Laserfiche WebLink
dry density,as determined by the modified Proctor test method,ASTM D 1557. The entire depth of fill at <br /> the project site should be compacted to 95 percent of the maximum dry density, in accordance with the <br /> procedure presented in Section 2-03.3(14)C, Method C for Compacting Earth Embankments of the <br /> Standard Specifications. Note that, if multiple fill sources are used for site filling, modified Proctor <br /> testing will be necessary for each fill type. We recommend that the thickness of each loose lift not exceed <br /> 8 to 10 inches, unless the contractor can demonstrate that adequate compaction is being achieved. In <br /> open areas,compaction of structural fill should be accomplished using a self-propelled vibratory roller. <br /> Backfill behind below-grade walls should also be compacted to 95 percent of its maximum dry density. <br /> Behind walls, extra care, thinner lifts, and smaller compaction equipment may be necessary to prevent <br /> damage to the walls or the development of excess lateral stresses in the wall. Geotechnical observation of <br /> fill placement and compaction(including field density measurements)should be provided throughout the <br /> full depth and plan extent of all filled areas. <br /> 3.5 TEMPORARY AND PERMANENT SLOPES <br /> Temporary unsupported slopes will be excavated to facilitate construction of the tunnels,utilidor, <br /> and other below-grade structures. Temporary slopes will also be present prior to wall construction along <br /> the east and west sides of the building. Actual slope configurations during construction and the <br /> maintenance of safe working conditions, including temporary excavation stability, should be the <br /> responsibility of the contractor, who is able to monitor the construction activities and has direct control <br /> over the means and methods of construction. All applicable local, state, and federal safety codes should <br /> be followed. All open cuts should be monitored by the contractor during and after excavation for any <br /> evidence of instability. If instability is detected, the contractor should flatten the side slopes or install <br /> temporary shoring. <br /> Temporary excavations in excess of 4 ft should be sloped in accordance with Safety Standards for <br /> Construction Work Part N,WAC 296-155-657,or shored. In the absence of groundwater seepage,the fill <br /> soils observed at the project site classify as Type C soils and should be inclined no steeper than 1'/2 H:1V <br /> (horizontal:vertical) according to WAC 296-155-657. Cuts into native till may be sloped at 1H:1V. <br /> Flatter slopes or temporary shoring may be required in areas where unstable slope conditions develop. <br /> Temporary excavation slopes should be protected by covering with plastic sheets or other means to <br /> prevent erosion. <br /> Permanent fill or cut slopes should be constructed no steeper than 2:1 (H:V). All permanent cut <br /> and fill slopes will need to be vegetated or otherwise protected to limit the potential for erosion as soon as <br /> practical after construction. Permanent slopes requiring immediate protection from the effects of erosion <br /> should be covered with either mulch or erosion control netting/blankets. Areas requiring permanent <br /> 5/16/14 P:\1423\002\O10\FileRm\R\Draft Bldg 40-58 Report\Bldg 40-58_draft rpt.docx INTERIM D RA F T <br /> 3-4 <br />