Laserfiche WebLink
I <br /> 1 Lamp 60M <br /> U <br /> 2 3 Color Temp 4500°K <br /> Optical System 3LB <br /> 4 Voltage 120-277V <br /> I5 6 Finish GY (Grey) <br /> 7 <br /> I <br /> 8 GSL 8-20 (9-29.21) FLASHING BEACONS.docx <br /> 9 8-20 (9-29.21) FLASHING BEACONS <br /> III <br /> 10 (******) <br /> 11 <br /> 12 Section 9-29.21 is replaced with the following: <br /> I 13 <br /> 14 Rectangular Rapid Flashing Beacons <br /> 15 <br /> 1 16 Rectangular rapid flashing beacon systems shall be installed as shown in the Plans <br /> 17 and shall provide a complete and operational rectangular rapid flashing beacon <br /> 18 system. The work shall include furnishing and installing pole and post foundations, <br /> I 19 poles and posts, mounting hardware, permanent signs, controller(s) and controller <br /> 20 enclosure(s), light bars, and pedestrian pushbuttons. <br /> 21 <br /> I 22 For Rectangular Rapid Flashing Beacons, the system shall be the following product without <br /> 23 substitution: <br /> 24 <br /> 25 Carmanah Technologies Corp. <br /> I 26 Model: SC315-G <br /> 27 Western Systems <br /> 28 1122 Industry Street, Bldg. B <br /> I 29 Everett, WA 98203 <br /> 30 Phone: (425)438-1133e <br /> 31 <br /> I32 GSL 8-20.3(18) POTHOLING.docx <br /> 33 (******) <br /> I 34 8-20.3(18) Potholing <br /> 35 <br /> 36 Section 8-20.3(2)A is new and is supplemented with the following: <br /> I 37 <br /> 38 This work consists of exposing underground utility to ascertain the precise horizontal and <br /> 39 vertical position. After the work is complete, Contractor shall backfill and compact with <br /> 40 native materials. <br /> 41 <br /> 42 Contractor shall contact"Call Before You Dig" prior to all construction activity. <br /> 43 <br /> I44 Contractor shall locate and expose buried utilities to verify location prior to sawcutting <br /> 45 and/or drilling in area of existing utilities. Contractor shall protect exposed utilities <br /> 46 throughout the duration of the project. Paved areas shall be restored with temporary <br /> I <br /> INTERURBAN TRAIL TO YMCA PEDESTRIAN IMPROVEMENTS SPECIAL PROVISIONS <br /> I <br /> WORK ORDER 3749 Page SP63 of SP68 MAY 2,2022 <br /> I <br />