My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Always Active Services LLC of Seattle 7/21/2022
>
Contracts
>
Capital Contract
>
Always Active Services LLC of Seattle 7/21/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2022 9:44:31 AM
Creation date
7/29/2022 9:35:53 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Always Active Services LLC of Seattle
Approval Date
7/21/2022
Council Approval Date
6/15/2022
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
Interurban Trail to YMCA Pedestrian Impvts
Public Works WO Number
UP3749
Tracking Number
0003441
Total Compensation
$332,142.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 pavement patch using cold mix (MC 250), ATB or steel plates. Appropriate sediment <br /> 2 controls shall be implemented to prevent pollution and erosion. I <br /> 3 <br /> 4 The Contractor is responsible for disposing of any drilling residue or remaining spoil in <br /> 5 accordance to Section 2-03.3(7)C. Contractor shall pothole existing utilities a minimum I <br /> 6 of 3 working days prior to scheduled installation of new permanent work to determine if <br /> 7 conflict exists. <br /> 8 1 <br /> 9 Potholing will be considered as incidental to the Work that is warranting it. <br /> 10 <br /> 11 fCOE 8-20.4—8-20.5 BORING AND TRAFFIC SIGNAL SYSTEM.docx <br /> 12 (******) I <br /> 13 Measurement <br /> 14 The first sentence of Section 8-20.4 is revised to read: , <br /> 15 <br /> 16 No specific unit of measurement will apply to the lump sum items for illumination system, <br /> 17 intelligent transportation system (ITS), or traffic signal systems, but measurement will be ill <br /> 18 for the sum total of all items for a complete system to be furnished and installed. <br /> 19 <br /> 20 Section 8-20.4 is supplemented with the following: <br /> 21 <br /> 22 All costs associated with the removal and installation of signs on the traffic signal poles <br /> 23 shall be included in the associated lump sum bid item for permanent signing. <br /> 24 <br /> 25 The Contract Price for "Directional Boring/Conduit Installation —Two (2) 2-Inch" shall be <br /> 26 full pay for furnishing all labor materials, tools, equipment and electrical supervision <br /> 27 associated with the directional boring of the conduit trunk system. It shall also include I <br /> 28 furnishing all conduits, couplings, placing the conduit, excavation, backfilling, all other <br /> 29 work necessary for the installation of the trunk conduit system, and all required potholing <br /> 30 to verify locations of existing utilities. All costs associated with potholing and excavation <br /> 31 required to ascertain utilities in accordance with Section 8-20.3(2)A shall be included with <br /> 32 this Work with no direct compensation made. <br /> 33 <br /> 34 All costs associated with adjusting junction boxes to grade including excavation, backfill, <br /> 35 and restoration of adjacent areas in a manner acceptable to the ENGINEER, shall be <br /> 36 included in the associated traffic signal bid item. <br /> 37 <br /> 38 If junction box adjustment involves conduit modification, as determined by the <br /> 39 ENGINEER, payment will be made in accordance with Section 1-09.6. <br /> 40 <br /> 41 All costs associated with the installation of the electrical service, illumination system, <br /> 42 rectangular rapid flashing beacon system and associated hardware shall be included in <br /> 43 the associated lump sum bid item for traffic signal system. <br /> 44 <br /> 45 (******) <br /> 46 Payment <br /> 47 <br /> 48 Section 8-20.5 is supplemented with the following: I <br /> INTERURBAN TRAIL TO YMCA PEDESTRIAN IMPROVEMENTS SPECIAL PROVISIONS <br /> WORK ORDER 3749 Page SP64 of SP68 MAY 2,2022 I <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.