br /> 34 <br /> 35 The equipment shall be approved by the engineer in writing prior to the actual <br /> 36 ordering of the equipment. <br /> 37 <br /> 38 <br /> 39 <br /> 40 CNH 8-20.2(9-29.1) CONDUIT.RTF <br /> 41 Conduit, Innerduct, and Outerduct <br /> 42 Section 9-29.1 is supplemented with the following: <br /> 43 <br /> 44 Pull String <br /> 45 All conduit shown in the plans, proposed and existing conduit to receive conductors, <br /> 46 and conduit installed for future use, shall have flat woven polyester tape installed and <br /> 47 secured at either end of the run. Tape shall be detectable, 1/2" minimum width and <br /> 48 printed with sequential footage markings. Pull strength shall be 9001bs minimum. <br /> INTERURBAN TRAIL TO YMCA PEDESTRIAN IMPROVEMENTS SPECIAL PROVISIONS <br /> WORK ORDER 3749 Page SP52 of SP68 MAY 2,2022 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.