My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022/08/03 Council Agenda Packet
>
Council Agenda Packets
>
2022
>
2022/08/03 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2023 4:34:15 PM
Creation date
8/4/2022 11:21:01 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
8/3/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
`EVERETT <br />City Council Agenda Item Cover Sheet <br />Supplemental Agreement No.1 to the Standard Consultant Agreement with TranTech Engineering for <br />Project title: the remaining design and construction of the Edgewater Creek Bridge Replacement Project. <br />Council Bill # <br />Agenda dates requested: <br />August 3, 2022 <br />Briefing <br />Proposed action <br />Consent <br />Action <br />Ordinance <br />Public hearing <br />Yes <br />-X- <br />X No <br />Budget amendment: <br />Yes X No <br />PowerPoint presentation: <br />Yes X No <br />Attachments: <br />Proposed Agreement <br />Department(s) involved: <br />Public Works, Legal <br />Contact person: <br />Tom Hood <br />Phone number: <br />(425) 257-8809 <br />Email: <br />thood@everettwa.gov <br />Initialed by: <br />2 LS <br />Department head <br />Administration <br />Council President <br />Consideration: <br />Project: <br />Partner/Supplier: <br />Location: <br />Preceding action: <br />Fund: <br />Professional Services Agreement <br />Edgewater Creek Bridge Replacement <br />TranTech Engineering, LLC <br />Mukilteo Boulevard at Edgewater Creek <br />Professional Services Consultant Agreement 1/22/2020 <br />303 — Public Works Improvement Projects <br />Fiscal summary statement: <br />The programmed available funding for this project, as established by City of Everett <br />Ordinance No.3719-19 is $22,000,000. <br />The original Standard Consultant Agreement with TranTech Engineering for design <br />services had a maximum amount payable of $1,803,078. This supplement adds the <br />remaining design as well as construction phase engineering costs, not to exceed cost of <br />$1,706,134 for a new maximum amount payable of $3,509,212. <br />Project summary statement: <br />The plans and specifications are near completion for the Edgewater Creek Bridge <br />Replacement project. We will be moving to the bid and construction phase soon and this <br />supplement to the Standard Consultant Agreement will allow us to do so. <br />This project will remove and replace the existing Edgewater Creek Bridge, which was <br />built in 1946 and is a vital link in a chain of three bridges that provide the only access to <br />neighborhoods along Mukilteo Boulevard. <br />Recommendation (exact action requested of Council): <br />Authorize the Mayor to sign Supplemental Agreement #1 to the Standard Consultant <br />Agreement with TranTech Engineering, LLC for construction support services for the <br />Edgewater Creek Bridge Replacement for an additional $1,706,134. <br />
The URL can be used to link to this page
Your browser does not support the video tag.